Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-00350
StatusFinaled
Name SUNRISE SIGNATURE HOMES
Site Address 404 W SHERMAN ST
Project NameHanrahan Residence
Customer Number 
ePlanReviewYes
Description
WUI Zone A; Permit for the construction of a new 3639 sq. ft., two story (first story 1684 sq. ft., second story 1955 sq. ft.) single family dwelling with 4 bedrooms, 4 bathrooms, and a 866 sq. ft. attached garage per the approved plans, engineering, ACCA Report, and any notations. R-1C zoning and setbacks per planning.//leg **** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/10/20185/10/20185/10/2018PPASS
DetailsTony Young
Justin Phone #: ###-####
DOC - Permit Finaled5/10/20185/10/20185/10/2018PPASS
DetailsTony Young
c of o issued
PubWorks Occupancy Approval5/10/20185/10/20185/10/2018 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Aging Inspection5/2/20185/2/20185/8/2018 PEND
DetailsTony Young
BLD-Aging Inspection5/3/20185/3/20185/3/2018 PASS
DetailsTony Young
BLD-Energy code compliance12/19/201712/19/201712/19/2017PPASS
DetailsTony Young
Justin Phone #: ###-####
BLD-Framing/Rough-in12/18/201712/18/201712/18/2017PPART
DetailsTony Young
Late as possible // Justin Phone #: ###-####,, ok to insulate,, verify seal package,, need updated truss info on B-2, strap plates as needed,, overlap truss bracing one bay
BLD-Other11/27/201711/28/201711/28/2017APART
DetailsTony Young
Soffits - Justin Phone #: ###-####,, work in progress
BLD-Other11/27/201711/27/201711/27/2017PPART
DetailsTony Young
Soffits - Justin Phone #: ###-####,, work in progress,, doing drywall and soffit at the same time
Plan Modification Accepted  11/22/2017 DONE
new manual j report
Routing - MECHANICAL11/22/2017 11/22/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Aging Inspection11/7/201711/7/201711/8/2017 PASS
DetailsTony Young
BLD-Wall Bracing11/6/201711/7/201711/7/2017APASS
DetailsJim Storey
Justin Phone #: ###-####
BLD-Foundation6/26/20176/26/20176/26/2017PPART
DetailsTony Young
Sergio-wall Phone #: ###-####,, work in progress
BLD-Footing6/1/20176/1/20176/1/2017PPART
DetailsTony Young
Sergio Phone #: ###-####,, work in progress
PubWorks Subgrade Approval6/1/20176/1/20176/1/2017 DONE
DetailsJason C. Taylor
**all footings for structure***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####

BLD-Footing5/25/20175/25/20175/30/2017PCANC
DetailsDave Hannah
Sergio Phone #: ###-####
BLD-Footing5/26/20175/26/20175/30/2017PNR
DetailsTony Young
Sergio Phone #: ###-####
Issue PAID IN FULL permit  4/14/2017 DONE
Inspection Record Card- Bld  4/14/2017 DONE
OVERRIDE  4/10/2017  
Plan assigned to (LEG) Tisha2/28/2017 4/10/2017 DONE
DetailsTisha Gallop
1st review 3/24; 3/17 L2 Hillside
Routing - PLAN CHECK4/4/2017 4/10/2017 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  4/10/2017 DONE
Permit Ready to Issue  4/10/2017 DONE
all requirements met
Plan resubmittals received  4/4/2017 DONE
Routing - PLANNING3/24/2017 3/24/2017 PASS
DetailsJeff Lowe
1st review completed  3/24/2017 FAIL
Routing - PLAN CHECK2/28/2017 3/24/2017 FAIL
DetailsTisha Gallop
Routing PW Grading-Hillside3/23/2017 3/23/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing PW Grading-Hillside3/1/2017 3/9/2017 PASS
DetailsJason C. Taylor
Need signed conditions of approval returned.
Route to Impact Fee Review2/28/20173/3/20173/6/2017 PASS
DetailsTonya Wallace
Initial residential review of all new news permit requested for now.
Routing - FIRE2/28/20172/28/20173/2/2017 PASS
DetailsScott Arellano
Plans were reviewed for FD Access, Hydrant availability and defensible space.
Routing - PLANNING2/28/2017 3/1/2017 FAIL
DetailsJeff Lowe
balcony on northeast corner not permitted to extend into side setback. also, site plan shows steps on east side adjacent to driveway; not shown on elevations. need more information. need step and wall profile for front entry.
Routing - Addressing2/28/2017 3/1/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/28/2017 3/1/2017 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment2/28/2017 3/1/2017 PASS
DetailsAndy J. Long
BMPs: stabilized construction entrance, DI bags, fiber rolls along Sherman street
Routing - MECHANICAL2/28/2017 2/28/2017 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  2/28/2017 DONE
Intake Approval  2/28/2017 PASS
Recd Pcfee & Taken To Pln CK  2/28/2017 DONE
Application received  2/22/2017 DONE
Application submitted via PDS Online on Feb 22 2017 2:23PM