Permit Information
Permit NumberBLD17-00442
StatusFinaled
Name RICK SHIPMAN CONSTRUCTION INC
Site Address 8300 W OVERLAND RD
Project NameWalmart Canopy - #2508
Customer NumberBLD17-00013
ePlanReviewNo
Description
WALMART (ePlan case # bld17-00013) Permit to construct a 20'x72'x13' metal and fabric canopy over 6 of the proposed customer pick-up parking stalls. Also replace exit door hardware with keypad operation located on the west side of the building. The canopy is not fire sprinklered however the main store is. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Special inspections shall be in accordance with the attached #310 Statement of Special Inspection form and the structural drawings. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/19/20184/10/2018 DONE
mailed 4-11-18
Second Notice 2/22/20183/14/2018 DONE
mailed 3-16-18
First Notice1/29/20181/29/20182/12/2018 DONE
DetailsDave Hannah
Mailed 2-13-18
BLD-Final1/26/20181/29/20181/29/2018APASS
DetailsDave Hannah
LORI Phone #: ###-####
DOC - Permit Finaled1/29/20181/29/20181/29/2018PPASS
DetailsDave Hannah
FIRE-Final Inspection8/31/20178/31/20178/31/2017PPASS
DetailsTroy Cobbley
Life safety passed. Fire hydrant location is acceptable.

Lorin Phone #: ###-####
BLD-Final8/29/20178/30/20178/30/2017PNR
DetailsMike Jordan
Lori Phone #: ###-####. Fire/life/safety failed. No approved plans on site.
FIRE-Final Inspection8/29/20178/30/20178/30/2017AFAIL
DetailsTroy Cobbley
No inspection performed due to not city approved plans or small documents on site. Entire canopy has been relocated across parking lot and now may be interferring with an existing fire hydrant.

Lori Phone #: ###-####
BLD-Foundation5/17/20175/17/20175/17/2017PPART
DetailsMike Jordan
As close to 5 as possible // Robert Phone #: ###-####. Work in progress on drilling piers. Special inspector on site. Ok to place concrete pending special inspections.
Telephone call  5/17/2017 DONE
emailed the fees due sheet to Brandon
Issue PAID IN FULL permit  5/17/2017 DONE
Plan assigned to (DAF)3/1/20173/1/20174/20/2017 DONE
DetailsDavid Ferguson
due 4/21 re-review (2nd done) due 4/10 resubmittal for Walmart canopy (1st done) Created case for Dave. customer uploaded plans under bld17-00013
Routing Off Site - STRUCTURAL4/17/2017 4/20/2017 PASS
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  4/20/2017 DONE
Permit Ready to Issue  4/20/2017 DONE
***met 5-17-17 CAN***need GC form and rev cert of val
Routing - PLAN CHECK4/17/2017 4/19/2017 PASS
DetailsDavid Ferguson
Routing - Design Review4/5/2017 4/17/2017 PASS
DetailsAndrea Tuning
Routing Off Site - STRUCTURAL4/5/2017 4/10/2017 FAIL
DetailsDavid Ferguson
Routing - PLAN CHECK4/10/2017 4/10/2017 FAIL
DetailsDavid Ferguson
Routing - FIRE3/8/20173/8/20173/8/2017 PASS
DetailsKatie Marron
Canopy does not affect FD Access.
Routing - Erosion and Sediment3/8/2017 3/8/2017 PASS
DetailsMelissa Jannusch
Route to Impact Fee Review3/3/20173/6/20173/6/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
Routing Off Site - STRUCTURAL3/1/2017 3/3/2017 FAIL
DetailsDavid Ferguson
Dave H. failed for structural issues
1st review completed  3/3/2017 FAIL
DetailsDavid Ferguson
Routing - PLAN CHECK3/1/2017 3/3/2017 FAIL
DetailsDavid Ferguson
Application received 3/1/2017