BLD-Final | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | PASS |
Tony Young
|
|
|
Call for access // Jaysen Phone #: ###-####
|
DOC - Permit Finaled | 9/22/2017 | 9/22/2017 | 9/22/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 6/14/2017 | 6/14/2017 | 6/14/2017 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jaysen Porter
|
BLD-Framing/Rough-in | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | FAIL |
Tony Young
|
|
|
Please call in route Phone #: ###-#### Inspection requested via web by Jaysen Porter,, walk through only,, do not insulate
|
BLD-Wall Bracing | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Tony Young
|
|
|
Please call in route Phone #: ###-#### Inspection requested via web by Jaysen Porter
|
BLD-Wall Bracing | 6/5/2017 | 6/6/2017 | 6/6/2017 | A | FAIL |
Brandon Shaw
|
|
|
Jaysen Phone #: ###-#### Edge/field nailing and blocking not as per plans, see red paint.
|
BLD-Wall Bracing | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | FAIL |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Jaysen Porter Not ready, check shear nailing at all panels.
|
BLD-Wall Bracing | 5/31/2017 | 5/31/2017 | 5/31/2017 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jaysen Porter
|
BLD-Wall Bracing | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jaysen Porter,, re-do all shear nailing
|
BLD-Footing | 4/3/2017 | 4/4/2017 | 4/4/2017 | A | PASS |
Jim Sly
|
|
|
Should be ready at 10:00 am Phone #: ###-#### Inspection requested via web by Jaysen Porter
|
Issue PAID IN FULL permit | | | 4/3/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 3/31/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 2/27/2017 | 2/27/2017 | 3/31/2017 | | DONE |
Brian McGowan
|
|
|
Due 3-10 ePlan - Fail - Failed Planning and Main Floor wall bracing failed
|
Routing - PLAN CHECK | 3/31/2017 | | 3/31/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/31/2017 | | DONE |
|
|
|
All Met
|
Routing - PLAN CHECK | 3/29/2017 | | 3/29/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering needs to be transferred to drawings
|
Routing - PLANNING | 3/15/2017 | | 3/15/2017 | | PASS |
Sue Cummings
|
|
|
Attached the accessory stuture to main house.
|
Routing - PLAN CHECK | 2/27/2017 | | 3/12/2017 | | FAIL |
Brian McGowan
|
|
|
Planning and Main Floor wall bracing failed
|
1st review completed | | | 3/10/2017 | | FAIL |
Brian McGowan
|
|
|
Wall bracing on first floor is not to prescriptive methods.
Planning failed it as well.
|
Plan Modification Accepted | | | 3/8/2017 | | DONE |
|
|
|
Revised manaul J
|
Routing - MECHANICAL | 3/8/2017 | | 3/8/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 2/27/2017 | 3/2/2017 | 3/6/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - MECHANICAL | 2/27/2017 | | 2/28/2017 | | FAIL |
Troy James
|
|
|
Emailed corrections to Building Energy
|
Routing - PLANNING | 2/27/2017 | | 2/28/2017 | | FAIL |
|
|
|
accessory structure in front of main building not permitted without CUP
|
Routing - Addressing | 2/27/2017 | | 2/27/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/27/2017 | | 2/27/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/27/2017 | | DONE |
|
|
|
|
Intake Approval | | | 2/27/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/27/2017 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 2/27/2017 | | 2/27/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Application received | | | 2/24/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 24 2017 3:21PM
|