First Notice | | 1/20/2019 | 2/7/2019 | | DONE |
|
|
|
mailed 2-11-19
|
BLD-Final | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PASS |
Mike Jordan
|
|
|
/Josh Phone #: ###-####
|
Permanent Occupancy | | | 1/10/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 12/31/2018 | 1/2/2019 | 1/2/2019 | P | PASS |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
FIRE-Final Inspection | 12/31/2018 | 1/2/2019 | 1/2/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Josh Phone #: ###-#### **PASS PER TROY**
|
BLD-Framing/Rough-in | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | FAIL |
Jim Storey
|
|
|
Josh Phone #: ###-#### A5.2 #1 not built per plan perlins can not penatrate 3 hr wall clips to be for support after wall is gyp. listing screw atchment not per listing submitted.
|
BLD-Footing | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Brandon Shaw
|
|
|
BUILDING #4
|
FIRE-Final Inspection | 1/3/2018 | 1/3/2018 | 1/3/2018 | P | CANC |
Troy Cobbley
|
|
|
Wrong building called in.
Cory Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/5/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/5/2017 | | DONE |
|
|
|
|
Routing - FIRE | 5/10/2017 | 5/10/2017 | 5/10/2017 | | PASS |
Katie Marron
|
|
|
signed off in ePlan by Fire Katie Marron
|
Plan assigned to (JG) | 2/27/2017 | 2/27/2017 | 5/10/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 3/30 Victory Storage #4 ePlan
|
Routing - PLAN CHECK | 5/1/2017 | | 5/10/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Sewer Design | 5/10/2017 | | 5/10/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
signed off in ePlan by Sewer Design Kyle Rosenmeyer
|
Routing PW Street Lights | 5/10/2017 | | 5/10/2017 | | PASS |
Tom Marshall
|
|
|
signed off in ePlan by Street Lights Tom Marshall
|
Routing PW Drainage | 5/10/2017 | | 5/10/2017 | | PASS |
Brian Murphy
|
|
|
signed off in ePlan by Drainage Brian Murphy
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/10/2017 | | DONE |
|
|
|
Need ACHD only as of 5/17/17 C_P /// Need revised COV (for each building), GC form, and ACHD
|
Routing - Design Review | 5/9/2017 | | 5/9/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH16-00402
Easement agreement received 5-8-17
|
Routing Off Site - STRUCTURAL | 5/1/2017 | | 5/1/2017 | | PASS |
Javier Guzman
|
|
|
Signed off in ePlan by AHJ Engineers Chris Holladay
|
Route to Impact Fee Review | 4/4/2017 | 4/7/2017 | 4/5/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - Erosion and Sediment | 2/27/2017 | | 4/4/2017 | | PASS |
Andy J. Long
|
|
|
Passed in ePlan by Erosion Melissa Jannusch
|
Routing Off Site - STRUCTURAL | 2/27/2017 | | 4/4/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in eplan by AHJ Engineers Chris Holladay
|
Routing PW Solid Waste | 2/27/2017 | | 4/4/2017 | | PASS |
Evan Carpenter
|
|
|
Passed in ePlan by Solid Waste Peter McCullough
|
Routing PW Sewer Design | 2/27/2017 | | 4/4/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Failed in ePlan by Sewer Design Kyle Rosenmeyer
|
Routing PW Street Lights | 2/27/2017 | | 4/4/2017 | | FAIL |
Tom Marshall
|
|
|
Failed in ePlan by Street Lights Tom Marshall
|
Routing PW Drainage | 2/27/2017 | | 4/4/2017 | | FAIL |
Brian Murphy
|
|
|
Failed in ePlan by Drainage Brian Murphy
|
1st review completed | | | 4/4/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 2/27/2017 | | 4/4/2017 | | FAIL |
Cody Riddle
|
|
|
|
Routing - PLANNING | 2/27/2017 | | 4/4/2017 | | PASS |
Cody Riddle
|
|
|
Passed in ePlan by Current Planning Cody Riddle
|
Routing - Design Review | 2/27/2017 | | 3/6/2017 | | FAIL |
Sarah Schafer
|
|
|
Cross Access agreement with parcel to the east requirement per DRH16-00402 prior to building permit sign off. Revised elevations also required for Design Review package to match.
|
Routing - FIRE | 2/27/2017 | 2/27/2017 | 3/1/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and email to architect
|
Routing - PLANNING Land Div | 2/27/2017 | | 2/28/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 2/27/2017 | | 2/27/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/27/2017 | | 2/27/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 2/27/2017 | | PASS |
|
|
|
|
Application received | | 2/14/2017 | | | |
|
|
|
|
Application received | | 2/14/2017 | | | |
|
|
|
|