BLD-Final | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Brandon Shaw
|
|
|
Rolo Phone #: ###-####
|
DOC - Permit Finaled | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Brad McJunkin
|
PubWorks Occupancy Approval | 9/28/2017 | 9/28/2017 | 9/28/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Foundation | 9/11/2017 | 9/12/2017 | 9/11/2017 | A | CANC |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 9/7/2017 | 9/8/2017 | 9/7/2017 | A | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Final | 8/3/2017 | 8/3/2017 | 8/3/2017 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Other | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Brandon Shaw
|
|
|
Fire Soffit.- Rollo Phone #: ###-####
|
BLD-Energy code compliance | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Brandon Shaw
|
|
|
rollo Phone #: ###-####
|
BLD-Framing/Rough-in | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
Brandon Shaw
|
|
|
rollo Phone #: ###-####
|
BLD-Wall Bracing | 6/12/2017 | 6/13/2017 | 6/13/2017 | A | PASS |
Brandon Shaw
|
|
|
rollo Phone #: ###-####
|
BLD-Foundation | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 5/2/2017 | 5/2/2017 | 5/2/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/26/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2017 | | DONE |
|
|
|
|
Telephone call | | | 4/25/2017 | | DONE |
|
|
|
Sent an email to Chelsea informing her that there were fees still due for issuance. Both PRK and SWR have the GC name in the list of people so that they can be seen
|
OVERRIDE | | | 4/18/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 4/5/2017 | 4/5/2017 | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
BHH Priority Review - (Due 4-24)
|
1st review completed | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/18/2017 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 4/5/2017 | | 4/18/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 4/5/2017 | | 4/13/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Route to Impact Fee Review | 4/5/2017 | 4/8/2017 | 4/6/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 4/5/2017 | 4/5/2017 | 4/6/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access, hydrant availability and defensible space.
|
Routing - Erosion and Sediment | 4/5/2017 | | 4/6/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan and site map provided. Valid RP & PD designated. Site preparation inspection required.
|
Plan assigned to (AJS) | 4/5/2017 | 4/5/2017 | 4/5/2017 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/5/2017 | | DONE |
|
|
|
|
Intake Approval | | | 4/5/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/5/2017 | | DONE |
|
|
|
|
Routing - MECHANICAL | 4/5/2017 | | 4/5/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/5/2017 | | 4/5/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 4/5/2017 | | 4/5/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 4/5/2017 | | 4/5/2017 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 2/24/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 24 2017 10:00AM
|