BLD-Energy code compliance | 5/4/2017 | 5/5/2017 | 5/5/2017 | P | PASS |
Brandon Shaw
|
|
|
Clint Phone #: ###-####
|
BLD-Framing/Rough-in | 5/4/2017 | 5/5/2017 | 5/5/2017 | A | PASS |
Mike Jordan
|
|
|
Clint Phone #: ###-####
|
BLD-Wall Bracing | 5/4/2017 | 5/4/2017 | 5/4/2017 | P | PASS |
Mike Jordan
|
|
|
Clint Phone #: ###-####
|
Routing - MECHANICAL | 4/24/2017 | | 4/24/2017 | | PASS |
Troy James
|
|
|
manual j report
|
BLD-Foundation | 4/7/2017 | 4/10/2017 | 4/10/2017 | A | PART |
Mike Jordan
|
|
|
Please call ahead to meet for Foundation Wall - Chuck Phone #: ###-####
|
BLD-Foundation | 4/5/2017 | 4/6/2017 | 4/7/2017 | P | PASS |
Jim Sly
|
|
|
Chuck-would like late PM and please call to let know results. Phone #: ###-####
|
OVERRIDE | | | 3/9/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 3/6/2017 | 3/6/2017 | 3/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | | | 3/9/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 3/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/9/2017 | | DONE |
Christina Prado
|
|
|
All requirments met for issuance
|
Telephone call | | | 3/9/2017 | | DONE |
Christina Prado
|
|
|
Called Robert to advise permit is ready and gave final pick up fees due
|
Issue PAID IN FULL permit | | | 3/9/2017 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/6/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/6/2017 | | PASS |
|
|
|
|
Routing - PLANNING | 3/6/2017 | | 3/6/2017 | | PASS |
Jeff Lowe
|
|
|
|
Telephone call | | | 3/6/2017 | | DONE |
|
|
|
called Robert-need one more set of drawings before we can start the plan rereview-left message on his phone
|
Application received | | 3/6/2017 | | | |
|
|
|
|