BLD-Final | 8/24/2018 | 8/27/2018 | 8/27/2018 | A | PASS |
Tony Young
|
|
|
rusty Phone #: ###-####
|
DOC - Permit Finaled | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 8/21/2018 | 8/21/2018 | 8/21/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Final | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | NR |
Mike Jordan
|
|
|
Rusty Phone #: ###-####. Needs public works final.
|
BLD-Final | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | PEND |
Brandon Shaw
|
|
|
Pending PW approval and stairs/hand/guardrail instalation
Temp C of O ok...
|
BLD-Footing | 5/18/2018 | 5/21/2018 | 5/22/2018 | P | PASS |
Tony Young
|
|
|
Rusty Phone #: ###-####,, exterior stair footing ok
|
PubWorks Subgrade Approval | 5/21/2018 | 5/21/2018 | 5/21/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | PEND |
Tony Young
|
|
|
Rusty Phone #: ###-####
|
BLD-Footing | 5/15/2018 | 5/16/2018 | 5/17/2018 | A | PEND |
Tony Young
|
|
|
Rusty Phone #: ###-####
|
BLD-Footing | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | PEND |
Tony Young
|
|
|
Rusty Phone #: ###-####,, still waiting on hillside soils report..
|
BLD-Footing | 5/14/2018 | 5/14/2018 | 5/15/2018 | P | PEND |
Tony Young
|
|
|
Rusty Phone #: ###-####
|
BLD-Footing | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | DEFR |
Tony Young
|
|
|
Rusty Phone #: ###-####,, needs soils
|
BLD-Final | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | NR |
Tony Young
|
|
|
Rusty Phone #: ###-####,, walk through only
|
CHANGE STATUS TO (ISS) | | | 4/17/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/13/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 4/5/2018 | 4/5/2018 | 4/13/2018 | | DONE |
Brian McGowan
|
|
|
plan mod 1 hr review fee
|
Routing - PLAN CHECK | 4/5/2018 | | 4/13/2018 | | PASS |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/13/2018 | | DONE |
|
|
|
DO NOT REISSUE, plan mod fee due
|
Routing PW Grading-Hillside | 4/5/2018 | | 4/11/2018 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
Routing - PLANNING | 4/5/2018 | | 4/6/2018 | | PASS |
Leon Letson
|
|
|
CFH17-00011 Leon - plan mod to add exterior stair
|
Plan Modification Accepted | | | 4/5/2018 | | DONE |
|
|
|
plan mod workflow started to add exterior staircase
|
BLD-Other | 3/21/2018 | 3/22/2018 | 3/23/2018 | P | PASS |
Tony Young
|
|
|
fire soffit // Rusty Phone #: ###-####,, fire dampers installed,, other soffit areas ok in house
|
BLD-Other | 3/16/2018 | 3/19/2018 | 3/21/2018 | A | PART |
Tony Young
|
|
|
fire soffit // Rusty Phone #: ###-####
|
BLD-Other | 3/15/2018 | 3/16/2018 | 3/17/2018 | P | PART |
Tony Young
|
|
|
fire soffit // Rusty Phone #: ###-####,, work in progress
|
BLD-Wall cover | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PART |
Tony Young
|
|
|
fire soffit // Rusty Phone #: ###-####,, work in progress
|
BLD-Other | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PART |
Tony Young
|
|
|
fire soffit // Rusty Phone #: ###-####,, work in progress on 2' soffits,, back patio cover has mech vents?, may need to fire protect
|
BLD-Energy code compliance | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | PASS |
Tony Young
|
|
|
Rusty Phone #: ###-####
|
BLD-Framing/Rough-in | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Tony Young
|
|
|
Rusty Phone #: ###-####,, ok to insulate
|
Plan Modification Accepted | | | 2/9/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/9/2018 | | 2/9/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 2/6/2018 | 2/7/2018 | 2/7/2018 | A | PASS |
Tony Young
|
|
|
house // Rusty Phone #: ###-####
|
BLD-Energy code compliance | 2/5/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Tony Young
|
|
|
Shop // Rusty Phone #: ###-####
|
BLD-Wall Bracing | 2/5/2018 | 2/6/2018 | 2/6/2018 | A | PART |
Tony Young
|
|
|
house // Rusty Phone #: ###-####,, work in progress
|
BLD-Framing/Rough-in | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PASS |
Tony Young
|
|
|
Shop // Rusty Phone #: ###-####
|
BLD-Framing/Rough-in | 1/17/2018 | 1/17/2018 | 1/18/2018 | P | PART |
Tony Young
|
|
|
Rusty-shop only Phone #: ###-####,, corrections,, ok to insulate
|
BLD-Foundation | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####,, attached garage,, detached shop barn ok
