Permit Information
Permit NumberBLD17-00566
StatusFinaled
Name SAUCERMAN CONSTRUCTION
Site Address 8400 W WESTPARK ST
Project NameCable One
Customer Number 
ePlanReviewYes
Description
(CABLE ONE – WHOLE BUILDING TENANT) (7-2-18 PLAN MODIFICATION TO CREATE A 431 SQUARE FOOT OFFICE WITH DOOR AND GLASS SIDELIGHT AND A 129 SQUARE FOOT OFFICE WITH DOOR AND INTERIOR SLIDING WINDOW WITHIN AN OPEN OFFICE AREA, TO RELOCATE DOOR 111A AND TO CUT BACK A BASE CABINET TO PROVIDE 18 INCHES ON THE PULL SIDE OF THE DOOR, TO RELOCATE DOOR 113A WHICH WOULD OTHERWISE BE IN CONFLICT WITH DOOR 111A, TO CONSTRUCT AN INTERIOR CLOSET WITH A DOUBLE LEAF DOOR, TO CONSTRUCT INTERIOR NONSTRUCTURAL WALLS, AND TO RELOCATE THE DRINKING FOUNTAINS.) (12-29-17 PLAN MODIFICATION TO INCREASE THE OCCUPANT LOAD OF “MEETING ROOM 106” FROM 69 TO 99 BASED ON THE SUBMITTED FURNITURE PLAN SHOWING 96 CHAIRS AND DIMENSIONED AISLES. WORK INCLUDES UPGRADING THE EGRESS PATH THROUGH “OPEN OFFICE 107” AND “LOBBY 102”. THE SWING OF A GATE WILL BE CHANGED TO SWING IN THE DIRECTION OF EGRESS TRAVEL AND PANIC HARDWARE WILL BE PROVIDED ON THE GATE. THUMB TURNS WILL BE REMOVED FROM EXISTING AUTOMATIC DOORS.) Phase 1 and 2-This building does not have a fire sprinkler system. To expand a meeting room to 1,032 square feet, to expand the adjacent break room to 664 square feet, to create a 233 square foot conference room, and to create miscellaneous other rooms within an existing 14,680 square foot one story office building. Work is to include interior nonbearing wall, an interior 2-hr fire-resistance-rated occupancy separation wall (fire barrier wall) with 90 minute fire doors, interior doors and windows, a storage cage made from chain link fencing, service counters, a new suspended acoustical ceiling, a gypsum board soffit, lever hardware on existing doors, millwork, and finishes. New roof top HVAC units will be installed in conjunction with this permit. The new units are not allowed to weigh more than the units they replace. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. A separate fire alarm permit shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/12/201811/15/2018 DONE
This permit finaled on the web by Paul Saucerman
Second Notice 10/22/201811/7/2018 DONE
mailed 11-12
First Notice 9/21/201810/12/2018 DONE
mailed 10-15-18
BLD-Final9/10/20189/11/20189/11/2018APASS
DetailsMike Jordan
Please call 30 min prior to inspection. Phone #: ###-#### Inspection requested via web by John Saucerman. the panic hardware has been installed. ok for perm occ.
Permanent Occupancy  9/11/2018 DONE
BLD-Final9/6/20189/7/20189/7/2018AFAIL
DetailsMike Jordan
Please call; 30 min prior to inspection Phone #: ###-#### Inspection requested via web by John Saucerman. Provided panic hardware on the south east exit door. Everything else ok.
FIRE-Final Inspection9/6/20189/6/20189/6/2018PPASS
DetailsJim Page
No fire sprinklers, fire alarm inspection is complete (FIR17-00512), fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.

