BLD-Final | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Tony Young
|
|
|
done per 425
|
BLD-Aging Inspection | 3/7/2018 | 3/7/2018 | 3/8/2018 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/6/2018 | 3/6/2018 | 3/8/2018 | | DONE |
Tony Young
|
|
|
|
BLD-Final | 10/20/2017 | 10/20/2017 | 10/23/2017 | P | DONE |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
BLD-Final | 10/20/2017 | 10/20/2017 | 10/23/2017 | P | FAIL |
Dave Hannah
|
|
|
Steve Phone #: ###-#### needs egress window in master bedroom handrail off back steps roffing on garage
|
BLD-Final | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | PEND |
Tony Young
|
|
|
Steve Phone #: ###-####,,
|
Zoning Approval | 10/20/2017 | 10/20/2017 | 10/20/2017 | | PASS |
Ted Vanegas
|
|
|
|
BLD-Final | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | NR |
Tony Young
|
|
|
Steve Phone #: ###-####,, needs ftrades and historical 1st,, no inspection made
|
BLD-Conference | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | DONE |
Jim Sly
|
|
|
WIP.
|
BLD-Aging Inspection | 10/5/2017 | 10/5/2017 | 10/13/2017 | | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 10/4/2017 | 10/4/2017 | 10/12/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 5/19/2017 | 5/23/2017 | 5/23/2017 | A | PASS |
Brandon Shaw
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 5/19/2017 | 5/23/2017 | 5/23/2017 | A | PASS |
Brandon Shaw
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 5/9/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Brandon Shaw
|
|
|
Steve Phone #: ###-####
|
BLD-Foundation | 4/7/2017 | 4/10/2017 | 4/10/2017 | A | PASS |
Dave Hannah
|
|
|
Terry Phone #: ###-####
|
Meeting | | | 4/6/2017 | | |
Brian McGowan
|
|
|
Site Plan had the proposed Garage dimensioned at 33', the structural plans were dimensioned at 31'. Tony Young questioned him about any possible problems. Structurally the additional 2' are a non issue. I consulted Katelyn Menuge, she said it still met their original approval of 33'.
|
BLD-Footing | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PART |
Tony Young
|
|
|
Terry Phone #: ###-####, garage.,, poured,, need to get the ok as built,
|
BLD-Footing | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | FAIL |
Tony Young
|
|
|
Terry Phone #: ###-####,, setbacks do not appear correct
|
Plan Modification Accepted | | | 3/30/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 3/30/2017 | | 3/30/2017 | | PASS |
Troy James
|
|
|
resubmitted acca report
|
BLD-Framing/Rough-in | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | NR |
Tony Young
|
|
|
Steve Phone #: ###-####,, walk through conf only,, need trades,, headers,, etc
|
Telephone call | | | 3/1/2017 | | DONE |
|
|
|
after talking to Steve he said the foundation permit is complete BLD16-04173 but the plb permit still needs the backflow inspection so i moved it to be attached to the current permit
|
Issue PAID IN FULL permit | | | 2/28/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 2/27/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 2/21/2017 | 2/21/2017 | 2/27/2017 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/24/2017 | | 2/27/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 2/27/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/27/2017 | | DONE |
|
|
|
Need RP
|
Routing - MECHANICAL | 2/23/2017 | | 2/24/2017 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 2/23/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (Zoning) | 2/21/2017 | 2/21/2017 | 2/21/2017 | A | PASS |
Jeff Lowe
|
|
|
resubmittal of engineering details. no exterior changes proposed
|
Routing Walk-In (Zoning) | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Katelyn Menuge
|
|
|
DRH16-00410 and DRH16-00413
|
Routing Walk-In (BLD) | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | FAIL |
Brian McGowan
|
|
|
Structure for Living space, proposed garage foundation and structure were on 8 1/2"x11" sheets by the engineer. The information needs to be on the Architect's drawings to the same scale as the other Architest's drawings with the engineers information and calculations as verification.
|
1st review completed | | | 2/6/2017 | | FAIL |
Brian McGowan
|
|
|
Structure for Living space, proposed garage foundation and structure were on 8 1/2"x11" sheets by the engineer. The information needs to be on the Architect's drawings or to the same scale as the other Architest's drawings with the engineers information and calculations as verification.
|
Routing - PLAN CHECK | 2/6/2017 | | 2/6/2017 | | FAIL |
Brian McGowan
|
|
|
Structure for Living space, proposed garage foundation and structure were on 8 1/2"x11" sheets by the engineer. The information needs to be on the Architect's drawings to the same scale as the other Architest's drawings with the engineers information and calculations as verification.
|
Application received | | 2/6/2017 | | | |
|
|
|
|