BLD-Final | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Brandon Shaw
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Brandon Shaw
|
|
|
Kevin Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/28/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 3/27/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 3/24/2017 | 3/24/2017 | 3/27/2017 | A | DONE |
Brian McGowan
|
|
|
|
Routing - Erosion and Sediment | 3/24/2017 | | 3/27/2017 | | PASS |
Melissa Jannusch
|
|
|
Waiver approved
|
1st review completed | | | 3/27/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/27/2017 | | 3/27/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/27/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/27/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/27/2017 | | DONE |
|
|
|
MET
|
Telephone call | | | 3/27/2017 | | DONE |
|
|
|
called to let know permit is ready and how much is owed
|
Routing Walk-In (Zoning) | 3/24/2017 | 3/24/2017 | 3/24/2017 | A | PASS |
Leon Letson
|
|
|
|
Routing Walk-In (Zoning) | 3/6/2017 | 3/6/2017 | 3/24/2017 | P | DONE |
Brittany Hill
|
|
|
|
Routing PW Grading-Hillside | 3/24/2017 | | 3/24/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Application received | | 3/6/2017 | | | |
|
|
|
|