BLD-Final | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | CANC |
Brandon Shaw
|
|
|
Kelly-call Kelly for questions Phone #: ###-####
|
DOC - Permit Finaled | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 10/9/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Brandon Shaw
|
|
|
Would like to meet onsite, please call ahead - Kelly Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/7/2017 | | DONE |
|
|
|
|
Telephone call | | | 3/3/2017 | | DONE |
|
|
|
called Kelly to let know permit is ready and how much is owed-left message on his phone
|
Routing Walk-In (BLD) | 2/23/2017 | 2/23/2017 | 3/2/2017 | P | DONE |
Brian McGowan
|
|
|
|
Additional plans submitted | | | 3/2/2017 | | DONE |
|
|
|
Three sheets of engineering taken to Brian Mc
|
Routing - PLAN CHECK | 3/2/2017 | | 3/2/2017 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/2/2017 | | DONE |
|
|
|
MET
|
1st review completed | | | 2/28/2017 | | FAIL |
Brian McGowan
|
|
|
Need to verify construction of the carport details
|
Routing - PLAN CHECK | 2/28/2017 | | 2/28/2017 | | FAIL |
Brian McGowan
|
|
|
Need to verify construction of the carport details
|
Routing Walk-In (Zoning) | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | DONE |
Sue Cummings
|
|
|
|
Application received | | 2/23/2017 | | | |
|
|
|
|