Print Statement | | | 8/8/2018 | | DONE |
|
|
|
Sent 1st late notice
|
Print Statement | | | 5/2/2018 | | DONE |
|
|
|
|
Second Notice | | 3/24/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
First Notice | | 2/23/2018 | 3/14/2018 | | DONE |
|
|
|
Mailed 3-15-18
|
Permanent Occupancy | | | 2/13/2018 | | DONE |
|
|
|
|
BLD-Final | 2/9/2018 | 2/12/2018 | 2/12/2018 | P | PASS |
Dave Hannah
|
|
|
AJ Phone #: ###-####
|
FIRE-Final Inspection | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | PASS |
Scott Arellano
|
|
|
pass per Scott. new exit sign obstructing existing sprinkler head to be lowered or relocated
|
Print Occupancy Form | | | 2/12/2018 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/7/2018 | 2/8/2018 | 2/8/2018 | A | PASS |
Dave Hannah
|
|
|
AJ Phone #: ###-####
|
Permit Ready to Issue | | | 2/7/2018 | | DONE |
|
|
|
DO NOT REISSUE plan mod fees due
|
CHANGE STATUS TO (ISS) | | | 2/7/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/7/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/7/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/13/2017 | 12/13/2017 | 2/6/2018 | | PASS |
Carl Westfall
|
|
|
x (1st done) Plan mod - Balsam Hill - Union Block (routed back to applicant)
|
Plan resubmittals received | | | 2/6/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/6/2018 | | 2/6/2018 | | PASS |
Carl Westfall
|
|
|
|
Plan Reviewer's activity | | | 2/6/2018 | | PASS |
|
|
|
3rd plan mod approved
|
Routing PW Sewer Rating | 12/13/2017 | | 12/14/2017 | | PASS |
Morgan Webb
|
|
|
Two toilet rooms being eliminated
|
Routing - Addressing | 12/13/2017 | | 12/14/2017 | | PASS |
Doug Chausow
|
|
|
Access to some of the Union Block building 2nd story will be through the Fidelity Building. Discuss addressing with the Architect.
|
Plan resubmittals requested | | | 12/14/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/13/2017 | | 12/13/2017 | | FAIL |
Carl Westfall
|
|
|
Need signed plan mod letter
|
Plan Modification Accepted | | | 12/13/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod #3 - to implement the changes need to create an opeing between the Union Block & Fidelity bldgs
|
BLD-Final | 10/13/2017 | 10/13/2017 | 10/16/2017 | P | PART |
Dave Hannah
|
|
|
AJ Phone #: ###-#### ok for temp occ needs door and door hardware restroom signage and handrail on back stairs
|
FIRE-Final Inspection | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work passed/complete.
|
FIRE-Final Inspection | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | CANC |
Jim Page
|
|
|
Duplicate inspection request, this request is cancelled.
|
BLD-Wall cover | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PASS |
Dave Hannah
|
|
|
AJ Phone #: ###-#### bench area filled with insulat?ion
|
BLD-Conference | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | PASS |
Dave Hannah
|
|
|
wants to discuss what needs for temp occ // AJ Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PASS |
Dave Hannah
|
|
|
AJ Phone #: ###-####
|
Print Occupancy Form | | | 9/5/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/5/2017 | | DONE |
|
|
|
plan mod paid and approved
|
Plan assigned to (CJW) | 8/25/2017 | 8/25/2017 | 8/30/2017 | | PASS |
Carl Westfall
|
|
|
plan mod
|
Routing - PLAN CHECK | 8/25/2017 | | 8/30/2017 | | PASS |
Carl Westfall
|
|
|
2nd plan mod approved
|
Plan Reviewer's activity | | | 8/30/2017 | | PASS |
|
|
|
2nd plan mod approved
|
Permit Ready to Issue | | | 8/30/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan Mod
DO NOT RE-IEEUE PERMIT, change status to ISS once all fees are paid
|
BLD-Conference | 8/25/2017 | 8/25/2017 | 8/25/2017 | P | PASS |
Dave Hannah
|
|
|
aaron Phone #: ###-####
|
Plan Modification Accepted | | | 8/25/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to make updates to floor plan as detailed on application
|
BLD-Framing/Rough-in | 8/9/2017 | 8/9/2017 | 8/9/2017 | P | PASS |
Jim Storey
|
|
|
partial // AJ Phone #: ###-#### lobby east and west wall infil ok to cover
|
CHANGE STATUS TO (ISS) | | | 7/19/2017 | | DONE |
|
|
|
Plan Mod
|
Plan assigned to (CJW) | 7/7/2017 | 7/7/2017 | 7/13/2017 | | PASS |
Carl Westfall
|
|
|
**** Plan mod review completed
|
Plan Reviewer's activity | | | 7/13/2017 | | PASS |
Carl Westfall
|
|
|
Plan mod approved
|
Permit Ready to Issue | | | 7/13/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Routing PW Sewer Rating | 7/11/2017 | | 7/12/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLAN CHECK | 7/7/2017 | | 7/11/2017 | | PASS |
Carl Westfall
|
|
|
|
Plan Modification Accepted | | | 7/7/2017 | | DONE |
|
|
|
Plan Mod to eliminate all work in basement, select changes to intertior stairs, relocation of plumbing fixtures and door locations
|
Issue PAID IN FULL permit | | | 6/22/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/22/2017 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 2/22/2017 | 2/22/2017 | 4/6/2017 | | PASS |
Carl Westfall
|
|
|
(3rd done) (Mar 14 - 15 days) (11 sheets) Union Block, Balsam Hill T.I.
|
Routing - PLAN CHECK | 4/4/2017 | | 4/6/2017 | | PASS |
Carl Westfall
|
|
|
Drawings approved with redlines after alternate approval by the Building Official.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/6/2017 | | DONE |
|
|
|
***Met 5-3-17 CAN***need GC & rev cert of val
|
Plan resubmittals received | | | 4/4/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/3/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/3/2017 | | 4/3/2017 | | FAIL |
Carl Westfall
|
|
|
2nd plan review completed
|
Plan resubmittals requested | | | 4/3/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/17/2017 | 3/20/2017 | 3/17/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 2/22/2017 | | 3/17/2017 | | FAIL |
Carl Westfall
|
|
|
Completed the IBC plan review
|
1st review completed | | | 3/17/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/17/2017 | | DONE |
|
|
|
|
Routing - FIRE | 2/22/2017 | 2/22/2017 | 2/28/2017 | | PASS |
Katie Marron
|
|
|
Comments attached to case
|
Intake Approval | | | 2/22/2017 | | PASS |
David Ferguson
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2017 | | 2/22/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 2/22/2017 | | 2/22/2017 | | PASS |
Laura Hunter
|
|
|
|
Application received | | | 2/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 17 2017 5:10PM
|