Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD17-00270
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 2902 S BEVERLY ST
Project NameVictory Storage Building #5
Customer NumberBLD16-04564, BLD17-017-00267-273
ePlanReviewNo
Description
(VICTORY STORAGE – BUILDING #5) (8 PERMITS TOTAL FILED UNDER BLD16-04564) Permit to construct a new 13,680 sq. ft. storage building (82 storage units) and related site improvements. Scope of work includes: construction of a slab on grade concrete, concrete foundation, construction of steel stud framed exterior walls with metal siding, metal roof purlins with a metal roof, metal storage unit partition panels, installation of new overhead doors, new electrical, site work, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. The building is not fire sprinklered. Note: Special Inspections Required see form 310. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/20/20192/7/2019 DONE
mailed 2-11-19
BLD-Final1/9/20191/10/20191/10/2019APASS
DetailsMike Jordan
/Josh Phone #: ###-####
Permanent Occupancy  1/10/2019 DONE
Temporary Occupancy1/4/20194/4/20191/4/2019 DONE
DetailsTiffany Carson-Herker
BLD-Final12/5/201812/5/201812/5/2018PPART
DetailsJim Sly
please sign off if no plm working was done. gc gave a value for plm, but Josh stated none done for this building // Josh Phone #: ###-####
OK for Temp Occ. OK for Perm Occ when required handicap units complete.
BLD-Framing/Rough-in12/4/201812/4/201812/4/2018PPASS
DetailsMike Jordan
Josh-BLDG 5-would like late PM-please call when on way Phone #: ###-####. final layer of 5/8 type x rock ok on 3hr. firewall. Needs to firecaulk top and bottom of wall for final.
FIRE-Final Inspection12/4/201812/4/201812/4/2018PPASS
DetailsTroy Cobbley
Life safety passed

Josh-BLDG 5-would like late PM-please call when on way Phone #: ###-####
BLD-Framing/Rough-in11/30/201811/30/201811/30/2018PPART
DetailsDave Hannah
Josh Phone #: ###-#### fire wall sheet rook on souyh side ok
BLD-Framing/Rough-in11/28/201811/29/201811/29/2018AFAIL
DetailsMike Jordan
Call for access- Cory Phone #: ###-####. Needs to provide the 3hr. fire barrier wall.
BLD-Footing5/22/20185/22/20185/22/2018PPART
DetailsMike Jordan
Cory-please call for access code Phone #: ###-####. Work in progress. Will have special inspection.
Issue PAID IN FULL permit  6/5/2017 DONE
Print Occupancy Form  6/5/2017 DONE
Routing - FIRE5/10/20175/10/20175/10/2017 PASS
DetailsKatie Marron
signed off in ePlan by Fire Katie Marron
Plan assigned to (JG)2/27/20172/27/20175/10/2017 PASS
DetailsJavier Guzman
1st rev comp, 3/30 Victory Storage #5 ePlan
Routing PW Sewer Design5/10/2017 5/10/2017 PASS
DetailsKyle S. Rosenmeyer
signed off in ePlan by Sewer Design Kyle Rosenmeyer
Routing PW Street Lights5/10/2017 5/10/2017 PASS
DetailsTom Marshall
signed off in ePlan by Street Lights Tom Marshall
Routing PW Drainage5/10/2017 5/10/2017 PASS
DetailsBrian Murphy
signed off in ePlan by Drainage Brian Murphy
PLANS/APPL TAKEN TO FRONT DESK  5/10/2017 DONE
Permit Ready to Issue  5/10/2017 DONE
Need ACHD only as of 5/17/17 C_P /// Need revised COV (for each building), GC form, and ACHD
Routing - Design Review5/9/2017 5/9/2017 PASS
DetailsSarah Schafer
Approved per DRH16-00402
Easement agreement received 5-8-17
Routing - PLAN CHECK5/1/2017 5/1/2017 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL5/1/2017 5/1/2017 PASS
DetailsJavier Guzman
Signed off in ePlan by AHJ Engineers Chris Holladay
Route to Impact Fee Review4/4/20174/7/20174/5/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
Routing - Erosion and Sediment2/27/2017 4/4/2017 PASS
DetailsAndy J. Long
Passed in ePlan by Erosion Melissa Jannusch
Routing Off Site - STRUCTURAL2/27/2017 4/4/2017 FAIL
DetailsJavier Guzman
Failed in eplan by AHJ Engineers Chris Holladay
Routing PW Solid Waste2/27/2017 4/4/2017 PASS
DetailsEvan Carpenter
Passed in ePlan by Solid Waste Peter McCullough
Routing PW Sewer Design2/27/2017 4/4/2017 FAIL
DetailsKyle S. Rosenmeyer
Failed in ePlan by Sewer Design Kyle Rosenmeyer
Routing PW Street Lights2/27/2017 4/4/2017 FAIL
DetailsTom Marshall
Failed in ePlan by Street Lights Tom Marshall
Routing PW Drainage2/27/2017 4/4/2017 FAIL
DetailsBrian Murphy
Failed in ePlan by Drainage Brian Murphy
1st review completed  4/4/2017 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK2/27/2017 4/4/2017 FAIL
DetailsJavier Guzman
Routing - PLANNING2/27/2017 4/4/2017 PASS
DetailsCody Riddle
Passed in ePlan by Current Planning Cody Riddle
Routing - Design Review2/27/2017 3/6/2017 FAIL
DetailsSarah Schafer
Cross Access agreement with parcel to the east requirement per DRH16-00402 prior to building permit sign off. Revised elevations also required for Design Review package to match.
Routing - FIRE2/27/20172/27/20173/1/2017 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing - PLANNING Land Div2/27/2017 2/28/2017 PASS
DetailsTodd Tucker
Routing - Addressing2/27/2017 2/27/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/27/2017 2/27/2017 PASS
DetailsRachael Beierle
Intake Approval  2/27/2017 PASS
Application received 2/14/2017   
Application received 2/14/2017