Third Notice | | 10/17/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
Second Notice | | 10/5/2017 | 10/12/2017 | | DONE |
|
|
|
Mailed 10-13-17
|
First Notice | 8/24/2017 | 8/24/2017 | 9/25/2017 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 8/21/2017 | 8/22/2017 | 8/24/2017 | P | PASS |
Jim Storey
|
|
|
Josh Phone #: ###-#### si report ok
|
DOC - Permit Finaled | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 8/23/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. These are hot water panels not solar/electric panels. I noted no electrical except for a temperature sensor.
Josh Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/17/2017 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/28/2017 | 4/28/2017 | 7/13/2017 | | PASS |
Carl Westfall
|
|
|
(1st done) (May 18 - 15 days) (11 sheets) BOI - Boise City Air Terminal - Solar Hot Water
|
Routing Off Site - STRUCTURAL | 7/11/2017 | | 7/13/2017 | | PASS |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/13/2017 | | DONE |
|
|
|
Need GC Form and Revised Cert of Value
|
Routing - PLAN CHECK | 7/7/2017 | | 7/11/2017 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 7/7/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/19/2017 | | 6/20/2017 | | FAIL |
Carl Westfall
|
|
|
Neither of the Consultant Structural Engineers concerns were addressed. The workflow was sent back to the applicant so that documents resolving those concerns could be uploaded.
|
Plan resubmittals requested | | | 6/20/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/19/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/9/2017 | 6/12/2017 | 6/9/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 4/28/2017 | | 6/9/2017 | | FAIL |
Carl Westfall
|
|
|
Additional information required
|
1st review completed | | | 6/9/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/9/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/28/2017 | | 5/11/2017 | | FAIL |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
Routing - Design Review | 4/28/2017 | | 5/9/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing - ELECTRICAL | 4/28/2017 | | 5/4/2017 | | CANC |
Javier Guzman
|
|
|
No review required
|
Routing - FIRE | 4/28/2017 | 4/28/2017 | 5/1/2017 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - MECHANICAL | 4/28/2017 | | 5/1/2017 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 4/28/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 4/28/2017 | | 4/28/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 4/28/2017 | | 4/28/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/28/2017 | | 4/28/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 4/28/2017 | | 4/28/2017 | | PASS |
Andy J. Long
|
|
|
No ESC permit required. No earth disturbance or excavation required for project.
|
Intake Approval | | | 4/11/2017 | | FAIL |
Javier Guzman
|
|
|
Incomplete prescreen submittals, please upload the required remaining requested additional documents below:
• The uploaded engineering is stamped and signed by a California engineer and not accepted in the state of Idaho, please provide Structural calculations and details stamped and signed by an Idaho licensed engineer for new the solar panels on the roof.
|
Intake Approval | | | 4/5/2017 | | FAIL |
Javier Guzman
|
|
|
Incomplete prescreen submittals, please upload the required remaining requested additional documents below:
• Please provide a Site specific fire flow at hydrants letter from Suez Water or other public water provider. Include static pressure if sprinklers are to be installed
• Please provide a cover sheet with the building Code Analysis/Building Data on front sheet of plans which includes: code year, occupancy group, construction type, fire suppression system.
-2012 International Building Code
-Idaho State Plumbing Code (Including Chapter 13 – Medical Gas); based on the 2009 Uniform Plumbing Code
-2012 International Mechanical Code and Appendix A
-2012 International Fuel Gas Code and Appendices A, B, C, and D
-2012 International Fire Code
-Occupancies include A-2, A-3, B, M, and S-1.
-Construction type IA
-Fully fire sprinklered
• Please provide Structural calculations and details stamped and signed by an Idaho licensed engineer for new the solar panels on the roof.
• Please provide solar panel manufacturer specifications. Specifications need to show panels and modules as listed and labeled.
• Please provide ICC-ES Evaluation Services Report for all solar mounting brackets used to attach the solar panels to the roof structure.
• Please provide Fire resistive assembly penetrations details for any new or existing rated conditions and proposed changes to rated wall(s) & ceiling(s)
|
Intake Approval | | | 2/16/2017 | | FAIL |
Javier Guzman
|
|
|
Incomplete prescreen submittals, please upload or revise the requested additional documents below:
• Form #304 – Registered Design Professional form
• Site specific fire flow at hydrants letter from Suez Water or other public water provider. Include static pressure if sprinklers are to be installed
• Plan sheets shall be uploaded individually and in the landscape position per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf
• Individual plan sheet drawing file names must include the first characters of the discipline name, followed by the sheet number and name per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf
• All plan sheets must reserve a space on the bottom right corner for City approval stamps per ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf
• Code Analysis/Building Data on front sheet of plans which includes: code year, occupancy group, construction type, fire suppression system.
-2012 International Building Code
-Idaho State Plumbing Code (Including Chapter 13 – Medical Gas); based on the 2009 Uniform Plumbing Code
-2012 International Mechanical Code and Appendix A
-2012 International Fuel Gas Code and Appendices A, B, C, and D
-2012 International Fire Code
-Occupancies include A-2, A-3, B, M, and S-1.
-Construction type IA
-Fully fire sprinklered
• Structural calculations and details stamped and signed by an Idaho licensed engineer.
• Provide solar panel manufacturer specifications. Specifications need to show panels and modules as listed and labeled.
• ICC-ES Evaluation Services Report for all mounting brackets used to attach the panels to the roof structure.
• Fire resistive assembly penetrations details for any new or existing rated conditions and proposed changes to rated wall(s) & ceiling(s)
|
Application received | | | 2/15/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 15 2017 3:03PM
|