Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-00446
StatusFinaled
Name PANNELL GINA M
Site Address 6431 N RUMFORD AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
**PLAN MODIFICATION 8-25-17 TO REMOVE BEARING WALL BETWEEN EXISTING BEDROOM AND KITCHEN. ENGINEERING FOR THE BEAM HAS BEEN PROVIDED. ADDITIONAL FOOTING SUPPORTS ARE REQUIRED. **bjm** MODIFICATION - BATHROOM NOW A PART OF THE SCOPE OF WORK - AS DRAWN Permit for 320sq' 2nd level addition on stilts. Heating to be ductless mini-split. All work per plans, engineering, notes, & local code. Separate electrical & mechanical permits required. No bathroom work at this time. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/21/20185/21/20185/21/2018PPASS
DetailsJim Sly
DOC - Permit Finaled5/21/20185/21/20185/21/2018PPASS
DetailsJim Sly
BLD-Conference5/17/20185/18/20185/21/2018PCANC
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Nate Pannell
BLD-Aging Inspection2/8/20182/8/20182/13/2018 PEND
DetailsTony Young
BLD-Aging Inspection2/7/20182/7/20182/12/2018 PEND
DetailsTony Young
BLD-Final1/9/20181/12/20181/12/2018PNR
DetailsTony Young
BLD-Conference1/12/20181/12/20181/12/2018APART
DetailsTony Young
switching this to AM instead of PM please call 30 mins prior thank you ! Nate Phone #: ###-#### Inspection requested via web by Nate Pannell,, walk through general
BLD-Final1/8/20181/9/20181/9/2018ANR
DetailsBrandon Shaw
Need Ele final
BLD-Energy code compliance9/25/20179/26/20179/26/2017APASS
DetailsJim Sly
Nate Pannell Phone #: ###-####
BLD-Framing/Rough-in9/25/20179/26/20179/26/2017APASS
DetailsJim Sly
Nate Pannell Phone #: ###-####
BLD-Wall Bracing8/30/20178/31/20178/31/2017APASS
DetailsJim Sly
Nate-husband Phone #: ###-####
OVERRIDE  8/25/2017  
Routing Walk-In (BLD)8/25/20178/25/20178/25/2017ADONE
DetailsBrian McGowan
1st review completed  8/25/2017 DONE
DetailsBrian McGowan
Routing - PLAN CHECK8/25/2017 8/25/2017 PASS
DetailsBrian McGowan
Case Summary (BLD)  8/25/2017 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  8/25/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  8/25/2017 DONE
CHANGE STATUS TO (ISS)  8/25/2017 DONE
Plan Mod no fees per Brian Mc
(F) Reprint permit  8/25/2017 DONE
Routing Walk-In (BLD)8/24/20178/24/20178/24/2017PFAIL
DetailsBrian McGowan
Needed to verify if there is support in the crawl space and needs top provide the engineering for the proposed beam.
1st review completed  8/24/2017 FAIL
DetailsBrian McGowan
Needed to verify if there is support in the crawl space and needs top provide the engineering for the proposed beam.
Routing - PLAN CHECK8/24/2017 8/24/2017 FAIL
DetailsBrian McGowan
Needed to verify if there is support in the crawl space and needs top provide the engineering for the proposed beam.
OVERRIDE  8/2/2017  
Routing Walk-In (BLD)8/2/20178/2/20178/2/2017ADONE
DetailsJosh Bogle
Plan Modification Accepted  8/2/2017 DONE
DetailsJosh Bogle
PER ADDED VALUE
Permit Ready to Issue  8/2/2017 DONE
CHANGE STATUS TO (ISS)  8/2/2017 DONE
(F) Reprint permit  8/2/2017 DONE
BLD-Conference7/31/20178/1/20178/1/2017ADONE
DetailsJim Sly
Call half hour before // Nate Phone #: ###-####
BLD-Footing6/19/20176/20/20176/20/2017APASS
DetailsTony Young
Jason Phone #: ###-####
OVERRIDE  6/1/2017  
Routing Walk-In (BLD)6/1/20176/1/20176/1/2017ADONE
DetailsJosh Bogle
1st review completed  6/1/2017 DONE
DetailsJosh Bogle
Routing - PLAN CHECK6/1/2017 6/1/2017 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  6/1/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  6/1/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  6/1/2017 DONE
DetailsJosh Bogle
Permit Ready to Issue  6/1/2017 DONE
Issue PAID IN FULL permit  6/1/2017 DONE
Routing Walk-In (BLD)5/24/20175/24/20175/24/2017PFAIL
DetailsBrian McGowan
Ditto from the previous two walk in encounters.
Routing Walk-In (BLD)4/27/20174/27/20174/27/2017AFAIL
DetailsDavid Ferguson
Spoke to Nate and basically told him the same thing that Tisha told him on his visit. Need Engineering!!!
Routing Walk-In (Zoning)3/1/20173/1/20173/1/2017PPASS
DetailsColleen T Carroll
Routing Walk-In (BLD)3/1/20173/1/20173/1/2017PFAIL
DetailsTisha Gallop
need all structural details. need full size plans if they are drawn to scale. Need engineering for large beams, cantilevered floor over beams, and lateral need eng. need cross section of building with foundation sized, framing details and insulation.
1st review completed  3/1/2017 FAIL
Application received 3/1/2017