BLD-Final | 5/1/2017 | 5/1/2017 | 5/1/2017 | P | PASS |
Jim Storey
|
|
|
Dan Phone #: ###-####
|
DOC - Permit Finaled | 5/1/2017 | 5/1/2017 | 5/1/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Jim Storey
|
|
|
would like call ahead; Jerry Phone #: ###-####
|
Routing Walk-In (BLD) | 3/21/2017 | 3/21/2017 | 3/21/2017 | A | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2017 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 3/21/2017 | | 3/21/2017 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/21/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/21/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 2/28/2017 | 2/28/2017 | 2/28/2017 | A | DONE |
Colleen T Carroll
|
|
|
same plan as approved by BDM.
|
Routing Walk-In (BLD) | 2/28/2017 | 2/28/2017 | 2/28/2017 | A | FAIL |
Brian McGowan
|
|
|
Engineering is required for a post and beam construction. Did not want to provide engineering
|
Plan resubmittals received | | | 2/28/2017 | | DONE |
|
|
|
changes were done to the original plan
|
Routing Walk-In (Zoning) | 2/21/2017 | 2/21/2017 | 2/21/2017 | A | PASS |
Brent Moore
|
|
|
|
Routing Walk-In (BLD) | 2/21/2017 | 2/21/2017 | 2/21/2017 | A | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 2/21/2017 | | FAIL |
Brian McGowan
|
|
|
Trying to attach patio cover to the manufactured home.
|
Routing - PLAN CHECK | 2/21/2017 | | 2/21/2017 | | FAIL |
Brian McGowan
|
|
|
Trying to attach a patio cover to a manufactured home
|
Application received | | 2/21/2017 | | | |
|
|
|
|