First Notice | | 2/8/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12
|
DOC - Permit Finaled | | | 11/1/2018 | | DONE |
|
|
|
Per BLD-Final Passed inspection (required signatures say no for c of o)
|
BLD-Final | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
Charles Phone #: ###-####
|
Zoning Approval | 10/3/2018 | 10/3/2018 | 10/3/2018 | | PASS |
Katelyn Menuge
|
|
|
|
PubWorks Occupancy Approval | 8/31/2018 | 8/31/2018 | 8/31/2018 | | DONE |
Tiffany Lowery
|
|
|
Received engineer letter and release letter from Owner of Treasure Valley Hospital
|
BLD-Framing/Rough-in | 4/27/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Interior steel stud framed walls at locker rooms.
|
BLD-Framing/Rough-in | 12/21/2017 | 12/21/2017 | 12/21/2017 | A | PASS |
Mike Jordan
|
|
|
Interior steel stud framed walls and soffits, remainder of addiotion ok.
|
OVERRIDE | | | 12/19/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 9/27/2017 | 9/27/2017 | 12/19/2017 | | PASS |
Carl Westfall
|
|
|
x deferred submittal - Treasure Valley
|
CHANGE STATUS TO (ISS) | | | 12/19/2017 | | DONE |
|
|
|
emailed new b.permit to have them sign
|
(F) Reprint permit | | | 12/19/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/13/2017 | | 12/19/2017 | | PASS |
Carl Westfall
|
|
|
Jan Welch (Chris Merrill) Stapley
|
Plan Reviewer's activity | | | 12/19/2017 | | PASS |
|
|
|
Deferred submittal approved
|
Permit Ready to Issue | | | 12/19/2017 | | DONE |
|
|
|
please do not re issue-as per the the plan mod fee sheet, no fees are due
|
Routing - PLAN CHECK | 12/12/2017 | | 12/13/2017 | | PASS |
Carl Westfall
|
|
|
Pending Structural
|
Plan resubmittals received | | | 12/12/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 11/14/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/17/2017 | | 11/14/2017 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Chris Merrill) Stapley
We had hoped that the remaining issues could be resolved through Emails but it has not worked out that way. The workflow was sent back to the applicant.
|
Plan Reviewer's activity | | | 11/13/2017 | | DONE |
|
|
|
Uploaded drawings forwarded by Jan Welch, Consultant Structual Engineer.
|
Plan resubmittals received | | | 10/17/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/17/2017 | | 10/17/2017 | | PASS |
Carl Westfall
|
|
|
Pending structural
|
Plan resubmittals requested | | | 10/4/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/29/2017 | | 10/4/2017 | | FAIL |
Carl Westfall
|
|
|
More information required. Since the applicant has not communicated his intentions, the workflow was routed back to him.
|
Plan Modification Accepted | | | 9/29/2017 | | DONE |
|
|
|
Deferred submittal workflow received
|
Plan Modification Accepted | | | 9/27/2017 | | DONE |
|
|
|
Deferred submittal
|
BLD-Framing/Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Interior steel stud framed walls for laundry room.
|
BLD-Foundation | 8/18/2017 | 8/21/2017 | 8/21/2017 | A | PART |
Mike Jordan
|
|
|
Jeff-rebar Phone #: ###-####. Footings and column pad footings at gridlines N7 from grids NB to NA. Grid NA from N4 to N7. Grid NA from N2 to N3. Noted some clearance issues. Will have special inspection. Special inspector to verify clearance issues are resolved.
|
BLD-Foundation | 8/10/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Mike Jordan
|
|
|
Rebar// Charles Phone #: ###-####. Footings and column pad footings on grid N6 from grids NG to NB.
|
BLD-Concrete | 8/7/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Mike Jordan
|
|
|
rebar- Jeff Phone #: ###-####. Stemwalls on grid NM from grids N2-N4. Interior column pad footings on grid N4 at grids NG, NF and NC.
|
BLD-Foundation | 8/1/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Mike Jordan
|
|
|
Interior column moment frame footings on grids N2 and N3 are now per detail 1/S5.10. Footings and column pad footings on gridline NM from N1 to N4, and N4 from NM to NH and NH from N4 to N7 are ok to place. Will also have specail inspection.
|
Fees Due Hold | 8/2/2017 | | 8/2/2017 | | DONE |
|
|
|
|
BLD-Foundation | 8/1/2017 | 8/1/2017 | 8/1/2017 | P | CANC |
Mike Jordan
|
|
|
Rebar inspection. Moved to pm on 8-2-17.
|
Fees Due Hold | 7/28/2017 | | 8/1/2017 | | DONE |
Rita DeYoung
|
|
|
|
Fees Due Hold | 7/26/2017 | | 7/27/2017 | | DONE |
Rita DeYoung
|
|
|
|
Fees Due Hold | 7/22/2017 | | 7/25/2017 | | DONE |
Rita DeYoung
|
|
|
|
Print Statement | | | 7/25/2017 | | DONE |
|
|
|
|
Print Statement | | | 7/25/2017 | | DONE |
|
|
|
|
BLD-Footing | 7/21/2017 | 7/24/2017 | 7/24/2017 | A | PART |
Mike Jordan
|
|
|
F6 type interior column pad footings ok to place. F7T and F8T interior column pad footings missing 33 ties and additional #4 next to anchor bolts. Noted all footings with T designation are moment frmae footings and require the additional rebar per detail 1 in S5-10. Verified with engineer of record. ok to place the F6 footings only.
