Third Notice | | 1/16/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
Second Notice | | 12/22/2017 | 1/11/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
First Notice | | 12/7/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
Zoning Approval | 11/27/2017 | 11/27/2017 | 11/27/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Permanent Occupancy | | | 11/27/2017 | | DONE |
|
|
|
|
Zoning Approval | 11/24/2017 | 11/24/2017 | 11/24/2017 | | FAIL |
Katelyn Menuge
|
|
|
Parking not striped.
|
BLD-Final | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | PASS |
Tony Young
|
|
|
Ben Phone #: ###-####,, ok for c of o
|
BLD-Final | 11/17/2017 | 11/21/2017 | 11/21/2017 | A | PEND |
Tony Young
|
|
|
Ben Phone #: ###-####,, needs plumbing final,, then ok
|
BLD-Final | 11/16/2017 | 11/17/2017 | 11/17/2017 | P | PART |
Tony Young
|
|
|
Ben Phone #: ###-####,, needs plumbing final
|
FIRE-Final Inspection | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection for area of work passed/complete.
|
FIRE-Conference | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
|
BLD-Footing | 8/25/2017 | 8/28/2017 | 8/28/2017 | A | DONE |
Tony Young
|
|
|
Ben Phone #: ###-####
|
BLD-Other | 8/25/2017 | 8/25/2017 | 8/25/2017 | P | PASS |
Tony Young
|
|
|
Fire rating - north wall - Ben Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/25/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/4/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 7/10/2017 | 7/10/2017 | 8/4/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/26/2017 | | 8/4/2017 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 8/4/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan Mod
Change status to ISS after all fees paid in full. DO NOT RE-ISSUE
|
Routing - PLANNING | 7/26/2017 | | 7/27/2017 | | PASS |
David Moser
|
|
|
|
Routing - Design Review | 7/26/2017 | | 7/27/2017 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Framing/Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PASS |
Tony Young
|
|
|
Call hour before // Ben Phone Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | PART |
Tony Young
|
|
|
shear, fire rating, and framing // Ben Phone #: ###-####,, firewall, shear ok
|
Routing - PLAN CHECK | 7/10/2017 | | 7/23/2017 | | FAIL |
Carl D Madsen
|
|
|
Failed pending other departments
|
Routing PW Solid Waste | 7/20/2017 | | 7/20/2017 | | PASS |
Evan Carpenter
|
|
|
Discussed with architect switching parking space with solid waste loading zone.
|
Routing PW Solid Waste | 7/17/2017 | | 7/18/2017 | | FAIL |
Evan Carpenter
|
|
|
Move trash dumpster pick up area over one parking space; as it is the truck would have trouble backing into the pick up area.
|
Routing - FIRE | 7/15/2017 | 7/15/2017 | 7/17/2017 | | PASS |
Scott Arellano
|
|
|
No change to original review comments.
|
Routing PW Drainage | 7/17/2017 | | 7/17/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - Design Review | 7/15/2017 | | 7/17/2017 | | FAIL |
Andrea Tuning
|
|
|
Site plan and Landscape plans do not match.
The site plan is not waht was approved through the DR process.
|
Routing - PUBLIC WORKS | 7/15/2017 | | 7/17/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan Modification Accepted | | | 7/10/2017 | | DONE |
Christina Prado
|
|
|
Plan mod to eliminate outdoor trash enclosure, termination of fire wall assembly & add engineering for entry canopy
|
Routing - PUBLIC WORKS | 6/6/2017 | | 6/8/2017 | | FAIL |
Rachael Beierle
|
|
|
NEEDS TO BE REVIEWED BY SOLID WASTE.
|
Routing PW Solid Waste | 6/6/2017 | | 6/7/2017 | | FAIL |
Evan Carpenter
|
|
|
Parking lot too small for truck to turn around (11'x35' vehicle); Cannot have truck back out onto a public street.
|
OVERRIDE | | | 6/2/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/2/2017 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 6/2/2017 | | DONE |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 6/2/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 6/2/2017 | | DONE |
Christina Prado
|
|
|
Need ACHD, RP, **Met** GC Form and Revised Cert of Value
Remove Parcel Tag & Ask about Final on BLD17-00789 when issued
|
Plan assigned to (CDM) | 3/24/2017 | 3/24/2017 | 6/1/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp. Cutting Edge Kitchens 4/17
|
Routing - PLAN CHECK | 5/25/2017 | | 6/1/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 5/25/2017 | | 6/1/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 5/25/2017 | | 5/26/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing - Design Review | 5/25/2017 | | 5/26/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 5/4/2017 | | 5/11/2017 | | FAIL |
Carl D Madsen
|
|
|
PENDING OTHER DEPARTMENTS
|
Routing Off Site - STRUCTURAL | 5/4/2017 | | 5/11/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 5/4/2017 | | 5/9/2017 | | FAIL |
Susan Riggs
|
|
|
Successfully dedicate an additional 4-feet of right-of-way to ACHD.
