BLD-Final | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Tony Young
|
|
|
208 994 9691 G code 4663 Inspection requested via web by Marty Pieroni
|
DOC - Permit Finaled | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Tony Young
|
|
|
c of o issued,, NOTE,, 2 mechanical permits for the same work is on this house,, verified final sticker
|
BLD-Energy code compliance | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Marty Pieroni
|
BLD-Framing/Rough-in | 5/11/2017 | 5/12/2017 | 5/12/2017 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Marty Pieroni
|
BLD-Framing/Rough-in | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | PART |
Tony Young
|
|
|
If possible call when heading that way i like to understand needed corrections so i can share properly if needed thanks Phone #: ###-#### Inspection requested via web by Marty Pieroni,, need truss engineering,, strap plates,, nail gable braces,, verify ,, fire block top of fire place,, etc,, see Marty.. ok to insulate
|
BLD-Wall Bracing | 4/17/2017 | 4/17/2017 | 4/18/2017 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Marty Pieroni needs to nail four holddown straps on front of house
|
BLD-Footing | 3/16/2017 | 3/16/2017 | 3/16/2017 | P | PART |
Tony Young
|
|
|
Matt Phone #: ###-####,, work in progress,, ok
|
Issue PAID IN FULL permit | | | 3/14/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 3/2/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 2/10/2017 | 2/10/2017 | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
Due 2-22 ePlan - FAIL - Roof plan does not match elevations. REScheck needs revisions. Building section required.
|
Routing - PLANNING | 3/1/2017 | | 3/2/2017 | | FAIL |
Jeff Lowe
|
|
|
Flipped Plan on Lot. front setback to living space shall be a minimum of 15-feet
|
Routing - PLANNING | 3/2/2017 | | 3/2/2017 | | PASS |
Jeff Lowe
|
|
|
|
Routing - PLAN CHECK | 3/2/2017 | | 3/2/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/2/2017 | | DONE |
|
|
|
All Met
|
Routing - PLAN CHECK | 3/1/2017 | | 3/1/2017 | | FAIL |
Brian McGowan
|
|
|
Modify REScheck. Modify Site Plan as per planning requirements
|
1st review completed | | | 2/22/2017 | | FAIL |
Brian McGowan
|
|
|
Roof plan does not match elevations. REScheck needs revisions. Building section required.
|
Routing - PLAN CHECK | 2/9/2017 | | 2/22/2017 | | FAIL |
Brian McGowan
|
|
|
Roof plan does not match elevations. REScheck needs revisions. Building section required.
|
Route to Impact Fee Review | 2/9/2017 | 2/12/2017 | 2/10/2017 | | PASS |
Cindy M. Gould
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - MECHANICAL | 2/9/2017 | | 2/10/2017 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 2/9/2017 | | 2/10/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/9/2017 | | DONE |
|
|
|
|
Intake Approval | | | 2/9/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/9/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 2/9/2017 | | 2/9/2017 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 2/9/2017 | | 2/9/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/9/2017 | | 2/9/2017 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 2/3/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 3 2017 5:00PM
|