Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD17-00477
StatusFinaled
Name A BOISE PROJECT LLC
Site Address 7031 S FEDERAL WAY
Project NameSE Boise Boat & RV Storage
Customer NumberEPLAN 17-00412, 17-00466 TO 00477
ePlanReview 
Description
(SE BOISE BOAT AND RV STORAGE)(13 PERMITS TOTAL FILED UNDER BLD17-00412) Building A: Permit for the construction of a new 5,460 sq. ft. steel storage building per the approved plans and attached engineering. This building consists of 13, 12 x 35 units for use as RV storage. Commercial grading and utility permit being processed under permit number GRD16-00085. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/26/2018 DONE
First Notice 3/3/20183/13/2018 DONE
mailed 3-14-18
BLD-Final2/20/20182/21/20182/21/2018APASS
DetailsJim Sly
Keith Phone #: ###-####
PubWorks Occupancy Approval2/21/20182/21/20182/21/2018 DONE
DetailsTiffany Lowery
Permanent Occupancy  2/21/2018 DONE
FIRE-Final Inspection2/14/20182/20/20182/20/2018APASS
DetailsJim Page
Life fire safety inspection complete.
BLD-Aging Inspection1/30/20181/30/20181/30/2018 PEND
DetailsJim Storey
ele
Zoning Approval12/12/201712/12/201712/12/2017 DONE
DetailsAndrea Tuning
BLD-Final11/30/201711/30/201711/30/2017PPART
DetailsJim Storey
temp ok
BLD-Conference11/30/201711/30/201711/30/2017PPASS
DetailsJim Storey
Temporary Occupancy11/30/20172/28/201811/30/2017 DONE
DetailsCandy A. Nichols
Zoning Approval Temp11/21/201711/21/201711/21/2017 DONE
DetailsAndrea Tuning
Bond has been placed for fencing and striping. The site still needs 2 more street trees on Federal Way, 6 new street trees along I-84, a tree in the terminal planter and additional vegetation around the swale adjacent to Federal Way.
BLD-Final11/13/201711/14/201711/14/2017PFAIL
DetailsJim Storey
Keever Phone #: ###-####
FIRE-Final Inspection11/13/201711/14/201711/14/2017APASS
DetailsTroy Cobbley
Life safety passed

Keever Phone #: ###-####
FIRE-Final Inspection11/13/201711/13/201711/13/2017PFAIL
DetailsTroy Cobbley
No city approved plans or small documents.

Keever Phone #: ###-####
FIRE-Final Inspection11/7/201711/8/201711/8/2017AFAIL
DetailsTroy Cobbley
No city approved plans or small documents on site. No real inspection was performed. I spoke to the contractor about the requirement for the Opticon system at the facility gates, fire extinguishers, addressing of the buildings (A, B, C...ect)

Keever Phone #: ###-####
PubWorks Temp Occupancy Appr11/6/201711/6/201711/6/2017 DONE
DetailsTiffany Lowery
BLD-Footing8/9/20178/9/20178/9/2017PPASS
DetailsJim Storey
Permit Ready to Issue  7/28/2017 DONE
all met
Issue PAID IN FULL permit  7/28/2017 DONE
Print Occupancy Form  7/28/2017 DONE
Routing Off Site - STRUCTURAL7/18/2017 7/18/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/18/2017 DONE
Routing - PLAN CHECK7/17/2017 7/18/2017 PASS
DetailsCarl D Madsen
Routing - Erosion and Sediment3/16/2017 7/18/2017 PASS
DetailsAndy J. Long
Routing PW Environmental3/16/2017 7/18/2017 PASS
DetailsRick Christenson
Plan assigned to (CDM)3/16/20173/16/20177/17/2017 PASS
DetailsCarl D Madsen
1st comp SE Boise Boat & RV Storage
Routing PW Drainage3/16/2017 7/17/2017 PASS
DetailsBrian Murphy
Routing PW Street Lights3/16/2017 7/17/2017 PASS
DetailsTom Marshall
Routing PW Sewer Design3/16/2017 7/17/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Solid Waste3/16/2017 7/17/2017 PASS
DetailsEvan Carpenter
Routing - Design Review7/17/2017 7/17/2017 PASS
DetailsAndrea Tuning
Routing - Design Review6/2/2017 6/2/2017 FAIL
DetailsAndrea Tuning
This project has not receieved DR approval.
Routing - FIRE7/19/20177/19/20175/25/2017 PASS
DetailsScott Arellano
Routing Off Site - STRUCTURAL3/16/2017 4/27/2017 FAIL
DetailsCarl D Madsen
1st review completed  4/27/2017 FAIL
Routing - PLAN CHECK3/16/2017 4/27/2017 FAIL
DetailsCarl D Madsen
SE Boise Boat & RV Storage
Plan assigned to (DAF)3/16/20173/16/20173/21/2017 DEFR
DetailsDavid Ferguson
SE Boise Boat & RV Storage
Routing - Addressing3/16/2017 3/21/2017 PASS
DetailsLaura Hunter
Routing - FIRE3/16/20173/16/20173/20/2017 PASS
DetailsKatie Marron
Comments attached
Routing - PUBLIC WORKS3/16/2017 3/16/2017 PASS
DetailsRachael Beierle
Routing - PLANNING3/16/2017 3/16/2017 PASS
DetailsCody Riddle
Routing - PLANNING Land Div3/16/2017 3/16/2017 PASS
DetailsTodd Tucker
Routing - Design Review3/16/2017 3/16/2017 FAIL
DetailsSarah Schafer
An administrative level design review modification is needed to DRH16-00446. Changes to the building lengths, locations, design of the office building, and sidewalk location. Corinne was notified 3/16/17.
Intake Approval  3/16/2017 PASS
Application received 3/3/2017