BLD-Final | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 5/21/2018 | 5/21/2018 | 5/21/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 5/17/2018 | 5/18/2018 | 5/21/2018 | P | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Pannell
|
BLD-Aging Inspection | 2/8/2018 | 2/8/2018 | 2/13/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 2/7/2018 | 2/7/2018 | 2/12/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 1/9/2018 | 1/12/2018 | 1/12/2018 | P | NR |
Tony Young
|
|
|
|
BLD-Conference | 1/12/2018 | 1/12/2018 | 1/12/2018 | A | PART |
Tony Young
|
|
|
switching this to AM instead of PM please call 30 mins prior thank you ! Nate Phone #: ###-#### Inspection requested via web by Nate Pannell,, walk through general
|
BLD-Final | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | NR |
Brandon Shaw
|
|
|
Need Ele final
|
BLD-Energy code compliance | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | PASS |
Jim Sly
|
|
|
Nate Pannell Phone #: ###-####
|
BLD-Framing/Rough-in | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | PASS |
Jim Sly
|
|
|
Nate Pannell Phone #: ###-####
|
BLD-Wall Bracing | 8/30/2017 | 8/31/2017 | 8/31/2017 | A | PASS |
Jim Sly
|
|
|
Nate-husband Phone #: ###-####
|
OVERRIDE | | | 8/25/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/25/2017 | 8/25/2017 | 8/25/2017 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 8/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/25/2017 | | 8/25/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/25/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/25/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/25/2017 | | DONE |
|
|
|
Plan Mod no fees per Brian Mc
|
(F) Reprint permit | | | 8/25/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | FAIL |
Brian McGowan
|
|
|
Needed to verify if there is support in the crawl space and needs top provide the engineering for the proposed beam.
|
1st review completed | | | 8/24/2017 | | FAIL |
Brian McGowan
|
|
|
Needed to verify if there is support in the crawl space and needs top provide the engineering for the proposed beam.
|
Routing - PLAN CHECK | 8/24/2017 | | 8/24/2017 | | FAIL |
Brian McGowan
|
|
|
Needed to verify if there is support in the crawl space and needs top provide the engineering for the proposed beam.
|
OVERRIDE | | | 8/2/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/2/2017 | 8/2/2017 | 8/2/2017 | A | DONE |
Josh Bogle
|
|
|
|
Plan Modification Accepted | | | 8/2/2017 | | DONE |
Josh Bogle
|
|
|
PER ADDED VALUE
|
Permit Ready to Issue | | | 8/2/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/2/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/2/2017 | | DONE |
|
|
|
|
BLD-Conference | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | DONE |
Jim Sly
|
|
|
Call half hour before // Nate Phone #: ###-####
|
BLD-Footing | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Tony Young
|
|
|
Jason Phone #: ###-####
|
OVERRIDE | | | 6/1/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/1/2017 | 6/1/2017 | 6/1/2017 | A | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 6/1/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/1/2017 | | 6/1/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/1/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/1/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/1/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | FAIL |
Brian McGowan
|
|
|
Ditto from the previous two walk in encounters.
|
Routing Walk-In (BLD) | 4/27/2017 | 4/27/2017 | 4/27/2017 | A | FAIL |
David Ferguson
|
|
|
Spoke to Nate and basically told him the same thing that Tisha told him on his visit. Need Engineering!!!
|
Routing Walk-In (Zoning) | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | FAIL |
Tisha Gallop
|
|
|
need all structural details. need full size plans if they are drawn to scale. Need engineering for large beams, cantilevered floor over beams, and lateral need eng. need cross section of building with foundation sized, framing details and insulation.
|
1st review completed | | | 3/1/2017 | | FAIL |
|
|
|
|
Application received | | 3/1/2017 | | | |
|
|
|
|