BLD-Final | 12/8/2017 | 12/11/2017 | 12/11/2017 | A | PASS |
Dave Hannah
|
|
|
please call 15 min ahead// Josiah Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2017 | 12/11/2017 | 12/11/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | CANC |
Tony Young
|
|
|
josiah Phone #: ###-#### // cancelled per phone call from Joe Levitch 10:21 12/7 //leg
|
BLD-Aging Inspection | 8/30/2017 | 8/30/2017 | 8/31/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/29/2017 | 8/29/2017 | 8/31/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 4/14/2017 | 4/17/2017 | 4/17/2017 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Steve Phone #: ###-####
|
BLD-Conference | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####-verification of tie beams,, ok per engineering,, verified rebar ties,, radon pipe dig out trenches verified
|
Routing Walk-In (BLD) | 3/2/2017 | 3/2/2017 | 3/2/2017 | A | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 3/2/2017 | 3/2/2017 | 3/2/2017 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 3/2/2017 | | 3/2/2017 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 3/2/2017 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2017 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/2/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/2/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | FAIL |
Tisha Gallop
|
|
|
1) If structural as engineers letter states, need engineering calculations and foundation plan showing location of beam sealed by engineer.
2) If non-structural beam need letter from engineer stating that this beam is cosmetic only. Letter needs to be signed by homeowners. Calcs and sealed plan not required.
|
1st review completed | | | 2/28/2017 | | FAIL |
|
|
|
|
Application received | | 2/28/2017 | | | |
|
|
|
|