BLD-Final | 3/23/2017 | 3/23/2017 | 3/24/2017 | P | NR |
Mike Jordan
|
|
|
Needs dirveway placed prior to final. Will also need to pul electrical permit in the future for any electrical work.
|
DOC - Permit Finaled | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PASS |
Mike Jordan
|
|
|
. (This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Final | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | DONE |
Mike Jordan
|
|
|
Preston Phone #: ###-####
|
BLD-Framing/Rough-in | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | PASS |
Mike Jordan
|
|
|
Preston Phone #: ###-####
|
BLD-Wall Bracing | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | PASS |
Mike Jordan
|
|
|
Preston Phone #: ###-####
|
BLD-Framing/Rough-in | 3/17/2017 | 3/20/2017 | 3/20/2017 | A | NR |
Mike Jordan
|
|
|
Preston Phone #: ###-####. Electrical needs to be roughed in and electrical rough in inspection prior to framing inspection.
|
BLD-Wall Bracing | 3/17/2017 | 3/20/2017 | 3/20/2017 | A | FAIL |
Mike Jordan
|
|
|
Preston Phone #: ###-####. Install the tension straps on portal frame. Nails only on portal, no staples. Remainder of garage not inspected, covered by siding.
|
BLD-Wall Bracing | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | CANC |
Mike Jordan
|
|
|
presten Phone #: ###-####
|
BLD-Foundation | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PASS |
Mike Jordan
|
|
|
presten Phone #: ###-####
|
BLD-Footing | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | PART |
Mike Jordan
|
|
|
Preston Phone #: ###-####. Work in progress. Needs to install reinforcement at garage door.
|
OVERRIDE | | | 2/27/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | PASS |
Tisha Gallop
|
|
|
scan of small documents did not go through, large plan set in records
|
Plan assigned to (LEG) Tisha | 2/27/2017 | | 2/27/2017 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 2/27/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/27/2017 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 2/27/2017 | | DONE |
|
|
|
|
Application received | | 2/27/2017 | | | |
|
|
|
|