BLD-Final | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PASS |
Jim Sly
|
|
|
Doyle Phone #: ###-####
|
DOC - Permit Finaled | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | FAIL |
Mike Jordan
|
|
|
Doyle Phone #: ###-####. Provide 20 min. door at garage to house and self closing. everything else ok.
|
BLD-Aging Inspection | 10/6/2017 | 10/6/2017 | 10/6/2017 | | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
Brandon Shaw
|
|
|
Doyle-wall Phone #: ###-#### Still need engineering for A2 truss
|
BLD-Framing/Rough-in | 5/22/2017 | 5/22/2017 | 5/22/2017 | P | FAIL |
Mike Jordan
|
|
|
Doyle Phone #: ###-####. Foam missed penetrations in top plate. Stalple exterior OSB were onot attched north wall. Complete lateral bracing on A3 trusses. Truss engineering shows continous bearing on A2 truss. Provide the bearing or provide fix from the truss engineer. Correction notice posted. Ok to insulate.
|
BLD-Foundation | 4/6/2017 | 4/6/2017 | 4/6/2017 | P | PART |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|
BLD-Footing | 3/29/2017 | 3/30/2017 | 3/30/2017 | P | NR |
Mike Jordan
|
|
|
Doyle Phone #: ###-####. Excavation is complete. No forms constructed at this time, probably due to weather. Will need to reschedule inspection.
|
OVERRIDE | | | 3/2/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 3/1/2017 | 3/1/2017 | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 3/2/2017 | | DONE |
|
|
|
called Doyle to let know permit is ready and how much is owed
|
Issue PAID IN FULL permit | | | 3/2/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/24/2017 | | 3/2/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/2/2017 | | DONE |
|
|
|
|
1st review completed | | | 3/1/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 2/23/2017 | | 2/24/2017 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (Zoning) | 2/23/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Jeff Lowe
|
|
|
no adu or duplex approved with this permit
|
Application received | | 2/23/2017 | | | |
|
|
|
|