BLD-Final | 9/13/2017 | 9/14/2017 | 9/14/2017 | A | PASS |
Jim Sly
|
|
|
Contact with questions about the driveway, ACHD agreement in place - Randy Phone #: ###-####
|
DOC - Permit Finaled | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/5/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
Brandon Shaw
|
|
|
Randy Phone #: ###-####
|
BLD-Framing/Rough-in | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Mike Jordan
|
|
|
Randy Phone #: ###-####. All framing issues have been corrected.
|
BLD-Framing/Rough-in | 6/23/2017 | 6/26/2017 | 6/26/2017 | A | FAIL |
Mike Jordan
|
|
|
Randy Phone #: ###-####. Complete lateral bracing on AD01 mono trusses as shown on truss engineering. Install the straps for portal frames. Noted some areas wered exterior sheathing not attached. Correction notice poated.
|
BLD-Footing | 4/17/2017 | 4/18/2017 | 4/18/2017 | A | PASS |
Mike Jordan
|
|
|
Randy Phone #: ###-####
|
OVERRIDE | | | 3/21/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 3/21/2017 | 3/21/2017 | 3/21/2017 | A | PASS |
Nicolette Womack
|
|
|
Paved driveway shall be required for the first 20' from the right of way.
|
Routing Walk-In (BLD) | 3/21/2017 | 3/21/2017 | 3/21/2017 | A | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2017 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 3/21/2017 | | 3/21/2017 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 3/21/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/21/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/21/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | FAIL |
Christina Prado
|
|
|
needs a zoning certificate over 1000 sq. ft.
|
Application received | | 2/6/2017 | | | |
|
|
|
|