Second Notice | | 7/22/2017 | 8/10/2017 | | DONE |
|
|
|
Mailed 8-11-17
|
First Notice | | 6/17/2017 | 7/12/2017 | | DONE |
|
|
|
Mailed 7-13-17
|
Permanent Occupancy | | | 6/7/2017 | | DONE |
|
|
|
|
BLD-Final | 6/2/2017 | 6/5/2017 | 6/5/2017 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 6/2/2017 | 6/5/2017 | 6/5/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 5/23/2017 | 5/23/2017 | 5/23/2017 | P | PART |
Mike Jordan
|
|
|
jeff Phone #: ###-####. All isues resolved. ok for temp occ. will be ok for perm occ. once fire/life/safety signs perm.
|
Temporary Occupancy | 5/23/2017 | 8/21/2017 | 5/23/2017 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 5/19/2017 | 5/22/2017 | 5/22/2017 | A | PART |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Lower bathroom lavs to 34 inch max height. Provide ADA POS. ok for temp occ. when zoning signs off. (Needs two bushes at drive thru, being planted when on site.)
|
FIRE-Final Inspection | 5/19/2017 | 5/22/2017 | 5/22/2017 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with Scotts permission. I was given a list of trained/fire watch employees and the fire alarm permit has been submitted.
Jeff Phone #: ###-####
|
Zoning Approval | 5/22/2017 | 5/22/2017 | 5/22/2017 | | PASS |
Susan Riggs
|
|
|
|
FIRE-Final Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 | P | FAIL |
Troy Cobbley
|
|
|
Need the exit discharge lights repaired and a list of employees who are responcible for the fire watch. When they are repaired and list is provided and the fire alarm permit is submitted, per Scott, the project can have a temporary until the interconnect of the kitchen hood suppression system and the two AHU's has been tested.
Jeff Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 5/19/2017 | | DONE |
|
|
|
plan mod paid
|
OVERRIDE | | | 4/13/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 4/12/2017 | 4/12/2017 | 4/13/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 4/13/2017 | | 4/13/2017 | | PASS |
Carl Westfall
|
|
|
1st plan mod completed
|
Plan Modification Accepted | | | 4/13/2017 | | DONE |
|
|
|
Work flow in ePlanReview received
|
Plan Reviewer's activity | | | 4/13/2017 | | DONE |
|
|
|
1st plan mod approved and routed to the permits desk.
|
Permit Ready to Issue | | | 4/13/2017 | | DONE |
|
|
|
PLEASE do not re issue
|
BLD-Energy code compliance | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
Plan Modification Accepted | | | 4/12/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to remove FA system, reduce the fire rating in demising wall and extend fire sprinkler system
|
BLD-Framing/Rough-in | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | PART |
Mike Jordan
|
|
|
ok to insulate.
|
BLD-Framing/Rough-in | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | NR |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. ok to insulate exterior walls. Provide city set of approved plans.
|
Issue PAID IN FULL permit | | | 4/7/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/7/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/6/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 2/15/2017 | 2/15/2017 | 4/6/2017 | | PASS |
Carl Westfall
|
|
|
(3rd done) (Mar 7 - 15 days) (24 sheets) Growlers
|
Routing - MECHANICAL | 4/5/2017 | | 4/6/2017 | | PASS |
Troy James
|
|
|
Please copy your redlines to the latest version
|
Routing - PLUMBING | 4/5/2017 | | 4/6/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC. additional cross connection protection may be required
|
Routing PW Sewer Rating | 4/5/2017 | | 4/6/2017 | | PASS |
Rachael Beierle
|
|
|
Toilet and sink removed. making space into storage. no new customer area. no change in permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/6/2017 | | DONE |
|
|
|
***all requirements met 4-7-17 /CEV
***still needs RP 4-7-17 /CEV
need GC, RP & rev cert of val
|
Routing - PLAN CHECK | 4/4/2017 | | 4/5/2017 | | PASS |
Carl Westfall
|
|
|
3rd review approved
|
Plan resubmittals received | | | 4/4/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/30/2017 | | 4/3/2017 | | FAIL |
Carl Westfall
|
|
|
|
Routing - PLUMBING | 3/30/2017 | | 4/3/2017 | | FAIL |
Bill VanDegrift
|
|
|
address change marks
|
Plan resubmittals requested | | | 4/3/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/30/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/15/2017 | 3/18/2017 | 3/16/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 3/15/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/15/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/15/2017 | | 3/15/2017 | | FAIL |
Carl Westfall
|
|
|
|
Routing PW Environmental | 2/15/2017 | | 2/21/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - Erosion and Sediment | 2/15/2017 | | 2/17/2017 | | PASS |
Melissa Jannusch
|
|
|
Level 3 TI. ESC plan waiver
|
Routing - FIRE | 2/15/2017 | 2/15/2017 | 2/16/2017 | | PASS |
Katie Marron
|
|
|
comments attached to case.
|
Routing - MECHANICAL | 2/15/2017 | | 2/16/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/15/2017 | | 2/16/2017 | | FAIL |
Bill VanDegrift
|
|
|
1) prep sinks must be indirectly wasted
2) IDAPA 07.02.06.20-- dishwasher must be indirectly wasted.
|
Routing - PLANNING | 2/15/2017 | | 2/15/2017 | | PASS |
Cody Riddle
|
|
|
Allowed per use exception.
|
Routing - Addressing | 2/15/2017 | | 2/15/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/15/2017 | | 2/15/2017 | | PASS |
Rachael Beierle
|
|
|
REQUESTED MENU 02-15-2017 FROM CONNIE VIA PHONE
|
Intake Approval | | | 2/15/2017 | | PASS |
David Ferguson
|
|
|
CHD approved signed app uploaded in documents in e plan
|
Intake Approval | | | 2/10/2017 | | FAIL |
David Ferguson
|
|
|
Need #520 Checklist (Vanilla build-out into restaurant)
Naming Convention not followed
Plan sheets say "Preliminary Design / Not For Construction
|
Intake Approval | | | 2/10/2017 | | FAIL |
David Ferguson
|
|
|
1) Need fire flow letter from Suez Water
2) You've indicated on your checklist that information can be found on pages A.100 and A.601. These pages are not included in you submittal documents. Please include these pages on your resubmittal or revise the checklist to indicate the correct page number.
|
Application received | | | 2/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 8 2017 9:48AM
|