Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-00376
StatusFinaled
Name KNIGHT CONSTRUCTION LLC
Site Address 1304 W ALTURAS ST
Project NameCamel's Crossing - Tavern
Customer Number 
ePlanReviewYes
Description
(CAMEL’S CROSSING – TAVERN) (DRH16-00545) (CUP16-00109) This building does not have a fire sprinkler system. To remodel an existing 1,523 square foot tenant space for a new bar tenant (including the 310 square foot patio the total area is 1,833 square feet). Work is to include a 2-hr fire-resistance-rated fire barrier wall to create separate fire areas, interior nonbearing walls, 2 toilet rooms accessible to the disabled, booths, tables, chairs, a standing rail, a bar, an exterior wood landing and steps at the front entrance, an exterior asphalt landing and ramp at the back entrance, doors, back bar equipment, food preparation equipment, dish washing equipment, and finishes. Cooking operations that create grease or grease laden vapors are not allowed. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/22/201710/24/2017 DONE
This permit finaled on the web by Joseph knight
First Notice 9/28/201710/12/2017 DONE
Mailed 10-13-17
BLD-Final9/17/20179/18/20179/18/2017PPASS
DetailsTony Young
The earlier the better Phone #: ###-#### Inspection requested via web by Joseph knight
FIRE-Final Inspection9/17/20179/18/20179/18/2017APASS
DetailsJim Page
Previously noted items have been addressed, no fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection passed/complete.
Permanent Occupancy  9/18/2017 DONE
FIRE-Final Inspection9/13/20179/14/20179/14/2017AFAIL
DetailsTroy Cobbley
Provide small documents, repair the exit discharge light at the main exit, provide panic hardware on both exit doors, possible occupant load signs, tag on the fire extinguisher
Zoning Approval9/14/20179/14/20179/14/2017 PASS
DetailsTed Vanegas
BLD-Final9/13/20179/13/20179/13/2017PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Joseph knight,, conf only
BLD-Framing/Rough-in6/28/20176/28/20176/28/2017PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Joseph knight
Print Occupancy Form  4/24/2017 DONE
Issue PAID IN FULL permit  4/24/2017 DONE
OVERRIDE  4/21/2017  
Routing - FIRE4/17/20174/17/20174/21/2017 PASS
DetailsScott Arellano
Attached review comments to plans.
Plan assigned to (CJW)3/13/20173/13/20174/21/2017 PASS
DetailsCarl Westfall
(2nd done) (Mar 31 - 15 days) (30 sheets) Camel's Crossing
PLANS/APPL TAKEN TO FRONT DESK  4/21/2017 DONE
Permit Ready to Issue  4/21/2017 DONE
Need GC Form and Revised Cert of Value
Routing - MECHANICAL4/17/2017 4/18/2017 PASS
DetailsTroy James
Routing - PLAN CHECK4/17/2017 4/17/2017 PASS
DetailsCarl Westfall
Drawings approved with redlines
Plan resubmittals received  4/17/2017 DONE
Route to Impact Fee Review4/10/20174/13/20174/11/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
1st review completed  4/10/2017 DONE
Plan resubmittals requested  4/10/2017 DONE
Routing PW Environmental3/13/2017 4/10/2017 PASS
DetailsTerry Alber
Routing - PLAN CHECK3/13/2017 4/8/2017 FAIL
DetailsCarl Westfall
1st review completed
Routing - PLANNING3/13/2017 4/7/2017 PASS
DetailsSusan Riggs
Routing Off Site - C.D.H3/13/2017 3/23/2017 PASS
DetailsCarl Westfall
Joe Antonucci
Routing - FIRE3/13/20173/13/20173/16/2017 PASS
DetailsKatie Marron
Waiting for IBC plan review to gather addional information on basement access.
Routing PW Environmental3/13/2017 3/16/2017 PASS
DetailsRick Christenson
Routing - PLUMBING3/13/2017 3/15/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing3/13/2017 3/13/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/13/2017 3/13/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment3/13/2017 3/13/2017 PASS
DetailsAndy J. Long
ESC plan waiver submitted and approved. Need to designate valid RP
Routing - MECHANICAL3/13/2017 3/13/2017 PASS
DetailsTroy James
Routing - Design Review3/13/2017 3/13/2017 PASS
DetailsTed Vanegas
Plan Reviewer's activity  3/13/2017 PASS
Plan intake review completed
Intake Approval  3/13/2017 PASS
DetailsAdele J Schaffeld-Griffin
Carl W approved pre screen, plan review fees paid varified
Intake Approval  3/6/2017 FAIL
(3-6-17) Please see the circled items in the plan intake checklist. Please resolve each item as noted. CJW
Intake Approval  3/2/2017 FAIL
(3-2-17) Each drawing is required to be uploaded as a separate file. Please follow the ePlanReview standards. Give each file the same name as given to that sheet in the sheet index. This needs to be done before the plan intake review can continue. A plan intake review has not been done yet. Please upload the drawings properly and complete your task. Drawings that did not comply with the ePlanReview standard were deleted. CJW
Application received  2/24/2017 DONE
Application submitted via PDS Online on Feb 24 2017 8:19AM