Please call 30 min prior to inspection Phone #: ###-#### Inspection requested via web by John Saucerman
Temporary Occupancy8/28/201811/26/20188/28/2018 DONE
DetailsCandy A. Nichols
Jason B ok'd 30 day ext on Temp C of O from 8/26/18
Telephone call  8/27/2018 DONE
called Paul again about the temp c of o that expired yesterday. Left message on his phone
Temporary Occupancy8/23/201811/21/20188/23/2018 DONE
DetailsCandy A. Nichols
changed status from iss to temp c of o since the plan mod was issued
Telephone call  8/23/2018 DONE
called Paul to remind about the TCO that will expire 8/26/18-he will contact the arch to request the extension
BLD-Ceiling Grid Inspection7/25/20187/26/20187/26/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by John Saucerman
Print Occupancy Form  7/17/2018 DONE
CHANGE STATUS TO (ISS)  7/17/2018 DONE
plan mod paid
OVERRIDE  7/3/2018  
Permit Ready to Issue  7/3/2018 DONE
Plan Mod 2 Approved
DO NOT REISSUE
Plan assigned to (CJW)6/28/20186/28/20187/2/2018 PASS
DetailsCarl Westfall
Routing - PLAN CHECK6/28/2018 7/2/2018 PASS
DetailsCarl Westfall
2nd plan mod approved
Plan Reviewer's activity  7/2/2018 DONE
2nd plan mod approved
Plan Modification Accepted  6/28/2018 DONE
Owner requested door 113A be relocated. this revision required door 111A to also be relocated.
Owner added a wall and door at Open Office 128 and created a new office space 131.
Owner removed a portion of wall at hall 124 and added new vending alcove and relocated the drinking fountain from break room to this alcove. new office 125 has been added within the open office 126
BLD-Framing/Rough-in6/15/20186/15/20186/15/2018PPART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by John Saucerman. Interior steel stud framed walls ok. Needs to submit plan mod to reflect the adtional walls that have been aded.
Temporary Occupancy5/31/20188/29/20185/31/2018 DONE
DetailsCandy A. Nichols
5-31-18 JB ok'd temp c of o extension from 5/28/18
Telephone call  5/30/2018 DONE
emailed Paul that the temp c of o expired on 5/28/18-he will reach out to Will and have him contact Jason Blais today
BLD-Ceiling Grid Inspection5/7/20185/8/20185/8/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by John Saucerman. Lobby area grid ok.
BLD-Ceiling Grid Inspection5/4/20185/7/20185/7/2018PCANC
DetailsMike Jordan
Ceiling grid in lobby. Phone #: ###-#### >> Inspection requested via web by Shane Treasure Inspection cancelled from web by: Shane Treasure
BLD-Ceiling Grid Inspection4/27/20184/30/20184/30/2018APASS
DetailsMike Jordan
Please call Shane at 208 954 4469 with any questions. Phone #: ###-#### Inspection requested via web by Shane Treasure
BLD-Framing/Rough-in3/15/20183/15/20183/15/2018PPASS
DetailsMike Jordan
Please call prior to inspection Phone #: ###-#### Inspection requested via web by John Saucerman. Interior steel stud framed walls only ok, phase 2A.
Temporary Occupancy3/9/20186/7/20183/9/2018 DONE
DetailsCandy A. Nichols
CHANGE STATUS TO (ISS)  3/9/2018 DONE
Telephone call  3/8/2018 DONE
called Paul to let know he needs to either request a final inspection or email Jason B for an extension on the Temp C of O
BLD - Request for Extension2/8/20182/9/20182/9/2018APASS
DetailsMike Jordan
Paul Phone #: ###-####
Telephone call  2/9/2018 DONE
sent email to Paul telling him what his new expiration date is
BLD-Conference2/8/20182/9/20182/8/2018ADONE
DetailsCandy A. Nichols
this is a test inspection to see if it extends to permits expiration date
CHANGE STATUS TO (ISS)  2/8/2018 DONE
(F) Reprint permit  2/8/2018 DONE
Expiration Notice1/29/20182/20/20181/29/2018 DONE
DetailsBrittany Hill
OVERRIDE  12/29/2017  
Plan assigned to (CJW)12/27/201712/27/201712/29/2017 PASS
DetailsCarl Westfall
x Plan mod - Cable one
Routing - PLAN CHECK12/27/2017 12/29/2017 PASS
DetailsCarl Westfall
Plan Reviewer's activity  12/29/2017 PASS
1st plan mod approved
Permit Ready to Issue  12/29/2017 DONE
Plan Mod aprroved. DO NOT RE ISSUE
Plan Modification Accepted  12/27/2017 DONE