|
BLD-Footing | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | CANC |
Mike Jordan
|
|
|
|
Meeting | | | 7/21/2017 | | DONE |
|
|
|
as per Ron Hill-take hold off so footing can be done-customrs will be in to pay the eng fee assessed
|
Fees Due Hold | 7/6/2017 | | 7/21/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/21/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/20/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 3/6/2017 | 3/6/2017 | 6/20/2017 | | PASS |
Carl Westfall
|
|
|
(4th done) (Mar 24 - 15 days) (Apr 14 - 30 days) (40 sheets) Treasure Valley Hospital
|
Routing - PLAN CHECK | 6/12/2017 | | 6/20/2017 | | PASS |
Carl Westfall
|
|
|
Pending approval by Structural
|
Plan resubmittals requested | | | 6/20/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/20/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/20/2017 | | 6/20/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 6/20/2017 | | 6/20/2017 | | PASS |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
1st review completed | | | 6/20/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/20/2017 | | DONE |
|
|
|
Need GC Form, Revised Cert of Value and RP
|
Routing Off Site - STRUCTURAL | 6/13/2017 | | 6/19/2017 | | FAIL |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
Plan resubmittals received | | | 6/12/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/6/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/26/2017 | | 6/6/2017 | | FAIL |
Carl Westfall
|
|
|
(Remember to revise the plan review report and to upload it) Workflow received on a Friday. Did not get it routed. Saturday, Sunday, and Memorial Day followed. Routed on Tuesday May 30. Approval pending structural approval.
|
Routing Off Site - STRUCTURAL | 5/30/2017 | | 6/6/2017 | | FAIL |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
Routing PW Sewer Design | 5/30/2017 | | 6/5/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 5/30/2017 | | 5/31/2017 | | PASS |
Brian Murphy
|
|
|
Transfer approval stamp to latest version
|
Plan resubmittals received | | | 5/26/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/4/2017 | | 5/19/2017 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Chris Merrill) Stapley
|
Plan resubmittals requested | | | 5/19/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/3/2017 | | 5/19/2017 | | FAIL |
Carl Westfall
|
|
|
not approved by structural
|
Routing PW Sewer Design | 5/4/2017 | | 5/15/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Add Note: Contact Boise Public Works 48 hours prior to construction of sewer service tap to obtain tap permit. Install new sewer service as a "Type D" service according to SD-511 of the ISPWC and maintain slope of 2% in the public sewer easement.
Also show the proposed sewer easement revision on the utility plan.
|
Routing - FIRE | 5/4/2017 | | 5/8/2017 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing PW Drainage | 5/4/2017 | | 5/8/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 5/4/2017 | | 5/8/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Plan resubmittals received | | | 5/3/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 4/13/2017 | 4/16/2017 | 4/13/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/13/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/13/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/6/2017 | | 4/13/2017 | | FAIL |
Carl Westfall
|
|
|
1st review done
|
Routing PW Solid Waste | 3/7/2017 | | 3/24/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing PW Environmental | 3/7/2017 | | 3/21/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing Off Site - STRUCTURAL | 3/6/2017 | | 3/20/2017 | | FAIL |
Carl Westfall
|
|
|
Jan Welch - Stapley
|
Routing PW Drainage | 3/7/2017 | | 3/15/2017 | | FAIL |
Brian Murphy
|
|
|
NEED 9 IN/HR PERC RATE,18 INCHS OF C-33 SANDNEED ORIGINAL APDX J
|
Routing - FIRE | 3/6/2017 | 3/6/2017 | 3/13/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing PW Street Lights | 3/7/2017 | | 3/9/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 3/7/2017 | | 3/8/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Foundations are not allowed inside of the public sewer easement. Contact Boise Public Works 48 hours prior to construction of sewer service tap to obtain tap permit. Install new sewer service as a "Type D" service according to SD-511 of the ISPWC and maintain slope of 2% in the public sewer easement.
|
Routing - PUBLIC WORKS | 3/6/2017 | | 3/7/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 3/6/2017 | | 3/7/2017 | | PASS |
Andy J. Long
|
|
|
Site preparation inspection required before construction begins Call ###-####. RP TBD. BMPs: Construction entrance, perimeter silt fence, filter sock, concrete washout.The plan designer is out of state and not a valid City of Boise PD. Okay, but PD should get certification if continuing to design ESC plans in Boise.
|
Routing - Design Review | 3/6/2017 | | 3/7/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH16-00514.
|
Routing - PLUMBING | 3/6/2017 | | 3/7/2017 | | FAIL |
Bill VanDegrift
|
|
|
Page C3
1) existing piping under the addition must be of approved material
Page C6
1) Demo plans syhow water service as demo'd. This plan seems to be continued service as well as the fire service connection.
2) All existing plumbing service piping under the building must be of approved material.
Page P1.1
1) combination waste and vent systems are not approved for use in commercial kitchens.
2) provide a 3" vent on the discharge side of the grease interceptor.
3) show location of new water service in the building. Potable water service may not connect to the fire service.
4) size all waste and vent piping.
|
Routing - PLANNING | 3/6/2017 | | 3/7/2017 | | PASS |
Celine Acord
|
|
|
Approved - redline to require 7 ADA parking spaces per Condition #2 of CUP16-00094
|
Routing - PLANNING Land Div | 3/6/2017 | | 3/7/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 3/6/2017 | | 3/6/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - MECHANICAL | 3/6/2017 | | 3/6/2017 | | PASS |
Troy James
|
|
|
no mechanical design. no review
|
Intake Approval | | | 3/6/2017 | | PASS |
|
|
|
|
Intake Approval | | | 2/28/2017 | | FAIL |
|
|
|
|
Application received | | | 2/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 23 2017 10:12AM
|