BLD-Final | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Brandon Shaw
|
|
|
Rolo Phone #: ###-####
|
DOC - Permit Finaled | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 8/3/2017 | 8/3/2017 | 8/3/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
OVERRIDE | | | 7/28/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 7/20/2017 | 7/20/2017 | 7/28/2017 | | DONE |
Brian McGowan
|
|
|
Plan Mod - small retaining wall.
|
CHANGE STATUS TO (ISS) | | | 7/28/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/28/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/28/2017 | | 7/28/2017 | | PASS |
Brian McGowan
|
|
|
No review needed for Plan Check. Grading wall under 4' tall.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/28/2017 | | DONE |
|
|
|
no fees due-DO NOT RE ISSUE
|
Routing PW Grading-Hillside | 7/20/2017 | | 7/27/2017 | | PASS |
Jason C. Taylor
|
|
|
Approved revised drawing ot add small retaining wall.
Jason Taylor
|
Plan Modification Accepted | | | 7/20/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod requested to revise the grading sheet
|
CHANGE STATUS TO (REV) | | | 7/20/2017 | | DONE |
|
|
|
|
BLD-Other | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | PASS |
Brandon Shaw
|
|
|
Rollo-soffit inspection Phone #: ###-####
|
BLD-Energy code compliance | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Framing/Rough-in | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Wall cover | 5/17/2017 | 5/18/2017 | 5/18/2017 | A | PART |
Brandon Shaw
|
|
|
Rollo would like a Shear wall cover inspection Phone #: ###-#### Walk through with framer, missing hold down- right side garage wall. Blocking and edge nailing- see red paint. Need straps, per engineering, up staires, right, front bedroom, see red paint. Ok for exterior wrap and window placement.
|
BLD-Foundation | 3/28/2017 | 3/29/2017 | 3/29/2017 | P | PASS |
Jim Sly
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 3/28/2017 | 3/28/2017 | 3/28/2017 | P | PASS |
Jim Storey
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
Routing PW Grading-Hillside | 3/28/2017 | | 3/28/2017 | | PASS |
Jim Wyllie
|
|
|
Received Geotechnical approval of building footing subgrade. Okay to schedule a footing inspection.
Jim Wyllie / ###-####
|
BLD-Footing | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | NR |
Jim Storey
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell no sign off from pw
|
Issue PAID IN FULL permit | | | 3/21/2017 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 3/16/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 3/16/2017 | | DONE |
|
|
|
MET
|
Plan assigned to (BJM) | 2/21/2017 | 2/21/2017 | 3/15/2017 | | DONE |
Brian McGowan
|
|
|
Due 3-7 Level 2 ePlan - FAIL -Front Elevation does not match plans. Misc. elements need corrections
|
Routing - PLAN CHECK | 3/15/2017 | | 3/15/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 3/13/2017 | | 3/13/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
1st review completed | | | 3/7/2017 | | FAIL |
Brian McGowan
|
|
|
Front Elevation does not match plans.
Misc. elements need corrections
|
Routing - PLAN CHECK | 2/16/2017 | | 3/7/2017 | | FAIL |
Brian McGowan
|
|
|
Front Elevation does not match plans.
Misc. elements need corrections
|
Route to Impact Fee Review | 2/16/2017 | 2/19/2017 | 2/21/2017 | | PASS |
Cindy M. Gould
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - MECHANICAL | 2/16/2017 | | 2/21/2017 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 2/16/2017 | | 2/21/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 2/16/2017 | | 2/21/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 2/16/2017 | 2/16/2017 | 2/17/2017 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for FD Access, Hydrant availability and defensible space.
FD Subdivision Comments are under SUB15-00005
|
Routing - Erosion and Sediment | 2/16/2017 | | 2/17/2017 | | PASS |
Andy J. Long
|
|
|
Harris Ranch North. Lot 87 Need to ensure current ESC subdivision issue near project site are resolved before site prep. BMPs: stabilized construction entrance, concrete washout, SWPPP sign staging area DI protection, silt fence/fiber wattle along west side of site/ barber dr.
|
Routing - PLANNING | 2/16/2017 | | 2/17/2017 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 2/16/2017 | | 2/16/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/16/2017 | | 2/16/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/16/2017 | | DONE |
|
|
|
|
Intake Approval | | | 2/16/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/16/2017 | | DONE |
|
|
|
|
Application received | | | 2/15/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 15 2017 9:19AM
|