BLD-Final | 1/17/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Jim Storey
|
|
|
Call 30 minutes ahead // Matt Phone #: ###-####
|
DOC - Permit Finaled | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 7/27/2018 | 7/27/2018 | 7/27/2018 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 | | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-#### framing and insulation ok
|
BLD-Framing/Rough-in | 10/19/2017 | 10/20/2017 | 10/20/2017 | P | FAIL |
Jim Storey
|
|
|
Matthew Phone #: ###-####
|
BLD-Framing/Rough-in | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PART |
Jim Storey
|
|
|
Matt Phone #: ###-#### landing to old house ok
|
BLD-Foundation | 6/28/2017 | 6/28/2017 | 6/28/2017 | P | PASS |
Jim Storey
|
|
|
Wall // Brandon Phone #: ###-####
|
BLD-Footing | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PASS |
Jim Storey
|
|
|
Pouring at 3:30 - Brandon Phone #: ###-####
|
Routing Walk-In (BLD) | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | PASS |
Tisha Gallop
|
|
|
|
BLD-Foundation | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | PART |
Brandon Shaw
|
|
|
Brandon Phone #: ###-#### Phase I, foundation wall for stairs
|
BLD-Footing | 6/19/2017 | 6/19/2017 | 6/19/2017 | P | PASS |
Jim Storey
|
|
|
Brandon Phone #: ###-####
|
OVERRIDE | | | 3/20/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/20/2017 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (LEG) Tisha | 3/7/2017 | | 3/20/2017 | | DONE |
Tisha Gallop
|
|
|
1st review 3/9; ***walk in received 3/7 (paper)
|
Inspection Record Card- Bld | | | 3/20/2017 | | |
|
|
|
|
Routing - PLAN CHECK | 3/20/2017 | | 3/20/2017 | | PASS |
Tisha Gallop
|
|
|
full size plans taken to records
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2017 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2017 | | DONE |
Christina Prado
|
|
|
Called Matthew to advise permit is ready pending GC form and gave fees due
|
Permit Ready to Issue | | | 3/20/2017 | | |
Christina Prado
|
|
|
Homeowner RP & GC - need signed form only
|
Routing - PLAN CHECK | 3/7/2017 | | 3/9/2017 | | FAIL |
Tisha Gallop
|
|
|
spoke to applicant on phone about corrections
|
Routing Walk-In (Zoning) | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | FAIL |
Brian McGowan
|
|
|
Full house drawings on 8 1/2 x 11 sheets. I could not read all the notes. Asked him to submit 1/4" drawings (2) sets
|
Routing Walk-In (BLD) | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | CANC |
Tisha Gallop
|
|
|
took in as level 2
|
1st review completed | | | 3/7/2017 | | FAIL |
Brian McGowan
|
|
|
Full house drawings on 8 1/2 x 11 sheets. I could not read all the notes. Asked him to submit 1/4" drawings (2) sets
|
Application received | | 3/7/2017 | | | |
|
|
|
|