BLD-Final | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | PASS |
Jim Sly
|
|
|
call for access // Zak Phone #: ###-#### See previous notes on final inspection.
|
DOC - Permit Finaled | 1/3/2018 | 1/3/2018 | 1/3/2018 | P | PASS |
Jim Sly
|
|
|
A temporary wood code complying handrail was installed on West side of stairway. Metal handrail at East side of stairway did not comply with code provisions.
|
BLD-Conference | 12/12/2017 | 12/14/2017 | 12/14/2017 | A | PART |
Tony Young
|
|
|
call 30 mins before-Zak Phone #: ###-####?s on final
|
BLD-Final | 12/8/2017 | 12/11/2017 | 12/11/2017 | A | NR |
Jim Sly
|
|
|
call for access // Zak Phone #: ###-#### Contr. Cancelled.
|
BLD-Aging Inspection | 12/1/2017 | 12/1/2017 | 12/5/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PASS |
Tony Young
|
|
|
Zak Phone #: ###-####
|
BLD-Framing/Rough-in | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Tony Young
|
|
|
Zak Phone #: ###-####
|
BLD-Wall Bracing | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Jim Sly
|
|
|
zak Phone #: ###-####
|
BLD-Footing | 5/11/2017 | 5/12/2017 | 5/12/2017 | A | PASS |
Jim Sly
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 5/11/2017 | 5/11/2017 | 5/11/2017 | P | PASS |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
OVERRIDE | | | 4/25/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/25/2017 | | DONE |
|
|
|
|
Telephone call | | | 4/25/2017 | | DONE |
|
|
|
called Zak and told him permit is ready and fee due. Per Morgan Web in PW sewer rating, swr impact fees due because previous home did not pay swr impact fees.
|
Issue PAID IN FULL permit | | | 4/25/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/25/2017 | | DONE |
|
|
|
Sewer wasn't paid on previous home so there are fees
|
Plan assigned to (BJM) | 2/8/2017 | 2/8/2017 | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
Due 2-20- FAIL -Engineering for covered porch and patio required, Beams need to be sized and supports at footings sized if needed, Wall bracing needs to be modified to work. _FAILED_ Structure issues. SENT BACK TO PLANNING AND ADDRESSING
|
Case Summary (BLD) | | | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - Addressing | 4/20/2017 | | 4/20/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/20/2017 | | 4/20/2017 | | PASS |
Morgan Webb
|
|
|
MUST SUPPLY OWN SERVICE LINE. NO CREDIT FOR DEMO.
|
Routing - PLAN CHECK | 4/19/2017 | | 4/19/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 4/19/2017 | | 4/19/2017 | | PASS |
Jeff Lowe
|
|
|
|
Plan resubmittals received | | | 4/17/2017 | | DONE |
|
|
|
received two complete new sets of plans, taken to BJM
|
Routing - PLAN CHECK | 4/7/2017 | | 4/7/2017 | | FAIL |
Brian McGowan
|
|
|
Structure issues
|
Plan resubmittals received | | | 3/14/2017 | | DONE |
|
|
|
Two copies of sheets A201, A202, A203, A204, A205, A206, A207, A401 and A402 taken to Brian Mc
|
1st review completed | | | 2/22/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering for covered porch and patio required, Beams need to be sized and supports at footings sized if needed, Wall bracing needs to be modified to work.
|
Routing - PLAN CHECK | 2/13/2017 | | 2/22/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering for covered porch and patio required, Beams need to be sized and supports at footings sized if needed, Wall bracing needs to be modified to work.
|
Routing - MECHANICAL | 2/17/2017 | | 2/17/2017 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 2/8/2017 | | 2/13/2017 | | FAIL |
Troy James
|
|
|
emailed corrections to air dynamics
|
Route to Impact Fee Review | 2/7/2017 | 2/10/2017 | 2/8/2017 | | PASS |
Cindy M. Gould
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - PLANNING | 2/8/2017 | | 2/8/2017 | | FAIL |
Jeff Lowe
|
|
|
record of survey not recorded
|
Routing - Addressing | 2/7/2017 | | 2/8/2017 | | FAIL |
Laura Hunter
|
|
|
Record of Survey has not been completed. We need the individual parcels from the County
|
Routing - PUBLIC WORKS | 2/7/2017 | | 2/8/2017 | | FAIL |
Rachael Beierle
|
|
|
failed no address available. unable to assign sewer permit at this time.
|
Plan assigned to (LEG) Tisha | 2/7/2017 | | 2/8/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/7/2017 | | DONE |
|
|
|
|
Intake Approval | | | 2/7/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/7/2017 | | DONE |
|
|
|
|
Meeting | | | 2/6/2017 | | DONE |
|
|
|
waiting for contractor to bring in stair section and electrical section
|
Application received | | 2/6/2017 | | | |
|
|
|
|