Permit NumberBLD17-00533
StatusFinaled
Name TAHOE HOMES LLC
Site Address 7143 E GHOST BAR ST
Project NameLatigo 17C
Customer Number 
ePlanReviewNo
Description
WUI Zone 'B', class 'A' roof required; Permit for the construction of a new 2691 sq. ft., two story (first story 1117 sq. ft., second story 1574 sq. ft.) single family dwelling with 6 bedrooms, 2.5 bathrooms, approximately 285 sq. ft. of covered patio/porch and a 802 sq. ft. attached garage per the approved plans, engineering, ResCheck, ACCA report and any notations. R-1C/DA zoning and setbacks per planning.//leg
***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/21/201711/24/201711/24/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled11/24/201711/24/201711/24/2017PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval11/22/201711/22/201711/22/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
BLD-Final11/20/201711/21/201711/21/2017ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
BLD-Energy code compliance9/22/20179/22/20179/22/2017PPASS
DetailsBrandon Shaw
Corrections satisfactory
BLD-Energy code compliance9/18/20179/20/20179/20/2017ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Clint Wall fming c/n not done
BLD-Framing/Rough-in9/15/20179/18/20179/18/2017PFAIL
DetailsBrandon Shaw
See correction notice

OK to insulate
BLD-Framing/Rough-in9/12/20179/18/20179/15/2017ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Paul Fedorchuk
BLD-Wall Bracing9/1/20179/1/20179/1/2017PPASS
DetailsBrandon Shaw
Guillurmo Phone #: ###-####
BLD-Foundation4/28/20174/28/20174/28/2017PPASS
DetailsBrandon Shaw
As early as possible Phone #: 2088708880 >> Inspection requested via mobile web by Wes
BLD-Footing4/27/20174/27/20174/27/2017PPASS
DetailsBrandon Shaw
BLD-Footing4/27/20174/27/20174/27/2017ACANC
DetailsBrandon Shaw
As late as possible Phone #: 2088708880 >> Inspection requested via mobile web by Wes
BLD-Footing4/21/20174/24/20174/24/2017ANR
DetailsBrandon Shaw
As late as possible Phone #: 2088708880 >> Inspection requested via mobile web by Wes
PubWorks Subgrade Approval4/21/20174/21/20174/21/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  4/5/2017 DONE
OVERRIDE  3/27/2017  
Inspection Record Card- Bld  3/27/2017 DONE
Telephone call  3/27/2017 DONE
Left a message informing that this permit is ready to be picked up and the fee amount due for issuance.
Permit Ready to Issue  3/27/2017 DONE
MET
Plan assigned to (LEG) Tisha3/8/2017 3/24/2017 DONE
DetailsTisha Gallop
3/21 Latigo 17C
Routing - PLAN CHECK3/23/2017 3/24/2017 PASS
DetailsTisha Gallop
1st review completed  3/24/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/24/2017 DONE
Case Summary (BLD)  3/24/2017 DONE
Routing PW Grading-Hillside3/21/2017 3/23/2017 PASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS3/23/2017 3/23/2017 PASS
DetailsMorgan Webb
Plan resubmittals received  3/21/2017 DONE
DetailsChristina Prado
Received three sets of Finished Lot Grading Plan sheets (G1); Plans stamped and taken to Plan Review for routing
Route to Impact Fee Review3/8/20173/11/20173/13/2017 PASS
DetailsTonya Wallace
Initial residential review of all new news permit requested for now.
Routing - FIRE3/13/20173/8/20173/13/2017 PASS
DetailsScott Arellano
No comments.
Routing PW Grading-Hillside3/8/2017 3/13/2017 FAIL
DetailsJason C. Taylor
Need revised grading plans. JCT
1st review completed  3/13/2017  
Routing - MECHANICAL3/13/2017 3/13/2017 PASS
DetailsTroy James
Routing - PLANNING3/13/2017 3/13/2017 PASS
DetailsColleen T Carroll
Routing - PUBLIC WORKS3/13/2017 3/13/2017 FAIL
DetailsMorgan Webb
Routing - Erosion and Sediment3/13/2017 3/13/2017 PASS
DetailsAndy J. Long
Pre-approved ESC plan waiver; valid RP
Plans ACCEPTED BY PLAN TECH  3/8/2017 DONE
Intake Approval  3/8/2017 PASS
Recd Pcfee & Taken To Pln CK  3/8/2017 DONE
Routing - Addressing3/8/2017 3/8/2017 PASS
DetailsLaura Hunter
Routing PW Sewer Rating3/8/2017 3/8/2017 PASS
DetailsRachael Beierle
Application received 3/8/2017