Permit Information
Permit NumberBLD17-00367
StatusFinaled
Name MARSH CREEK LLC
Site Address 755 W FRONT ST
Project NameBOI Colliers Building Antenna
Customer Number 
ePlanReviewYes
Description
(VERIZON WIRELESS ANTENNA) (COLLIERS BUILDING) Permit for Verizon Wireless is to install a non-penetrating antenna mount with (1) antenna and outdoor radio equipment on the roof of an existing building per engineered plans and calculations. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice1/22/20181/22/20182/16/2018 DONE
DetailsDave Hannah
This permit finaled on the web by Kim Anderson
BLD-Final1/22/20181/22/20181/22/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kaleb Checketts
DOC - Permit Finaled1/22/20181/22/20181/22/2018PPASS
DetailsDave Hannah
BLD-Final12/15/201712/18/201712/18/2017AFAIL
DetailsDave Hannah
Requesting 11/11:30, please call for access - Ryan Phone #: ###-#### they havea pull box in 1hr rated stair tower
Issue PAID IN FULL permit  8/25/2017 DONE
Plan assigned to (AJS)8/11/20178/11/20178/17/2017 PASS
DetailsAdele J Schaffeld-Griffin
8/18 L2 BOI Century Link Arena ePlan
1st review completed  8/17/2017 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  8/17/2017 DONE
Permit Ready to Issue  8/17/2017 DONE
need
rev cert of val- met
Met GC
Routing - PLAN CHECK8/7/2017 8/17/2017 PASS
DetailsAdele J Schaffeld-Griffin
Plan assigned to (JG)8/7/20178/7/20178/11/2017 DEFR
DetailsJavier Guzman
8/18 L2 BOI Century Link Arena ePlan
Routing - PLANNING8/7/2017 8/7/2017 PASS
DetailsCeline Acord
per CAA16-00165
Routing - Design Review8/7/2017 8/7/2017 PASS
DetailsKatelyn Menuge
DRH16-00373
Intake Approval  8/7/2017 PASS
DetailsJavier Guzman
Plan assigned to (JCB)8/7/2017 8/7/2017 DEFR
DetailsJavier Guzman
L2 BOI Century Link Arena ePlan
Intake Approval  7/21/2017 FAIL
DetailsJulie Romig
Need: 1. Completed 518 Submittal Checklist with any additional information as required.
2. Completed Form 304 Registered Design Professional for engineer.
3. Stamp and/or signature on sheet MISC and Survey sheet.
Intake Approval  7/19/2017 FAIL
DetailsJulie Romig
Need:

1. Completed 518 Submittal Checklist with any additional information as required.
2. Completed Form 304 Registered Design Professional for engineer.
3. Stamp and/or signature on sheet MISC and Survey sheet.
4. Rename sheets per City of Boise naming convention - Sheet number and brief description (ex T100_Title). Drawing sheets have been deleted so renamed sheets can be uploaded.
Application received  2/23/2017 DONE
Application submitted via PDS Online on Feb 23 2017 2:50PM