BLD-Energy code compliance | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Mike Jordan
|
|
|
Steven Phone #: ###-####
|
BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Mike Jordan
|
|
|
Stephen Phone #: ###-####
|
Routing - MECHANICAL | 4/17/2019 | | 4/17/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Framing/Rough-in | 4/26/2018 | 4/27/2018 | 4/27/2018 | A | PART |
Mike Jordan
|
|
|
Steve Phone #: ###-####. Walk through only. Needs to complete MEP, get rough in inspections and complete airseal. Will call for another framing inspection.
|
BLD-Aging Inspection | 10/12/2017 | 10/12/2017 | 10/13/2017 | | PASS |
Mike Jordan
|
|
|
|
BLD-Foundation | 5/25/2017 | 5/30/2017 | 5/30/2017 | A | PART |
Mike Jordan
|
|
|
Steve Phone #: ###-####. Spoke with Steve regarding no rebar across front of gagrage. project has been engineered. steve will contact engineer. Will drill and epoxy verts at 16" oc. across garage front and install two horizontal rebar to verts and extend around corners.
|
BLD-Footing | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Brandon Shaw
|
|
|
Steve Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/10/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 3/8/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 3/8/2017 | 3/8/2017 | 3/8/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | | | 3/8/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 3/8/2017 | | 3/8/2017 | | PASS |
Troy James
|
|
|
|
Case Summary (BLD) | | | 3/8/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/8/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/8/2017 | | DONE |
|
|
|
Need GC Form and RP
|
Telephone call | | | 3/8/2017 | | DONE |
|
|
|
Spoke with Ken informing him that this permit is ready and the fee amount due for issuance. Also that we needed to have the homeonwer fill out the GC Form and know if they are going to act as the RP or not
|
Plan resubmittals received | | | 3/8/2017 | | DONE |
|
|
|
resubmittals turned in for manual J
|
Routing Walk-In (Zoning) | 2/21/2017 | 2/21/2017 | 2/23/2017 | A | PASS |
Susan Riggs
|
|
|
This is not approved as an ADU.
|
Routing Walk-In (Zoning) | 2/21/2017 | 2/21/2017 | 2/21/2017 | A | DONE |
Brent Moore
|
|
|
|
1st review completed | | | 2/21/2017 | | FAIL |
Brian McGowan
|
|
|
Need Manual J. Took in plans to begin structural review.
|
Routing - PLAN CHECK | 2/21/2017 | | 2/21/2017 | | FAIL |
Brian McGowan
|
|
|
Need Manual J. Took in plans to begin structural review.
|
Application received | | 2/21/2017 | | | |
|
|
|
|