plan nmod accepted in e plan-adjustments haqve been made to the meeting room #106. New layout provided identifies clearance requirements and updated dimensions as requested for this submittal. Also added phase 1A scope of work for the contractor to accommodate required exiting through open office & lobby as requisted prior to completion of phase 2
Temporary Occupancy11/29/20172/27/201811/29/2017 DONE
DetailsCandy A. Nichols
First Notice 11/26/201711/29/2017 DONE
the permit was finaled by mistake-phase 2 still needs to be done before a perm c of o is issued
CHANGE STATUS TO (ISS)  11/29/2017 DONE
was finaled by mistake-phase 1 is complete so a temp c of o will be sent to Paul Saucerman-phase 2 will start in or about March of 2018
Print Occupancy Form  11/29/2017 DONE
Telephone call  11/29/2017 DONE
after talking to Carl W, Mike Jordan and Jason B-permit was finaled by mistake-this permit is being done in 2 phases-Phase 1 was ok'd for a temp c of o and phase 2 will begin in or about March of 2018-emailed the temp c of o and sign off card to Paul Saucerman
Permanent Occupancy  11/16/2017 DONE
was issued by mistake-temp c of o was issued for phase 1 and phase 2 will begin in or about March of 2018-I emailed Paul Saucerman with the temp c of o and the revised sign off card
BLD-Final11/14/201711/14/201711/14/2017PPART
DetailsMike Jordan
Please call 30 minutes prior to arrival for inspection Phone #: ###-#### Inspection requested via web by John Saucerman. Ok temp c of o-phase 2 will start in or about March 2018
FIRE-Final Inspection11/13/201711/14/201711/14/2017PPART
DetailsTroy Cobbley
Life safety for Phase I passed.

Please call 30 minutes prior to inspection Phone #: ###-#### Inspection requested via web by John Saucerman
FIRE-Final Inspection11/3/201711/6/201711/6/2017PFAIL
DetailsTroy Cobbley
For phase I to be passed I need exit discharge lights at the marked exits and per Carl Westfall a temporary occupant load sign of 49 for Room 106. This will allow only one exit required until the permanent exit path through phase 2 is finished

Phone #: ###-#### Inspection requested via web by John Saucerman
BLD-Ceiling Grid Inspection7/7/20177/10/20177/10/2017APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by John Saucerman
BLD-Wall cover6/2/20176/5/20176/5/2017APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by John Saucerman
BLD-Wall cover5/31/20176/1/20176/1/2017PPART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by John Saucerman. work in progress on 1st. layer, ok.
BLD-Framing/Rough-in5/30/20175/31/20175/31/2017PPART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by John Saucerman. Interior steel stud walls for infills and new conferance rooms phase 1. provide UL listed and approved plumbing boxes for 2hr. wall.
Issue PAID IN FULL permit  4/28/2017 DONE
Print Occupancy Form  4/28/2017 DONE
Plan assigned to (CJW)3/13/20173/13/20174/25/2017 PASS
DetailsCarl Westfall
(1st done) (Mar 31 - 15 days) (43 sheets) Cable One
Routing - PLAN CHECK4/21/2017 4/25/2017 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  4/25/2017 DONE
Permit Ready to Issue  4/25/2017 DONE
***all requirements met 4-28-17 /CEV

Needs; GC Form & Revised Cert of Value
Plan resubmittals received  4/21/2017 DONE
Route to Impact Fee Review4/10/20174/13/20174/11/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
Routing - PLAN CHECK3/13/2017 4/10/2017 FAIL
DetailsCarl Westfall
Resubmittal required
1st review completed  4/10/2017 DONE
Plan resubmittals requested  4/10/2017 DONE
Routing - FIRE3/13/20173/13/20173/17/2017 PASS
DetailsKatie Marron
Comments attached to case.
Routing - MECHANICAL3/13/2017 3/16/2017 PASS
DetailsTroy James
Routing - PLUMBING3/13/2017 3/15/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing3/13/2017 3/13/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS3/13/2017 3/13/2017 PASS
DetailsRachael Beierle
WEST BOISE SEWER DISTRICT
Routing - Erosion and Sediment3/13/2017 3/13/2017 PASS
DetailsAndy J. Long
Construction activity @ Cable One Westpark office covered under ESC17-00047
Intake Approval  3/13/2017 PASS
DetailsAdele J Schaffeld-Griffin
Javier approved pre screen and fees paid verified at front counter
Application received  3/9/2017 DONE
Application submitted via PDS Online on Mar 9 2017 1:52PM