BLD-Final | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Richard Stone
|
DOC - Permit Finaled | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | NR |
Mike Jordan
|
|
|
Richard Phone #: ###-####. Needs ele. final.
|
Change Expiration Date Only | | | 6/12/2019 | | DONE |
Jason Blais
|
|
|
A final 180 day extension is granted.
|
Change Expiration Date Only | | | 2/27/2019 | | DONE |
Jason Blais
|
|
|
|
BLD - Request for Extension | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Mike Jordan
|
|
|
Richard Phone #: ###-####-please call to meet
|
BLD-Conference | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Brandon Shaw
|
|
|
OK to coverf
|
BLD-Framing/Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PART |
Mike Jordan
|
|
|
I will be home. Takes a couple minutes for me to get to the door. Phone #: ###-#### Inspection requested via web by Richard Stone. Needs electrical and plumbing rough ins and inspected.
|
BLD-Wall Bracing | 7/25/2017 | 7/25/2017 | 7/25/2017 | A | PASS |
Mike Jordan
|
|
|
I will be home. Takes a couple minutes for me to get to the door. Phone #: ###-#### Inspection requested via web by Richard Stone. Ok to cover exterior.
|
Meeting | | | 5/10/2017 | | DONE |
|
|
|
called Colleen thinking that there needed to be approval for the ADU but there is an approval from P & Z in the building permit app paperwork
|
BLD-Foundation | 5/3/2017 | 5/4/2017 | 5/4/2017 | A | PART |
Mike Jordan
|
|
|
before 10am please // Zach Phone #: ###-####
|
BLD-Foundation | 5/1/2017 | 5/2/2017 | 5/2/2017 | A | PART |
Jim Sly
|
|
|
Zach Phone #: ###-#### Footing OK.
|
OVERRIDE | | | 2/16/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 2/16/2017 | 2/16/2017 | 2/16/2017 | A | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 2/16/2017 | 2/16/2017 | 2/16/2017 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 2/16/2017 | | 2/16/2017 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 2/16/2017 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 2/16/2017 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/16/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/16/2017 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 2/16/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 2/13/2017 | 2/13/2017 | 2/13/2017 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 2/13/2017 | 2/13/2017 | 2/13/2017 | P | FAIL |
David Ferguson
|
|
|
Need structural package to match the architectural drawings and have engineer stamp select strucural plan sheets.
|
1st review completed | | | 2/13/2017 | | DONE |
David Ferguson
|
|
|
|
Application received | | 2/13/2017 | | | |
|
|
|
|