Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD17-00543
StatusFinaled
Name RES CONTRACTING & MECHANICAL
Site Address 8001 W FRANKLIN RD
Project Name4 Wheel Parts - interior demo
Customer Number 
ePlanReviewNo
Description
(4 WHEEL PARTS – DEMOLISH PORTION OF MEZZANINE FLOOR – EAST END OF BUILDING) The fire sprinkler system is used for unlimited area of the building. The tenant improvement work will be done under permit BLD17-00371. To demolish about 388 square feet of an existing 2,350 square foot mezzanine floor. After the demolition, the mezzanine will have a floor area of about 1,962 square feet. Existing columns are required to be maintained. According to the project Structural Engineer, the demolished portion of the mezzanine floor does not provide any structural support, gravity or lateral, for the rest of the building. Work also includes interior nonstructural demolition. No new work is allowed under this permit. This permit does not establish a Certificate of Occupancy for any tenant or for any portion of the building. The fire sprinkler system is required to be maintained operational per NFPA 13 as regulated by the Fire Department. CJW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Follow up  7/11/2018 DONE
Structural Demo - no final value required
Third Notice 5/15/20186/11/2018 DONE
mailed 6-12
Third Notice 4/15/20185/10/2018 DONE
mailed 5-11-18
Third Notice 3/19/20184/10/2018 DONE
mailed 4-11-18
Second Notice 2/22/20183/14/2018 DONE
mailed 3-16-18
First Notice1/31/20181/31/20182/12/2018 DONE
DetailsMike Jordan
Mailed 2-13-18
BLD-Aging Inspection1/30/20181/30/20181/31/2018 PASS
DetailsMike Jordan
DOC - Permit Finaled1/31/20181/31/20181/31/2018PPASS
DetailsMike Jordan
Work has been done and completed and C.O issued.
Issue PAID IN FULL permit  3/16/2017 DONE
Plan assigned to (CJW)3/8/20173/8/20173/15/2017 PASS
DetailsCarl Westfall
Demo for "4 Wheel Parts"
Routing - PLAN CHECK3/8/2017 3/15/2017 PASS
DetailsCarl Westfall
Review was delayed waiting for structural analysis.
1st review completed  3/15/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/15/2017 DONE
Permit Ready to Issue  3/15/2017 DONE
DetailsChristina Prado
All requirements met
Application received 3/8/2017