BLD-Footing | 3/21/2017 | 3/22/2017 | 3/23/2017 | P | CANC |
Mike Jordan
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | PASS |
Mike Jordan
|
|
|
|
PubWorks Subgrade Approval | 3/23/2017 | 3/23/2017 | 3/23/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has be approved by Public Works . Call Jason Taylor at ###-#### for questions
|
Issue PAID IN FULL permit | | | 2/27/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 2/24/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 2/14/2017 | 2/14/2017 | 2/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - FIRE | | | 2/24/2017 | | PASS |
|
|
|
No review required.
|
Telephone call | | | 2/24/2017 | | DONE |
|
|
|
called Ryan to let know permit is ready
|
Routing - PLAN CHECK | | | 2/24/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 2/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 2/24/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 2/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/24/2017 | | DONE |
|
|
|
***all requirments met 2-27-17 /CEV
|
Routing - Erosion and Sediment | | | 2/23/2017 | | PASS |
Andy J. Long
|
|
|
BMPs fiber wattles along back of site, concrete washout, inlet protection
|
Routing - Addressing | 2/14/2017 | | 2/15/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/15/2017 | | 2/15/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 2/15/2017 | | 2/15/2017 | | PASS |
Jeff Lowe
|
|
|
|
Routing PW Grading-Hillside | 2/15/2017 | | 2/15/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor ###-####.
|
Routing PW Sewer Rating | 2/15/2017 | | 2/15/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/14/2017 | | DONE |
|
|
|
|
Application received | | 2/14/2017 | | | |
|
|
|
|
Routing PW Sewer Design | 3/2/2017 | | | | |
Kyle S. Rosenmeyer
|
|
|
|