Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-00303
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 1287 W BOEING ST
Project NameDepartment of Veterans Affairs
Customer Number 
ePlanReviewNo
Description
(DEPARTMENT OF VETERAN AFFAIRS) FINAL SIGN OFF BY FIRE WILL BE PENDING A SPRINKLER ANALYSIS FOR THE COMODITIES STORED IN THE EXISTING RACKING. Aplication for inspection to determine the requirements for the issuance of a certificate of occupancy for an existing 7,501 sq. ft. tenant space previously occupied by Idaho Specialized Transportation. Some minor work is occuring but is limited tto the removal of some stairs to an area above the offices. This work is being allowed because the area above the offices is not allowed to be used for any purpose per BLD01-00388. The original racking permit is BLD01-01206. There is no change in occupancy under this permit. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/27/20181/17/2018 DONE
This permit finaled on the web by Brian McCoy
FIRE-Final Inspection1/17/20181/17/20181/17/2018PPASS
DetailsJim Page
Fire sprinkler contractor re-evaluated the commodities after items were removed, changes to the fire sprinkler system not required after storage change. Final life fire safety inspection complete.
Print Occupancy Form  1/17/2018 DONE
Permanent Occupancy  1/17/2018 DONE
Telephone call  1/17/2018 DONE
Brian called asked me to email him the C of O so i did
FIRE-Final Inspection1/10/20181/10/20181/10/2018APART
DetailsJim Page
Refer to notes made on 8/16/2017,
Permanent Occupancy  1/10/2018 DONE
CHANGE STATUS TO (ISS)  1/10/2018 DONE
issued final CO by mistake. Still need fire life safety per Jim Page
BLD-Final12/26/201712/26/201712/26/2017PPASS
DetailsJim Storey
Brian Phone #: ###-#### handrails corrected and compliant/ pending plan reviewers aproval for perm occ.
BLD-Final12/15/201712/18/201712/18/2017APART
DetailsJim Storey
please call ahead for access, about 20 min // Temp CO request - Brian Phone #: ###-#### handrail extentions main entry not corect/ planreview pending info and has ok temp occ.
BLD-Final11/21/201711/21/201711/21/2017PNR
DetailsJim Storey
Please call Brian W 30 Min Prior for Access Phone #: ###-#### Inspection requested via web by Brian McCoy
BLD-Card not on site to sign8/15/20178/16/20178/16/2017PFAIL
DetailsJim Storey
call 30 mins ahead for acress- Jamie Phone #: ###-#### ocupied w/o aprovals/ both exit stairs non comliant run/ handrails non compliant/ canopy over stair can not find permit// exit with in hallway of office 36 inches in exit path// office warehouse door lock broken and instaled keyed one side.
FIRE-Final Inspection8/15/20178/16/20178/16/2017APART
DetailsJim Page
Contacted fire sprinkler contractor in regards to adequate fire sprinkler protection for commodities being stored in the storage racks. Fire sprinkler protection has to be increased for proper coverage of stored commodities Fire sprinkler permit for demo work is complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags. Partial final inspection complete for life fire safety, fire sprinkler work for racks will need to completed at a later date, after fire sprinkler work is completed life fire safety for BLD permit can be finaled.
BLD-Final6/28/20176/29/20176/28/2017PCANC
DetailsJim Storey
Please Call Brian McCoy 30min Prior for access 2
###-#### Phone #: ###-#### >> Inspection requested via web by Brian McCoy Inspection cancelled from web by: Brian McCoy
FIRE-Final Inspection6/28/20176/29/20176/28/2017ACANC
DetailsJim Page
Please Call Brian McCoy 30min Prior for access 2
###-#### Phone #: ###-#### >> Inspection requested via web by Brian McCoy Inspection cancelled from web by: Brian McCoy
Routing - FIRE6/28/20176/28/20176/28/2017 PASS
DetailsScott Arellano
Final approval will be done pending a sprikler analysis for the commodities being stored on the existing racking system.
Plan assigned to (CDM)4/28/20174/28/20176/28/2017 PASS
DetailsCarl D Madsen
(1st done) due 2/23 - Occ. Eval. - Need engineering for mezzanine per previous building permit requirements.
PLANS/APPL TAKEN TO FRONT DESK  6/28/2017 DONE
Permit Ready to Issue  6/28/2017 DONE
Telephone call  6/28/2017 DONE
Sent an email to Kevin and Nicholas, both numbers were to two different people, informing them that this permit is ready.
Print Occupancy Form  6/28/2017 DONE
Issue PAID IN FULL permit  6/28/2017 DONE
Routing - PLAN CHECK6/27/2017 6/27/2017 PASS
DetailsCarl D Madsen
Case Summary (BLD)  6/27/2017 DONE
Plan Reviewer's activity  5/4/2017 DONE
DetailsCarl D Madsen
Sent E-mail to patrick for an update on the project.
Plan assigned to (DAF)2/17/20172/17/20174/28/2017 DEFR
DetailsDavid Ferguson
(1st done) due 2/23 - Occ. Eval. - Need engineering for mezzanine per previous building permit requirements.
Routing - PLAN CHECK2/17/2017 2/23/2017 FAIL
DetailsDavid Ferguson
1st review completed  2/23/2017 FAIL
DetailsDavid Ferguson
Plans ACCEPTED BY PLAN TECH  2/17/2017 DONE
DetailsChristina Prado
Intake Approval  2/17/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  2/17/2017 DONE
DetailsChristina Prado
Application received 2/17/2017