Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-00487
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 416 S 8TH ST Unit: 100
Project NameJelli - 1st story
Customer Number 
ePlanReviewYes
Description
(JELLI – TENANT SPACE EXPANSION – 1ST STORY) The fire sprinkler system is used for occupancy flexibility. To expand an existing 4,318 square foot tenant space located on the 1st story into an adjacent 969 square foot area. After the expansion, this tenant space will have a total floor area of about 5,287 square feet. The new tenant will be an office use. Work is to include removing an interior nonstructural tenant demising wall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/14/20174/25/2017 DONE
This permit finaled on the web by Brian McCoy
BLD-Final4/3/20174/4/20174/4/2017PPASS
DetailsDave Hannah
Please call me 30min before ###-#### Phone #: ###-#### Inspection requested via web by Brian McCoy
FIRE-Final Inspection4/3/20174/4/20174/4/2017APASS
DetailsJim Page
No fire sprinkler modifications no fire alarm modifications, fire extinguishers are in place with current inspection tags, (Glass on doors has space labeled as Suite 101) Final life fire safety inspection passed/complete.
Permanent Occupancy  4/4/2017 DONE
Issue PAID IN FULL permit  4/3/2017 DONE
Print Occupancy Form  4/3/2017 DONE
Plan assigned to (CJW)3/7/20173/7/20173/20/2017 PASS
DetailsCarl Westfall
(1st almost done) (Mar 15 - 7 days) (Mar 20 - 10 days) (1 sheet) Jelli
Routing - PLAN CHECK3/7/2017 3/20/2017 PASS
DetailsCarl Westfall
1st review completed  3/20/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/20/2017 DONE
Permit Ready to Issue  3/20/2017 DONE
Need GC Form and Revised Cert of Value
Routing - FIRE3/7/20173/7/20173/9/2017 PASS
DetailsKatie Marron
Comments attached to case. PDS Fire Inspector to verify sprinkler spacing (and notification if present) is ok after removal of tenant demising wall.
Intake Approval  3/7/2017 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing3/7/2017 3/7/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/7/2017 3/7/2017 PASS
DetailsMorgan Webb
Application received  3/3/2017 DONE
Application submitted via PDS Online on Mar 3 2017 4:50PM