|
BLD-Foundation | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PART |
Tony Young
|
|
|
Mike Phone #: ###-####,, work in progress on house garage
|
BLD-Footing | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | PART |
Tony Young
|
|
|
Rusty Phone #: ###-####,, attached garage and barn/shop ok
|
PubWorks Subgrade Approval | 11/16/2017 | 11/16/2017 | 11/16/2017 | | DONE |
Jason C. Taylor
|
|
|
**attached garage, detached garage, and southern patio footings. onky*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PEND |
Tony Young
|
|
|
Rusty Phone #: ###-####
|
BLD-Footing | 11/14/2017 | 11/14/2017 | 11/14/2017 | P | NR |
Tony Young
|
|
|
Rusty Phone #: ###-####,, shop/barn and attached garage,, needs soils report 1st
|
BLD-Foundation | 9/20/2017 | 9/21/2017 | 9/21/2017 | P | PASS |
Tony Young
|
|
|
Rusty Phone #: ###-####,, front wall
|
BLD-Footing | 9/20/2017 | 9/20/2017 | 9/20/2017 | P | PART |
Tony Young
|
|
|
Rusty Phone #: ###-####,, front
|
BLD-Foundation | 9/14/2017 | 9/15/2017 | 9/15/2017 | A | PART |
Dave Hannah
|
|
|
Rusty Phone #: ###-#### high wall ok to pour
|
BLD-Footing | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PART |
Tony Young
|
|
|
Mike Phone #: ###-####,, ok,, work in progress
|
BLD-Footing | 9/11/2017 | 9/11/2017 | 9/12/2017 | P | PEND |
Tony Young
|
|
|
Mike Phone #: ###-####
|
PubWorks Subgrade Approval | 9/12/2017 | 9/12/2017 | 9/12/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 9/8/2017 | 9/11/2017 | 9/11/2017 | A | NR |
Tony Young
|
|
|
Mike Phone #: ###-####
|
BLD-Footing | 9/7/2017 | 9/8/2017 | 9/11/2017 | P | NR |
Tony Young
|
|
|
Mike Phone #: ###-####,, need soils approval
|
Issue PAID IN FULL permit | | | 9/7/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/7/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/6/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 6/22/2017 | 6/22/2017 | 9/6/2017 | | DONE |
Brian McGowan
|
|
|
1st review complte - FAIL- 7/11 sfd Level 2 ePlan
|
Routing - PLAN CHECK | 9/6/2017 | | 9/6/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/6/2017 | | DONE |
|
|
|
No sewer connection, will have to work with central district health. Spoke to Rachael
|
Routing PW Grading-Hillside | 8/25/2017 | | 8/25/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing PW Grading-Hillside | 8/22/2017 | | 8/22/2017 | | FAIL |
Melissa Jannusch
|
|
|
See changemark in ePlan
Please add retaining wall heights and separation distance.
|
1st review completed | | | 7/25/2017 | | FAIL |
Brian McGowan
|
|
|
Drading Plan does not match home design, tall wall engineering reqd, wall bracing does not meet prescriptive, WUI issues
|
Routing - PLAN CHECK | 6/22/2017 | | 7/25/2017 | | FAIL |
Brian McGowan
|
|
|
|
Routing - FIRE | 7/6/2017 | 7/6/2017 | 7/6/2017 | | PASS |
Katie Marron
|
|
|
Residence to be fully fire sprinklered. Revised report and supporting documentation attached to case.
|
Route to Impact Fee Review | 6/22/2017 | 6/25/2017 | 6/29/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 6/22/2017 | | 6/28/2017 | | PASS |
Jason C. Taylor
|
|
|
Project approved under GRD17-00029.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - MECHANICAL | 6/22/2017 | | 6/26/2017 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 6/22/2017 | 6/22/2017 | 6/23/2017 | | FAIL |
Scott Arellano
|
|
|
Report attached to case and emailed to applicant.
|
Routing - Addressing | 6/22/2017 | | 6/23/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/22/2017 | | 6/23/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 6/22/2017 | | 6/23/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved with GRD. Only 1 ESC permit for GRD and BLD
|
Routing - PLANNING | 6/22/2017 | | 6/22/2017 | | PASS |
Leon Letson
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/22/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/22/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/22/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/20/2017 | | FAIL |
|
|
|
Missing Res Check, Manual and asked to have drawings uploaded individually and lable correctly
|
Application received | | | 3/9/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 9 2017 3:34PM
|