Second Notice | | 8/21/2017 | 8/22/2017 | | DONE |
|
|
|
This permit finaled on the web by Dave DeChambeau
|
First Notice | | 7/23/2017 | 8/11/2017 | | DONE |
|
|
|
mailed
|
BLD-Final | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Dave Hannah
|
|
|
Dave Phone #: ###-####
|
Permanent Occupancy | | | 7/13/2017 | | DONE |
|
|
|
|
BLD-Final | 7/6/2017 | 7/7/2017 | 7/7/2017 | P | PART |
Dave Hannah
|
|
|
Dave Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 7/6/2017 | 7/7/2017 | 7/7/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Conference | 6/26/2017 | 6/27/2017 | 6/27/2017 | A | PASS |
Dave Hannah
|
|
|
Dave Phone #: ###-#### no roof rafts were cut so no need to sister all that we need is a letter from struc engineer oking roof loads
|
Issue PAID IN FULL permit | | | 5/12/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/12/2017 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/6/2017 | 3/6/2017 | 5/9/2017 | | PASS |
Carl Westfall
|
|
|
(3rd done) (Mar 24 - 15 days) (8 sheets) SUN RAY CAFE
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/9/2017 | | DONE |
|
|
|
Need revised COV & GC form
|
Routing - MECHANICAL | 3/4/2017 | | 5/8/2017 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 5/4/2017 | | 5/4/2017 | | PASS |
Sarah Schafer
|
|
|
No roof top screen wall
|
Routing - PLUMBING | 5/4/2017 | | 5/4/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and red line notes.
|
Routing - PLAN CHECK | 5/3/2017 | | 5/4/2017 | | PASS |
Carl Westfall
|
|
|
3rd resubmittal review approved
|
Routing - FIRE | 5/4/2017 | | 5/4/2017 | | PASS |
Katie Marron
|
|
|
No changes to previous approved review.
|
Plan resubmittals received | | | 5/3/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/19/2017 | | DONE |
|
|
|
Please see the plan review report for items that need to be resolved.
|
Plan resubmittals received | | | 4/18/2017 | | DONE |
|
|
|
Nothing has changed. The drawings were not revised.
|
Routing - PLAN CHECK | 4/17/2017 | | 4/18/2017 | | FAIL |
Carl Westfall
|
|
|
Changes have been made to the drawings that require revised mechanical drawings. The 2nd review plan intake failed and was sent back to the applicant for correction.
|
Plan resubmittals requested | | | 4/18/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/17/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/24/2017 | 3/27/2017 | 3/24/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 3/6/2017 | | 3/24/2017 | | FAIL |
Carl Westfall
|
|
|
|
1st review completed | | | 3/24/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 3/24/2017 | | DONE |
|
|
|
|
Routing - FIRE | 3/6/2017 | 3/6/2017 | 3/8/2017 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Design Review | 3/6/2017 | | 3/8/2017 | | PASS |
Sarah Schafer
|
|
|
Approved through building permit. 5-foot mechanical screen is appropriate.
|
Routing PW Environmental | 3/6/2017 | | 3/7/2017 | | PASS |
Rick Christenson
|
|
|
Please see Plumbing comments
|
Routing PW Sewer Rating | 3/6/2017 | | 3/7/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 3/6/2017 | | 3/7/2017 | | FAIL |
Daryl Spivey
|
|
|
Tie in other grease fixtures in kitchen area to new grease waste line.
floor sink for dishwasher to go to grease waste also.
|
Routing - Addressing | 3/6/2017 | | 3/6/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/6/2017 | | 3/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 3/6/2017 | | 3/6/2017 | | PASS |
Melissa Jannusch
|
|
|
|
Routing - MECHANICAL | 3/6/2017 | | 3/6/2017 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 3/6/2017 | | PASS |
David Ferguson
|
|
|
|
Intake Approval | | | 3/1/2017 | | FAIL |
David Ferguson
|
|
|
Follow naming convention, provide ESC plan or waiver letter, add dimensions to sheet A2.0
|
Intake Approval | | | 2/27/2017 | | FAIL |
David Ferguson
|
|
|
Residential checklist was uploaded. Need #520 checklist to match the application
The Mechanical and Electrical plans don't have proper naming convention
#304 form loaded upside down
Electrical plan sheet loaded vertically not horizontally
All plan sheets need to be stamped, signed and dated
|
Application received | | | 2/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 23 2017 10:29AM
|