BLD-Final | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
DOC - Permit Finaled | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 10/12/2017 | 10/12/2017 | 10/12/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | CANC |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
OVERRIDE | | | 10/4/2017 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/4/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/4/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/4/2017 | | DONE |
|
|
|
DO NOT REISSUE - plan mod fee due
|
Plan assigned to (BJM) | 9/28/2017 | 9/28/2017 | 10/3/2017 | | DONE |
Brian McGowan
|
|
|
Plan Mod (BJM)
|
Routing - PLAN CHECK | | | 10/3/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing - PUBLIC WORKS | 9/29/2017 | | 10/3/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 10/2/2017 | | 10/2/2017 | | PASS |
Melissa Jannusch
|
|
|
Resumittal has retaining wall.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLANNING | 9/29/2017 | | 10/2/2017 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Erosion and Sediment | 9/29/2017 | | 10/2/2017 | | PASS |
Andy J. Long
|
|
|
|
Plan Modification Accepted | | | 9/28/2017 | | DONE |
|
|
|
started plan mod in e plan-customer making changes to the retaining wall
|
Application received | | | 9/28/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 6 2017 3:57PM
|
BLD-Other | 6/19/2017 | 6/19/2017 | 6/19/2017 | P | PASS |
Brandon Shaw
|
|
|
WUI soffit insp// Rollo Phone #: ###-####
|
BLD-Energy code compliance | 6/14/2017 | 6/14/2017 | 6/15/2017 | P | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Framing/Rough-in | 6/9/2017 | 6/12/2017 | 6/12/2017 | P | FAIL |
Brandon Shaw
|
|
|
raul Phone #: ###-#### 1) Pending truss engineering on 2 91/2" beam at porch 2) Grider nailing at B3 and G3 3) 3 2x6 header at man door at mudroom to garage OK to Insulate
|
BLD-Wall Bracing | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Foundation | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | PASS |
Jim Storey
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 4/10/2017 | 4/10/2017 | 4/10/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 4/6/2017 | 4/7/2017 | 4/7/2017 | P | NR |
Jim Sly
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell No Humans, equipment or forms on site. Called Dion. Left voice Mssg. Need Public Works to sign off proir to calling for footing inspection.
|
Issue PAID IN FULL permit | | | 4/4/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/4/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 3/29/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 3/8/2017 | 3/8/2017 | 3/29/2017 | | DONE |
Brian McGowan
|
|
|
Due 3-27 ePlan Level 2 - Fail- Truss layout needs to be modified. Footings at rear patio need to be verified.
|
Routing - PLAN CHECK | 3/29/2017 | | 3/29/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/29/2017 | | DONE |
|
|
|
All Met
|
1st review completed | | | 3/26/2017 | | FAIL |
Brian McGowan
|
|
|
Truss layout needs to be modified. Footings at rear patio need to be verified.
|
Routing - PLAN CHECK | 3/8/2017 | | 3/26/2017 | | FAIL |
Brian McGowan
|
|
|
Truss layout needs to be modified. Footings at rear patio need to be verified.
|
Route to Impact Fee Review | 3/8/2017 | 3/11/2017 | 3/13/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - MECHANICAL | 3/8/2017 | | 3/10/2017 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 3/8/2017 | 3/8/2017 | 3/9/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access, hydrant availability and defensible space.
|
Routing PW Grading-Hillside | 3/8/2017 | | 3/9/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLANNING | 3/8/2017 | | 3/8/2017 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 3/8/2017 | | 3/8/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/8/2017 | | 3/8/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 3/8/2017 | | 3/8/2017 | | PASS |
Andy J. Long
|
|
|
BMPs: construction entrance, washout, sign, staging area, DI protection, silt fence on front edge of property. Site preparation required call ###-#### to schedule
|
Plans ACCEPTED BY PLAN TECH | | | 3/8/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/8/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/8/2017 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 3/8/2017 | | 3/8/2017 | | DEFR |
Tisha Gallop
|
|
|
|