BLD-Final | 12/26/2017 | 12/26/2017 | 12/26/2017 | P | PASS |
Tony Young
|
|
|
call for access- Jim Phone #: ###-####
|
DOC - Permit Finaled | 12/26/2017 | 12/26/2017 | 12/26/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Footing | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | CANC |
Tony Young
|
|
|
Mersadez-pour time 2:00 Phone #: ###-####,, wrong permit called in
|
BLD-Wall Bracing | 8/30/2017 | 8/31/2017 | 8/31/2017 | A | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
BLD-Energy code compliance | 8/30/2017 | 8/30/2017 | 8/30/2017 | P | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 8/30/2017 | 8/30/2017 | 8/30/2017 | P | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 8/25/2017 | 8/28/2017 | 8/28/2017 | A | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | FAIL |
Tony Young
|
|
|
Jim Phone #: ###-####,, c/n posted
|
BLD-Foundation | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | PART |
Jim Sly
|
|
|
Bill Phone #: ###-#### Walls only....OK No pads at rear of house.
|
BLD-Footing | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Footing | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PEND |
Jim Sly
|
|
|
call at 8am-Bill Phone #: ###-#### Met with Jim......at sections where they could not save original Footing and Foundation.....I allowed contractor to pour Min. 8x16 footing with 2 # 4 rebar. and Foundation wall with 2- #4 rebar.
|
(F) Reprint permit | | | 6/13/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/13/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/9/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 4/13/2017 | 4/13/2017 | 6/9/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete - remodel Tall wall engineering required, truss layout verified
|
Routing Walk-In (BLD) | 3/29/2017 | 3/29/2017 | 6/9/2017 | P | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 6/9/2017 | | DONE |
|
|
|
Spoke with Heather informing her that this permit is ready to be picked up and the fee amount due
|
Routing - PLAN CHECK | 6/9/2017 | | 6/9/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/9/2017 | | DONE |
|
|
|
Met
|
Plan resubmittals received | | | 6/8/2017 | | DONE |
|
|
|
resubmittals received 2 sets of sheets 1.14 and 3.14-took to Brian McGowan
|
Routing - PLAN CHECK | 3/29/2017 | | 4/13/2017 | | FAIL |
Brian McGowan
|
|
|
Tall wall engineering required, truss layout verified
|
1st review completed | | | 4/13/2017 | | FAIL |
Brian McGowan
|
|
|
Tall wall engineering required, truss layout verified
|
Routing - MECHANICAL | 3/29/2017 | | 3/30/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing Walk-In (Zoning) | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | PASS |
Ted Vanegas
|
|
|
Plan modification; Going to adding 2812sqft for a second leve and 1033sqft for garage
|
Routing Walk-In (BLD) | 2/21/2017 | 2/21/2017 | 2/21/2017 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 2/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/21/2017 | | 2/21/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 2/21/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 2/21/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/21/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/21/2017 | | DONE |
|
|
|
|
Application received | | 2/21/2017 | | | |
|
|
|
|