StatusFinaled
Name TK CONSTRUCTION
Site Address 600 N STEELHEAD WAY Unit: 110
Project NameEmerald Business Flex Space
Customer NumberBLD17-00725 INCLUDED
ePlanReviewYes
Description
(EMERALD BUSINESS FLEX SPACE – SUITE 110 – NORTHEAST CORNER) (DRH16-00538) The fire sprinkler system is used for building area increase and for fire area. To create 4,925 square foot office (1,276 square feet) and storage (3,649 square feet) tenant space within an existing 18,534 square foot building. Demolition work includes removing interior nonbearing walls and removing the existing suspended ceiling grid in its entirety. Work is to include 2 single user toilet rooms accessible to the disabled, interior nonbearing walls, an exterior overhead door, a concrete driveway to serve the new overhead door, interior doors, and finishes. Structural work includes new jamb studs at each side of the new overhead door and bracing the existing beam and new jamb studs to the roof structure to resist out-of-plane lateral loads. The existing gravity load resisting system and the existing lateral load resisting system is required to be maintained without any reduction in capacity. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This is a shell only permit. A separate permit is required to establish a Certificate of Occupancy. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice9/26/20179/26/201710/2/2017 DONE
DetailsMike Jordan
This permit finaled on the web by Todd Kurns
BLD-Final9/26/20179/26/20179/26/2017APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Kurns
DOC - Permit Finaled9/26/20179/26/20179/26/2017PPASS
DetailsMike Jordan
Zoning Approval9/26/20179/26/20179/26/2017 PASS
DetailsSarah Schafer
FIRE-Final Inspection9/7/20179/7/20179/7/2017APASS
DetailsTroy Cobbley
life safety passed. Suite number to be installed prior to a building inspection
BLD-Framing/Rough-in7/25/20177/25/20177/25/2017PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Kurns. Framing for new overhead door ok.
BLD-Framing/Rough-in6/13/20176/13/20176/13/2017APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Todd Kurns
Issue PAID IN FULL permit  5/5/2017  
Inspection Record Card- Bld  5/5/2017 DONE
OVERRIDE  4/17/2017  
Route to Impact Fee Review4/15/20174/18/20174/17/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
Permit Ready to Issue  4/17/2017 DONE
DetailsChristina Prado
***Still need RP everything else has been Met***Need GC form & revised certificate of value for issuance

DO NOT ISSUE WITHOUT BLD17-00725
Plan assigned to (CJW)3/21/20173/21/20174/14/2017 PASS
DetailsCarl Westfall
** (Apr 10 - 15 days) (9 sheets) Emerald Business - Flex Space
Routing - PLAN CHECK3/21/2017 4/14/2017 PASS
DetailsCarl Westfall
Review completed
1st review completed  4/14/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/14/2017 DONE
Routing Off Site - STRUCTURAL3/21/2017 4/7/2017 PASS
DetailsCarl Westfall
Jordan Terry - KPFF
Routing - Design Review3/21/2017 3/24/2017 PASS
DetailsSarah Schafer
Approved per DRH16-00538
Routing - FIRE3/21/20173/21/20173/22/2017 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Erosion and Sediment3/21/2017 3/22/2017 PASS
DetailsAndy J. Long
ESC plan waiver approved for commercial tenant improvment. Need to provide designated RP upon contract reward/permit issuance
Routing - Addressing3/21/2017 3/22/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/21/2017 3/21/2017 PASS
DetailsRachael Beierle
Routing PW Environmental3/21/2017 3/21/2017 PASS
DetailsRick Christenson
MINOR INDUSTRIAL
Routing - MECHANICAL3/21/2017 3/21/2017 PASS
DetailsTroy James
Intake Approval  3/21/2017 PASS
DetailsAdele J Schaffeld-Griffin
Javier approved Pre Screen
Fees verified paid
Intake Approval  3/20/2017 FAIL
DetailsDavid Ferguson
Pre-screen #2: Need (2) 520 Major Tenant Improvement Applications (in addition to checklists) - square footage/suite # for each space; Need COMcheck energy compliance
Intake Approval  2/27/2017 FAIL
DetailsDavid Ferguson
Major TI - Change of use
2nd application for new space
COMcheck energy compliance
Mechanical drawings stamped by mechanical engineer (per our Mechanical Plans Examiner)
Application received  2/23/2017 DONE
Application submitted via PDS Online on Feb 23 2017 12:00PM