Second Notice | | 4/20/2018 | 5/9/2018 | | DONE |
|
|
|
This permit finaled on the web by Jackie Phelps
|
First Notice | | 3/15/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
Permanent Occupancy | | | 3/5/2018 | | DONE |
|
|
|
|
BLD-Final | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-####
|
FIRE-Final Inspection | 2/15/2018 | 2/16/2018 | 2/15/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor is installing blanks on the dead bolts. Address is installed and a smaller refrigerator has been installed.
Josh Phone #: ###-####
|
FIRE-Final Inspection | 2/6/2018 | 2/7/2018 | 2/7/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide all small documents, remove the small fridge under the hood or re-wire the electrical outlet for shutdown, provide address, remove the thumbturn deadbolts (keyed deadbolt at main exit is ok with the sticker) as discussed.
Be in around 9:30 - Josh Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/21/2017 | 6/22/2017 | 6/23/2017 | A | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 6/9/2017 | 6/12/2017 | 6/13/2017 | P | PASS |
Dave Hannah
|
|
|
Late afternoon - Josh Phone #: ###-####
|
BLD-Conference | 5/23/2017 | 5/24/2017 | 5/25/2017 | P | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/2/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/2/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 3/6/2017 | 3/6/2017 | 4/19/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 3/24 L3 4 N. Latah Restaurant ePlan
|
Routing - PLAN CHECK | 4/17/2017 | | 4/19/2017 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2017 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2017 | | DONE |
|
|
|
i removed the hold on this parcel because it was from 2015-here is what it said: No occupancy for BLD12-02181 (Oh Crepes and So Much More) until they provide Bench with plans and we receive proof of payment for Bench Sewer Dist fees; questions call Lee Sperl at Bench Swr Dist ###-####//4/25/13 leg
|
Permit Ready to Issue | | | 4/19/2017 | | DONE |
|
|
|
***all requirements met 4-28-17 /CEV
need GC and rev cert of val
|
Route to Impact Fee Review | 3/25/2017 | 3/28/2017 | 3/27/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 3/6/2017 | | 3/25/2017 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 3/25/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - C.D.H | 3/6/2017 | | 3/24/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by Central District Health Department Brent Copes
|
Routing - PUBLIC WORKS | 3/6/2017 | | 3/23/2017 | | PASS |
Morgan Webb
|
|
|
signed of in ePlan by Public Works Morgan Webb
|
Routing PW Environmental | 3/7/2017 | | 3/21/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 3/6/2017 | | 3/9/2017 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 3/6/2017 | 3/6/2017 | 3/8/2017 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Sewer Rating | 3/7/2017 | | 3/7/2017 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 3/6/2017 | | PASS |
David Ferguson
|
|
|
|
Routing - Erosion and Sediment | 3/6/2017 | | 3/6/2017 | | PASS |
Melissa Jannusch
|
|
|
|
Routing - PLUMBING | 3/6/2017 | | 3/6/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 3/6/2017 | | 3/6/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 3/6/2017 | | 3/6/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00035
|
Intake Approval | | | 3/1/2017 | | FAIL |
David Ferguson
|
|
|
Major TI
Fire Flow letter
Door and Window Schedule not on page A2.1 as indicated on checklist
|
Application received | | | 2/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 25 2017 8:59AM
|