First Notice | | 6/28/2018 | 7/11/2018 | | DONE |
|
|
|
mailed 7-12-18
|
Temporary Occupancy | 6/18/2018 | 9/16/2018 | 6/18/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason B approved a 30 day ext for the temp c of o
|
Permanent Occupancy | | | 6/18/2018 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2018 | | DONE |
|
|
|
emailed tandrews@wbtbc.com that the temp c of o was about to expire
|
BLD-Aging Inspection | 4/17/2018 | 4/17/2018 | 4/17/2018 | | PEND |
Mike Jordan
|
|
|
|
Temporary Occupancy | 3/23/2018 | 6/21/2018 | 3/23/2018 | | DONE |
Candy A. Nichols
|
|
|
Jasaon Blais ok'd 90 day ext good from 3/18/18
|
Telephone call | | | 3/22/2018 | | DONE |
|
|
|
emailed jconrad and tandrews that there is an ele permit not finaled so i can't change the temp c of o to a perm one. I asked them to request an extension until that final can be done
|
PubWorks Occupancy Approval | 3/20/2018 | 3/20/2018 | 3/20/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Aging Inspection | 2/13/2018 | 2/13/2018 | 2/13/2018 | | PASS |
Mike Jordan
|
|
|
|
Temporary Occupancy | 12/18/2017 | 3/18/2018 | 12/18/2017 | | DONE |
Christina Prado
|
|
|
|
PubWorks Temp Occupancy Appr | 12/18/2017 | 12/18/2017 | 12/18/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 12/13/2017 | 12/13/2017 | 12/13/2017 | P | PASS |
Mike Jordan
|
|
|
Cory Phone #: ###-####
|
Zoning Approval | 12/13/2017 | 12/13/2017 | 12/13/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Print Occupancy Form | | | 12/13/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
. Fire Station #17 approved Opticon and other gates.
Corey Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PART |
Mike Jordan
|
|
|
Cory Phone #: ###-####. Grid ok. Ok for tile AFTER electrical rough in inspection.
|
BLD-Energy code compliance | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
Brandon Shaw
|
|
|
Cory Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | PART |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Ok to insulate pending electrical rough in inspection.
|
BLD-Framing/Rough-in | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | NR |
Mike Jordan
|
|
|
Contractor called, will reschedule for tomorrow.
|
BLD-Framing/Rough-in | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | DEFR |
Mike Jordan
|
|
|
Cody Phone #: ###-####. No time.
|
BLD-Framing/Rough-in | 10/19/2017 | 10/23/2017 | 10/23/2017 | P | DONE |
Mike Jordan
|
|
|
Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 10/11/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Base layer for 3hr. fire barrier wall.
|
BLD-Footing | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | NR |
Mike Jordan
|
|
|
Cody Phone #: ###-####
|
BLD-Footing | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | DEFR |
Mike Jordan
|
|
|
Call for access Phone #: 2088698410 >> Inspection requested via mobile web by Cory Overlin. Will have special inspection.
|
Issue PAID IN FULL permit | | | 6/5/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/5/2017 | | DONE |
|
|
|
|
Routing - FIRE | 5/10/2017 | 5/10/2017 | 5/10/2017 | | PASS |
Katie Marron
|
|
|
signed off in ePlan by Fire Katie Marron
|
Plan assigned to (JG) | 2/27/2017 | 2/27/2017 | 5/10/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 3/30 Victory Storage #8 & Office ePlan
|
Routing PW Sewer Design | 5/10/2017 | | 5/10/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
signed off in ePlan by Sewer Design Kyle Rosenmeyer
|
Routing PW Street Lights | 5/10/2017 | | 5/10/2017 | | PASS |
Tom Marshall
|
|
|
signed off in ePlan by Street Lights Tom Marshall
|
Routing PW Drainage | 5/10/2017 | | 5/10/2017 | | PASS |
Brian Murphy
|
|
|
signed off in ePlan by Drainage Brian Murphy
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2017 | | DONE |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 5/10/2017 | | DONE |
|
|
|
Need ACHD only as of 5/17/17 C_P /// Need revised COV (for each building), GC form, and ACHD
|
Routing - MECHANICAL | 5/10/2017 | | 5/10/2017 | | PASS |
Troy James
|
|
|
signed off in ePlan by Mechanical Troy James
|
Routing - Design Review | 5/9/2017 | | 5/9/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH16-00402
Easement agreement received 5-8-17
|
Routing - PLAN CHECK | 5/1/2017 | | 5/1/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2017 | | 5/1/2017 | | PASS |
Javier Guzman
|
|
|
Signed off in ePlan by AHJ Engineers Chris Holladay
|
Route to Impact Fee Review | 4/4/2017 | 4/7/2017 | 4/5/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - Erosion and Sediment | 2/27/2017 | | 4/4/2017 | | PASS |
Andy J. Long
|
|
|
Passed in ePlan by Erosion Melissa Jannusch
|
Routing - PLAN CHECK | 2/27/2017 | | 4/4/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 2/27/2017 | | 4/4/2017 | | PASS |
Bill VanDegrift
|
|
|
Passed in ePlan by Plumbing Daryl Spivey
|
Routing - PLANNING | 2/27/2017 | | 4/4/2017 | | PASS |
Cody Riddle
|
|
|
Passed in ePlan by Current Planning Cody Riddle
|
Routing Off Site - STRUCTURAL | 2/27/2017 | | 4/4/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in eplan by AHJ Engineers Chris Holladay
|
Routing PW Solid Waste | 2/27/2017 | | 4/4/2017 | | PASS |
Evan Carpenter
|
|
|
Passed in ePlan by Solid Waste Peter McCullough
|
Routing PW Sewer Design | 2/27/2017 | | 4/4/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Failed in ePlan by Sewer Design Kyle Rosenmeyer
|
Routing PW Street Lights | 2/27/2017 | | 4/4/2017 | | FAIL |
Tom Marshall
|
|
|
Failed in ePlan by Street Lights Tom Marshall
|
Routing PW Drainage | 2/27/2017 | | 4/4/2017 | | FAIL |
Brian Murphy
|
|
|
Failed in ePlan by Drainage Brian Murphy
|
1st review completed | | | 4/4/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Design Review | 2/27/2017 | | 3/6/2017 | | PASS |
Sarah Schafer
|
|
|
Cross Access agreement with parcel to the east requirement per DRH16-00402 prior to building permit sign off. Revised elevations also required for Design Review package to match.
|
Routing - FIRE | 2/27/2017 | 2/27/2017 | 3/1/2017 | | FAIL |
Katie Marron
|
|
|
|
Routing - PLANNING Land Div | 2/27/2017 | | 2/28/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 2/27/2017 | | 2/27/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/27/2017 | | 2/27/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 2/27/2017 | | 2/27/2017 | | FAIL |
Troy James
|
|
|
Need plans stamped and signed by mechanical engineer.
|
Intake Approval | | | 2/27/2017 | | PASS |
|
|
|
|
Telephone call | | | 2/14/2017 | | DONE |
|
|
|
as per Richard at ALC bldg # 8 includes a 480 sq ft office
|
Application received | | 2/14/2017 | | | |
|
|
|
|
Application received | | 2/14/2017 | | | |
|
|
|
|