Obtain a license agreement from ACHD to allow the building located in the right-of-way to be utilized until it is needed in the future. Submit a copy of this agreement to the City of Boise.
|
Routing - MECHANICAL | 5/4/2017 | | 5/4/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/4/2017 | | 5/4/2017 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 5/4/2017 | | 5/4/2017 | | FAIL |
Andrea Tuning
|
|
|
Landscape plan and site plan should match.
Provide 13 parking spaces on the site with one (1) being a van accessible stall.
Install a third Japanese Lilac tree along State Street near the east property line.
Successfully dedicate an additional 4-feet of right-of-way to ACHD.
Obtain a license agreement from ACHD to allow the building located in the right-of-way to be utilized until it is needed in the future. Submit a copy of this agreement to the City of Boise.
|
1st review completed | | | 4/15/2017 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/24/2017 | | 4/15/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/24/2017 | | 4/15/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 3/24/2017 | 3/24/2017 | 3/28/2017 | | PASS |
Katie Marron
|
|
|
comments attached to case.
|
Routing - Erosion and Sediment | 3/24/2017 | | 3/28/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Need to designate RP
|
Routing - Design Review | 3/24/2017 | | 3/27/2017 | | FAIL |
Andrea Tuning
|
|
|
Provide 13 parking spaces on the site with one (1) being a van accessible stall.
Install a third Japanese Lilac tree along State Street near the east property line.
Successfully dedicate an additional 4-feet of right-of-way to ACHD.
Obtain a license agreement from ACHD to allow the building located in the right-of-way to be utilized until it is needed in the future. Submit a copy of this agreement to the City of Boise.
|
Routing PW Street Lights | 3/27/2017 | | 3/27/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 3/27/2017 | | 3/27/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - MECHANICAL | 3/24/2017 | | 3/27/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 3/24/2017 | | 3/27/2017 | | FAIL |
Susan Riggs
|
|
|
Need License agreement for landscaping in the right-of-way.
|
Routing - Addressing | 3/24/2017 | | 3/27/2017 | | PASS |
Laura Hunter
|
|
|
One company will occupy building. Will continue to use 5032 W State St as the address and eliminate Unit A and B
|
Routing - PUBLIC WORKS | 3/24/2017 | | 3/27/2017 | | PASS |
Morgan Webb
|
|
|
|
Plan Reviewer's activity | | | 3/24/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Jeff, the owner of the building was in today. In visiting with him he indicated that he may have acquired enough property not to have the designed fire rated construction. I printed out the request uploaded in the documents and gave them to Jason. There were sheets indicating plans and calcs however the sheets were blank in the request letter.
I have routed this project for review and Carl M will be the assigned plans examiner.
Please make sure that we have documentation for ACHD in regard to usage fees prior to issuance of the building permit. If no fees are do please forward the email from ACHD to us to add to the file. If fees are due you have the option of paying ACHD directly and submitting the receipt when you pick up the permit or you can pay the fee to the City of Boise when you pick up the permit.
Can you verify if we still need the requested alternate?
Thank you
Adele Schaffeld-Griffin
Assistant Building Official / Plan Review Manager
Planning & Development Services Department
City of Boise - 150 N. Capitol Blvd.
P.O. Box 500
Boise, ID 83701
Office ###-####
Email – aschaffeldgriffin@cityofboise.org
“Building Boise Together.”
|
Intake Approval | | | 3/24/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl M approved per screen
|
Intake Approval | | | 3/13/2017 | | FAIL |
|
|
|
The mechanical calculations and systems are required to be designed by a mechanical engineer.
There are exterior modifications to the building and Design review approval is required as noted in the CUP approval.
Exterior improvements are being made and either and ESC waiver letter or a ESC plan is required.
|
Application received | | | 3/3/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 3 2017 8:32AM
|