First Notice | | 1/27/2018 | 1/17/2018 | | DONE |
|
|
|
This permit finaled on the web by Brian McCoy
|
FIRE-Final Inspection | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler contractor re-evaluated the commodities after items were removed, changes to the fire sprinkler system not required after storage change. Final life fire safety inspection complete.
|
Print Occupancy Form | | | 1/17/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/17/2018 | | DONE |
|
|
|
|
Telephone call | | | 1/17/2018 | | DONE |
|
|
|
Brian called asked me to email him the C of O so i did
|
FIRE-Final Inspection | 1/10/2018 | 1/10/2018 | 1/10/2018 | A | PART |
Jim Page
|
|
|
Refer to notes made on 8/16/2017,
|
Permanent Occupancy | | | 1/10/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/10/2018 | | DONE |
|
|
|
issued final CO by mistake. Still need fire life safety per Jim Page
|
BLD-Final | 12/26/2017 | 12/26/2017 | 12/26/2017 | P | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-#### handrails corrected and compliant/ pending plan reviewers aproval for perm occ.
|
BLD-Final | 12/15/2017 | 12/18/2017 | 12/18/2017 | A | PART |
Jim Storey
|
|
|
please call ahead for access, about 20 min // Temp CO request - Brian Phone #: ###-#### handrail extentions main entry not corect/ planreview pending info and has ok temp occ.
|
BLD-Final | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | NR |
Jim Storey
|
|
|
Please call Brian W 30 Min Prior for Access Phone #: ###-#### Inspection requested via web by Brian McCoy
|
BLD-Card not on site to sign | 8/15/2017 | 8/16/2017 | 8/16/2017 | P | FAIL |
Jim Storey
|
|
|
call 30 mins ahead for acress- Jamie Phone #: ###-#### ocupied w/o aprovals/ both exit stairs non comliant run/ handrails non compliant/ canopy over stair can not find permit// exit with in hallway of office 36 inches in exit path// office warehouse door lock broken and instaled keyed one side.
|
FIRE-Final Inspection | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | PART |
Jim Page
|
|
|
Contacted fire sprinkler contractor in regards to adequate fire sprinkler protection for commodities being stored in the storage racks. Fire sprinkler protection has to be increased for proper coverage of stored commodities Fire sprinkler permit for demo work is complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags. Partial final inspection complete for life fire safety, fire sprinkler work for racks will need to completed at a later date, after fire sprinkler work is completed life fire safety for BLD permit can be finaled.
|
BLD-Final | 6/28/2017 | 6/29/2017 | 6/28/2017 | P | CANC |
Jim Storey
|
|
|
Please Call Brian McCoy 30min Prior for access 2 ###-#### Phone #: ###-#### >> Inspection requested via web by Brian McCoy Inspection cancelled from web by: Brian McCoy
|
FIRE-Final Inspection | 6/28/2017 | 6/29/2017 | 6/28/2017 | A | CANC |
Jim Page
|
|
|
Please Call Brian McCoy 30min Prior for access 2 ###-#### Phone #: ###-#### >> Inspection requested via web by Brian McCoy Inspection cancelled from web by: Brian McCoy
|
Routing - FIRE | 6/28/2017 | 6/28/2017 | 6/28/2017 | | PASS |
Scott Arellano
|
|
|
Final approval will be done pending a sprikler analysis for the commodities being stored on the existing racking system.
|
Plan assigned to (CDM) | 4/28/2017 | 4/28/2017 | 6/28/2017 | | PASS |
Carl D Madsen
|
|
|
(1st done) due 2/23 - Occ. Eval. - Need engineering for mezzanine per previous building permit requirements.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/28/2017 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2017 | | DONE |
|
|
|
Sent an email to Kevin and Nicholas, both numbers were to two different people, informing them that this permit is ready.
|
Print Occupancy Form | | | 6/28/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/28/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/27/2017 | | 6/27/2017 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 6/27/2017 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 5/4/2017 | | DONE |
Carl D Madsen
|
|
|
Sent E-mail to patrick for an update on the project.
|
Plan assigned to (DAF) | 2/17/2017 | 2/17/2017 | 4/28/2017 | | DEFR |
David Ferguson
|
|
|
(1st done) due 2/23 - Occ. Eval. - Need engineering for mezzanine per previous building permit requirements.
|
Routing - PLAN CHECK | 2/17/2017 | | 2/23/2017 | | FAIL |
David Ferguson
|
|
|
|
1st review completed | | | 2/23/2017 | | FAIL |
David Ferguson
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/17/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/17/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/17/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 2/17/2017 | | | |
|
|
|
|