BLD-Final | 1/19/2018 | 1/19/2018 | 1/22/2018 | P | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####
|
BLD-Final | 1/18/2018 | 1/19/2018 | 1/22/2018 | A | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####
|
DOC - Permit Finaled | 1/22/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by David Wipper,, correction posted,, protection post,, handrail per code
|
PubWorks Occupancy Approval | 1/5/2018 | 1/5/2018 | 1/5/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Aging Inspection | 12/21/2017 | 12/21/2017 | 12/21/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/20/2017 | 12/20/2017 | 12/21/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Other | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | PASS |
Tony Young
|
|
|
Cobey Phone #: ###-####,, soffit base layer is complete
|
BLD-Wall Bracing | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | PART |
Tony Young
|
|
|
Cobey Phone #: ###-####,, shear is complete,, work in progress on soffits for wui
|
BLD-Wall Bracing | 7/28/2017 | 7/31/2017 | 7/31/2017 | A | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####,, interior ok
|
BLD-Energy code compliance | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by David Wipper
|
BLD-Wall Bracing | 7/5/2017 | 7/6/2017 | 7/6/2017 | A | PASS |
Jim Sly
|
|
|
Shear // Larry Phone #: ###-#### Exterior shear nailing only.....OK.
|
BLD-Footing | 4/7/2017 | 4/10/2017 | 4/10/2017 | P | DONE |
Tony Young
|
|
|
Chris Phone #: ###-####
|
PubWorks Subgrade Approval | 4/10/2017 | 4/10/2017 | 4/10/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PEND |
Tony Young
|
|
|
Chris Phone #: ###-####,, okay after soils approval
|
BLD-Footing | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PEND |
Tony Young
|
|
|
Chris Phone #: ###-####
|
BLD-Foundation | 4/5/2017 | 4/6/2017 | 4/6/2017 | P | PEND |
Tony Young
|
|
|
Chris Phone #: ###-####,, need soils approval
|
Issue PAID IN FULL permit | | | 3/23/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/23/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 3/14/2017 | | |
|
|
|
|
Plan assigned to (LEG) Tisha | 2/13/2017 | | 3/14/2017 | | DONE |
Tisha Gallop
|
|
|
2nd review 3/10; 1st review 3/2
|
Plan resubmittals received | | | 3/14/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/14/2017 | | 3/14/2017 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/14/2017 | | DONE |
|
|
|
All Met
|
Routing - PLAN CHECK | 3/6/2017 | | 3/10/2017 | | FAIL |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 3/6/2017 | | DONE |
|
|
|
|
1st review completed | | | 3/2/2017 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 2/13/2017 | | 3/2/2017 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 2/13/2017 | | 2/21/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 2/13/2017 | | 2/21/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Route to Impact Fee Review | 2/13/2017 | 2/16/2017 | 2/15/2017 | | PASS |
Cindy M. Gould
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - Erosion and Sediment | 2/13/2017 | | 2/15/2017 | | PASS |
Melissa Jannusch
|
|
|
BMPs: concrete washout, construction access (W side of lot), straw wattles are located around the north west perimeter of the site. Stock piles of dirt are located in the NW corner of the lot. The area to the East in the back of the lot is to remain undisturbed. During site prep ensure subdivision BMPs are installed and erosion are controlled before construction can begin.
|
Routing - FIRE | 2/13/2017 | 2/13/2017 | 2/14/2017 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for FD Access, hydrant availability and defensible space.
|
Routing - PLANNING | 2/13/2017 | | 2/14/2017 | | PASS |
Jeff Lowe
|
|
|
|
Application received | | | 2/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 13 2017 9:39AM
|
Plans ACCEPTED BY PLAN TECH | | | 2/13/2017 | | DONE |
|
|
|
|
Intake Approval | | | 2/13/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/13/2017 | | DONE |
|
|
|
|
Routing - Addressing | 2/13/2017 | | 2/13/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/13/2017 | | 2/13/2017 | | PASS |
Morgan Webb
|
|
|
|