(F) Reprint permit | | | 5/11/2017 | | DONE |
|
|
|
|
BLD-Final | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Brandon Shaw
|
|
|
Victor Phone #: ###-####
|
DOC - Permit Finaled | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 3/31/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Jim Storey
|
|
|
Levi Phone #: ###-####
|
Plan assigned to (LEG) Tisha | 3/15/2017 | | 3/16/2017 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 3/15/2017 | | 3/16/2017 | | PASS |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 3/15/2017 | | 3/16/2017 | | PASS |
Colleen T Carroll
|
|
|
enlarged patio cover from original zoining approval
|
Inspection Record Card- Bld | | | 3/16/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/16/2017 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/16/2017 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/16/2017 | | DONE |
|
|
|
Left a message for Victor informing him this permit is ready and the fee amount due for issuance
|
Permit Ready to Issue | | | 3/16/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/16/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/15/2017 | | DONE |
|
|
|
received (2) sets of plan resubmittals
|
Routing Walk-In (BLD) | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | FAIL |
Tisha Gallop
|
|
|
changed patio cover size to 36'x10'. Engineering required and new site plan for zoning approval.
|
CHANGE STATUS TO (REV) | | | 3/1/2017 | | DONE |
|
|
|
Should have been back to REV not ISS
|
CHANGE STATUS TO (ISS) | | | 3/1/2017 | | DONE |
|
|
|
Reopen per Tisha
|
Plan assigned to (LEG) Tisha | 2/24/2017 | | 2/27/2017 | | CANC |
Tisha Gallop
|
|
|
**walk-in 2/24; wood carport (hillside?)
|
Routing - PLAN CHECK | 2/27/2017 | | 2/27/2017 | | FAIL |
Tisha Gallop
|
|
|
per e-mail from Jason Taylor (see attached) not in hillside. Stand alone structure is under 200 sq.ft., no building permit required. Told him still need to comply with building code and WUI Zone B, class A roof. Metal roof specified on plan. Called Victor at Bright Star, he said possibly job will change to include attached patio cover and will be over 200 sq. ft. Told him need full resubmit if that is the case.
|
1st review completed | | | 2/27/2017 | | FAIL |
|
|
|
|
VOIDED CHANGE STATUS | | | 2/27/2017 | | DONE |
|
|
|
independent structure under 200 sq. ft. see notes in plan check routing.
|
Routing Walk-In (Zoning) | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Andrea Tuning
|
|
|
|
Routing Walk-In (BLD) | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | CANC |
Tisha Gallop
|
|
|
took in as level 2
|
Application received | | 2/24/2017 | | | |
|
|
|
|