BLD-Final | 2/2/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Tony Young
|
|
|
CHRIS - TONY DID PRELIMINARY Phone #: ###-####
|
DOC - Permit Finaled | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 2/6/2018 | 2/6/2018 | 2/6/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 12/27/2017 | 12/27/2017 | 12/29/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/26/2017 | 12/26/2017 | 12/29/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PART |
Tony Young
|
|
|
Please call ahead for access, 1hr - Chris Phone #: ###-####,, ?s on guardrails
|
BLD-Other | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Tony Young
|
|
|
Chris-fire stopping Phone #: ###-####
|
BLD-Wall cover | 8/10/2017 | 8/14/2017 | 8/14/2017 | A | FAIL |
Dave Hannah
|
|
|
Chris Phone #: ###-####,, chase fire blocks not done
|
BLD-Energy code compliance | 8/9/2017 | 8/10/2017 | 8/10/2017 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, frame corrections complete,, need fire blocks in the chase of fireplace,, need full approval on the sprinkler system
|
BLD-Energy code compliance | 8/8/2017 | 8/9/2017 | 8/9/2017 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, insulation ok,, need frame corrections complete and sprinkler full approval
|
BLD-Energy code compliance | 8/8/2017 | 8/8/2017 | 8/9/2017 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, seal pack ok
|
BLD-Energy code compliance | 8/8/2017 | 8/8/2017 | 8/8/2017 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, base layer on roof deck ok,, need sprinkler pass
|
BLD-Framing/Rough-in | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, some minor corrections,, ok to start base layer
|
BLD-Framing/Rough-in | 8/7/2017 | 8/7/2017 | 8/7/2017 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, a couple corrections
|
BLD-Framing/Rough-in | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | PEND |
Tony Young
|
|
|
Chris Phone #: ###-####,, ok to start foam base layer,, needs sprinkler pass
|
BLD-Framing/Rough-in | 8/2/2017 | 8/4/2017 | 8/4/2017 | A | NR |
Tony Young
|
|
|
Chris Phone #: ###-####,, needs fire sprinklers 1st,, conf walk through only
|
BLD-Wall Bracing | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PASS |
Tony Young
|
|
|
Shear // Chris Phone #: ###-####
|
BLD-Wall Bracing | 7/18/2017 | 7/18/2017 | 7/18/2017 | P | PART |
Brandon Shaw
|
|
|
First and Second floor only, no access to Third story
|
BLD-Footing | 5/26/2017 | 5/26/2017 | 5/26/2017 | P | PASS |
Tony Young
|
|
|
Jared-pour time 2 Phone #: ###-####
|
BLD-Foundation | 5/2/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
Dave Hannah
|
|
|
Jarod Phone #: ###-####
|
BLD-Footing | 4/24/2017 | 4/25/2017 | 4/25/2017 | P | PART |
Tony Young
|
|
|
Jared Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 4/10/2017 | 4/10/2017 | 4/10/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
|
Issue PAID IN FULL permit | | | 3/30/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 3/29/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2017 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2017 | | DONE |
|
|
|
called Chris to let know permit is ready and how much is owed
|
Case Summary (BLD) | | | 3/29/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/29/2017 | | 3/29/2017 | | PASS |
Tisha Gallop
|
|
|
received additional info via e-mail from contractor and archtiect. Redlined on plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/29/2017 | | DONE |
|
|
|
All Met
|
Plan assigned to (LEG) Tisha | 2/23/2017 | | 3/29/2017 | | DONE |
Tisha Gallop
|
|
|
1st review 3/15 L2 hillside (plan review report, hillside)
|
Routing - PLAN CHECK | 3/23/2017 | | 3/28/2017 | | FAIL |
Tisha Gallop
|
|
|
e-mailed contractor need more information for roof membrane, spray foam and cable railing
|
Plan resubmittals received | | | 3/23/2017 | | DONE |
|
|
|
resubmittals received 2 sets of sheets a-103, a-104, a-105, a-106, a-301, a-302, a-201, a-202, e-1, e-2, e-3, 1 set of engineering & the 1 form 310-took to Tisha
|
Routing PW Grading-Hillside | 3/21/2017 | | 3/23/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 3/23/2017 | | 3/23/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLAN CHECK | 3/20/2017 | | 3/21/2017 | | FAIL |
Tisha Gallop
|
|
|
revised grading plans only, routed to PW
|
Plan resubmittals received | | | 3/20/2017 | | DONE |
|
|
|
received (3) sets of grading plan resubmittals
|
Routing PW Grading-Hillside | 3/15/2017 | | 3/16/2017 | | FAIL |
Jason C. Taylor
|
|
|
Grading plan needs revised. JCT
|
Routing - PUBLIC WORKS | 3/16/2017 | | 3/16/2017 | | FAIL |
Morgan Webb
|
|
|
SEE JASON TAYLOR
|
Routing - PLAN CHECK | 3/8/2017 | | 3/15/2017 | | FAIL |
Tisha Gallop
|
|
|
|
1st review completed | | | 3/15/2017 | | FAIL |
|
|
|
|
Routing - FIRE | 3/8/2017 | 2/23/2017 | 3/8/2017 | | PASS |
Scott Arellano
|
|
|
Fire Sprinklers are required. Per SUB15-00072 fire comments.
|
Routing - Erosion and Sediment | 3/3/2017 | | 3/8/2017 | | PASS |
Andy J. Long
|
|
|
Need to submit valid RP to issue. ESC plan approved.
|
Routing - MECHANICAL | | | 3/3/2017 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 3/2/2017 | | DONE |
Christina Prado
|
|
|
Received three set of revised Grading Plans, as well as one set revised calculations; Plans stamped and taken to LEG for processing
|
Routing - PLANNING | 2/27/2017 | | 2/28/2017 | | PASS |
Nicolette Womack
|
|
|
Pool noted on Floor plan but no details. Called Chris Shiner 2-28-17 and confirmed no pool is proposed.
|
Routing - PUBLIC WORKS | 2/27/2017 | | 2/27/2017 | | FAIL |
Morgan Webb
|
|
|
SEE JASON TAYLOR FOR FAIL
|
Routing PW Grading-Hillside | 2/23/2017 | | 2/27/2017 | | FAIL |
Jason C. Taylor
|
|
|
See email dated 2/27/2017 for revision requirements. JCT
|
Route to Impact Fee Review | 2/23/2017 | 2/26/2017 | 2/24/2017 | | PASS |
Cindy M. Gould
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing PW Sewer Rating | 2/23/2017 | | 2/23/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/23/2017 | | DONE |
|
|
|
|
Intake Approval | | | 2/23/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/23/2017 | | DONE |
|
|
|
|
Routing - Addressing | 2/23/2017 | | 2/23/2017 | | PASS |
Laura Hunter
|
|
|
|
Application received | | 2/22/2017 | | | |
|
|
|
|