Permit NumberBLD17-00277
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 1444 S ENTERTAINMENT AVE Unit: 410
Project NameCLICKBANK
Customer Number 
ePlanReviewYes
Description
(CLICKBANK – STEVEN’S HENAGAR BUILDING – ENTIRE 4TH STORY) (3-22-17 PLAN MODIFICATION TO UPGRADE THE STAIRWAY DOOR HARDWARE ON ALL STORIES. FOR STORIES ABOVE GRADE, STAIRWAY DOORS ARE PERMITTED TO BE LOCKED FROM THE SIDE OPPOSITE THE EGRESS SIDE, PROVIDED THEY ARE OPENABLE FROM THE EGRESS SIDE AND CAPABLE OF BEING UNLOCKED SIMULTANEOUSLY WITHOUT UNLATCHING UPON A SIGNAL BY EMERGENCY PERSONNEL FROM A SINGLE LOCATION INSIDE THE MAIN ENTRANCE TO THE BUILDING.) The fire sprinkler system is used for height and story increase. An early start was allowed under permit BLD17-00313. To construct interior tenant improvements within an existing shell space located on the 4th story of an existing building 5 story building. This story has never been occupied before. The tenant space will have a total floor area of about 15,407 square feet. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, interior doors, a delayed egress device on one of the elevator lobby doors, interior windows, gypsum board ceilings, suspended ceilings, cabinets, and finishes. This tenant space is not allowed to be occupied until all the door hardware on both stairways is corrected (i.e. made capable of being unlocked simultaneously without unlatching upon a signal from a single location inside the main entrance to the building) under this permit OR under a separate permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/15/20178/17/2017 DONE
This permit finaled on the web by Jeff Miller
Second Notice 7/22/20178/10/2017 DONE
Mailed 8-11-17
First Notice 6/16/20177/12/2017 DONE
Mailed 7-13-17
Permanent Occupancy  6/6/2017 DONE
BLD-Final5/18/20175/19/20175/19/2017PPART
DetailsMike Jordan
Quientin Phone #: ###-####-wants temp c of o. Ok for temp c.o. Will be ok for perm occ once plumbing signs perm.
Temporary Occupancy5/19/20178/17/20175/19/2017 DONE
DetailsBrittany Hill
BLD-Final5/18/20175/18/20175/18/2017PCANC
DetailsMike Jordan
Clinton Phone #: ###-####
FIRE-Final Inspection5/17/20175/18/20175/18/2017APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in3/28/20173/29/20173/29/2017PPASS
DetailsMike Jordan
Colton Phone #: ###-####. Interior steel stud frame walls and hardlids for restrooms ok.
BLD-Wall Bracing3/22/20173/23/20173/23/2017PCANC
DetailsMike Jordan
East side // Quinton Phone #: ###-####
BLD-Framing/Rough-in3/23/20173/23/20173/23/2017PPASS
DetailsMike Jordan
East side // Quinton Phone #: ###-####. Interior steel stud framed walls for east half ok.
Plan assigned to (CJW)3/16/20173/16/20173/22/2017 PASS
DetailsCarl Westfall
plan mod (1st done)
Plan Reviewer's activity  3/22/2017 PASS
The Plan Mod was approved and routed to the permits desk.
Permit Ready to Issue  3/22/2017 DONE
Plan mod ONLY - DO NOT RE-ISSUE
CHANGE STATUS TO (ISS)  3/22/2017 DONE
Plan Mod
BLD-Framing/Rough-in3/20/20173/21/20173/21/2017PPASS
DetailsMike Jordan
Quinton Phone #: ###-####. Interior steel stud framed walls at break room and conferance rooms only, west half of building.
Routing - FIRE3/20/2017 3/21/2017 PASS
DetailsKatie Marron
Plan modifications to exit door hardware reviewed. Revised comments attached to plan.
Routing - PLAN CHECK3/17/2017 3/20/2017 PASS
DetailsCarl Westfall
Drawings approved with redlines
Plan Modification Accepted  3/17/2017 DONE
Workflow in ePlanReview received on this date
BLD-Wall cover3/15/20173/16/20173/16/2017PPASS
DetailsMike Jordan
Clinton Phone #: ###-####. Exterior walls only.
Plan Modification Accepted  3/16/2017 DONE
scanned plan mod permit app in e plan review and assigned to Carl W
Issue PAID IN FULL permit  3/14/2017 DONE
DetailsChristina Prado
Print Occupancy Form  3/14/2017 DONE
DetailsChristina Prado
Plan assigned to (CJW)2/16/20172/16/20173/13/2017 PASS
DetailsCarl Westfall
(1st done) (Mar 8 - 15 days) (28 sheets) Mar 1 CLICKBANK
Plan resubmittals received  3/13/2017 DONE
Routing - PLAN CHECK3/13/2017 3/13/2017 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  3/13/2017 DONE
Permit Ready to Issue  3/13/2017 DONE
DetailsChristina Prado
All requirements met
Route to Impact Fee Review2/24/20172/27/20173/6/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
1st review completed  2/24/2017 DONE
Plan resubmittals requested  2/24/2017 DONE
Routing - PLAN CHECK2/16/2017 2/24/2017 FAIL
DetailsCarl Westfall
Tried to call the architect to discuss the plan review report but their phone system would not accept my call
Routing - MECHANICAL2/16/2017 2/22/2017 PASS
DetailsTroy James
Routing - FIRE2/16/20172/16/20172/21/2017 PASS
DetailsKatie Marron
Comments attached to case.
Routing - PUBLIC WORKS2/16/2017 2/17/2017 PASS
DetailsRachael Beierle
CONTAcT WBSD TO OBTAIN PERMIT
Routing - PLUMBING2/16/2017 2/17/2017 PASS
DetailsBill VanDegrift
asse 1070 mixing valves at public lavs required
Routing - Addressing2/16/2017 2/16/2017 PASS
DetailsLaura Hunter
Intake Approval  2/16/2017 PASS
DetailsJavier Guzman
Application received  2/15/2017 DONE
Application submitted via PDS Online on Feb 15 2017 11:37AM