BLD-Final | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Jim Sly
|
|
|
chuck Phone #: ###-####
|
DOC - Permit Finaled | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Jim Sly
|
|
|
Chuck Phone #: ###-#### Frame and Energy pass
|
Plan Modification Accepted | | | 1/9/2018 | | DONE |
|
|
|
new manual j reports
|
Routing - MECHANICAL | 1/9/2018 | | 1/9/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Framing/Rough-in | 12/28/2017 | 12/28/2017 | 12/28/2017 | P | NR |
Jim Sly
|
|
|
Chuck Phone #: ###-####
|
BLD-Framing/Rough-in | 8/10/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Brandon Shaw
|
|
|
Straps ar shear panels
|
BLD-Foundation | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | PASS |
Jim Sly
|
|
|
Chuck-wall Phone #: ###-####
|
BLD-Foundation | 6/14/2017 | 6/16/2017 | 6/16/2017 | A | PASS |
Jim Sly
|
|
|
Wall // Chuck Phone #: ###-####
|
BLD-Footing | 6/6/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Dave Hannah
|
|
|
Chuck Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/25/2017 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 4/25/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 2/27/2017 | 2/27/2017 | 4/25/2017 | | DONE |
Brian McGowan
|
|
|
Due 3-14 Level 2 (w/ 17-00356) - Fail -Townhomes not shown as structurally independant. Several beams need verified. -FAILED - Did not address the beams or the structurally independent issues
|
Routing - PLAN CHECK | 4/25/2017 | | 4/25/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/25/2017 | | DONE |
|
|
|
need RP
|
Routing - PLAN CHECK | 4/7/2017 | | 4/7/2017 | | FAIL |
Brian McGowan
|
|
|
Did not provide the requested corrections
|
1st review completed | | | 3/14/2017 | | FAIL |
Brian McGowan
|
|
|
Townhomes not shown as structurally independant. Several beams need verified.
|
Routing - PLAN CHECK | 2/23/2017 | | 3/14/2017 | | FAIL |
Brian McGowan
|
|
|
Townhomes not shown as structurally independant. Several beams need verified.
|
Routing - MECHANICAL | 3/1/2017 | | 3/1/2017 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 2/23/2017 | | 2/27/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Route to Impact Fee Review | 2/23/2017 | 2/26/2017 | 2/24/2017 | | PASS |
Cindy M. Gould
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - MECHANICAL | 2/23/2017 | | 2/24/2017 | | FAIL |
Troy James
|
|
|
emailed corrections to idaho hvac
|
Routing - PLANNING | 2/23/2017 | | 2/23/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 2/23/2017 | | 2/23/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/23/2017 | | 2/23/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/23/2017 | | DONE |
|
|
|
|
Intake Approval | | | 2/23/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/23/2017 | | DONE |
|
|
|
|
Application received | | | 2/22/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 22 2017 2:41PM
|