Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-00569
StatusFinaled
Name ADAM PISHL
Site Address 7353 N PIERCE PARK LN
Project NamePishl Residenec
Customer NumberBLD09-00240
ePlanReviewYes
Description
***Plan Modification - 4-5-18 - Add exterior stairs to upper deck- See Engineering and additional drawings.Need subgrade insp. ***BJM*** - HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED, FULLY SPRINKLERED AS PER FIRE. Permit for the construction of a new 4581 sq. ft., two story (first story 2720 sq. ft., basement story 1861 sq. ft.) single family dwelling with 6 bedrooms, 4.5 bathrooms, approximately 872 sq. ft. of covered patio/porch and a 1101 sq. ft. attached garage per the approved plans, plan review report and any notations. Includes a 1602 square foot detached Garage. ***BJM*** R-1A zoning and setbacks per planning.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/24/20188/27/20188/27/2018APASS
DetailsTony Young
rusty Phone #: ###-####
DOC - Permit Finaled8/27/20188/27/20188/27/2018PPASS
DetailsTony Young
PubWorks Occupancy Approval8/21/20188/21/20188/21/2018 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
BLD-Final7/31/20188/1/20188/1/2018ANR
DetailsMike Jordan
Rusty Phone #: ###-####. Needs public works final.
BLD-Final5/23/20185/24/20185/24/2018APEND
DetailsBrandon Shaw
Pending PW approval and stairs/hand/guardrail instalation

Temp C of O ok...
BLD-Footing5/18/20185/21/20185/22/2018PPASS
DetailsTony Young
Rusty Phone #: ###-####,, exterior stair footing ok
PubWorks Subgrade Approval5/21/20185/21/20185/21/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing5/17/20185/18/20185/18/2018APEND
DetailsTony Young
Rusty Phone #: ###-####
BLD-Footing5/15/20185/16/20185/17/2018APEND
DetailsTony Young
Rusty Phone #: ###-####
BLD-Footing5/14/20185/15/20185/15/2018APEND
DetailsTony Young
Rusty Phone #: ###-####,, still waiting on hillside soils report..
BLD-Footing5/14/20185/14/20185/15/2018PPEND
DetailsTony Young
Rusty Phone #: ###-####
BLD-Footing5/11/20185/14/20185/14/2018ADEFR
DetailsTony Young
Rusty Phone #: ###-####,, needs soils
BLD-Final5/10/20185/11/20185/11/2018ANR
DetailsTony Young
Rusty Phone #: ###-####,, walk through only
CHANGE STATUS TO (ISS)  4/17/2018 DONE
Inspection Record Card- Bld  4/17/2018 DONE
OVERRIDE  4/13/2018  
Plan assigned to (BJM)4/5/20184/5/20184/13/2018 DONE
DetailsBrian McGowan
plan mod 1 hr review fee
Routing - PLAN CHECK4/5/2018 4/13/2018 PASS
DetailsBrian McGowan
Permit Ready to Issue  4/13/2018 DONE
DO NOT REISSUE, plan mod fee due
Routing PW Grading-Hillside4/5/2018 4/11/2018 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
Routing - PLANNING4/5/2018 4/6/2018 PASS
DetailsLeon Letson
CFH17-00011 Leon - plan mod to add exterior stair
Plan Modification Accepted  4/5/2018 DONE
plan mod workflow started to add exterior staircase
BLD-Other3/21/20183/22/20183/23/2018PPASS
DetailsTony Young
fire soffit // Rusty Phone #: ###-####,, fire dampers installed,, other soffit areas ok in house
BLD-Other3/16/20183/19/20183/21/2018APART
DetailsTony Young
fire soffit // Rusty Phone #: ###-####
BLD-Other3/15/20183/16/20183/17/2018PPART
DetailsTony Young
fire soffit // Rusty Phone #: ###-####,, work in progress
BLD-Wall cover3/14/20183/15/20183/15/2018APART
DetailsTony Young
fire soffit // Rusty Phone #: ###-####,, work in progress
BLD-Other3/13/20183/14/20183/14/2018APART
DetailsTony Young
fire soffit // Rusty Phone #: ###-####,, work in progress on 2' soffits,, back patio cover has mech vents?, may need to fire protect
BLD-Energy code compliance2/26/20182/26/20182/26/2018PPASS
DetailsTony Young
Rusty Phone #: ###-####
BLD-Framing/Rough-in2/20/20182/20/20182/20/2018PPASS
DetailsTony Young
Rusty Phone #: ###-####,, ok to insulate
Plan Modification Accepted  2/9/2018 DONE
new manual j report
Routing - MECHANICAL2/9/2018 2/9/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing2/6/20182/7/20182/7/2018APASS
DetailsTony Young
house // Rusty Phone #: ###-####
BLD-Energy code compliance2/5/20182/6/20182/6/2018PPASS
DetailsTony Young
Shop // Rusty Phone #: ###-####
BLD-Wall Bracing2/5/20182/6/20182/6/2018APART
DetailsTony Young
house // Rusty Phone #: ###-####,, work in progress
BLD-Framing/Rough-in2/5/20182/5/20182/5/2018PPASS
DetailsTony Young
Shop // Rusty Phone #: ###-####
BLD-Framing/Rough-in1/17/20181/17/20181/18/2018PPART
DetailsTony Young
Rusty-shop only Phone #: ###-####,, corrections,, ok to insulate
BLD-Foundation11/16/201711/17/201711/17/2017APASS
DetailsTony Young
Mike Phone #: ###-####,, attached garage,, detached shop barn ok
BLD-Foundation11/16/201711/16/201711/16/2017PPART
DetailsTony Young
Mike Phone #: ###-####,, work in progress on house garage
BLD-Footing11/15/201711/16/201711/16/2017APART
DetailsTony Young
Rusty Phone #: ###-####,, attached garage and barn/shop ok
PubWorks Subgrade Approval11/16/201711/16/201711/16/2017 DONE
DetailsJason C. Taylor
**attached garage, detached garage, and southern patio footings. onky*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing11/14/201711/15/201711/15/2017APEND
DetailsTony Young
Rusty Phone #: ###-####
BLD-Footing11/14/201711/14/201711/14/2017PNR
DetailsTony Young
Rusty Phone #: ###-####,, shop/barn and attached garage,, needs soils report 1st
BLD-Foundation9/20/20179/21/20179/21/2017PPASS
DetailsTony Young
Rusty Phone #: ###-####,, front wall
BLD-Footing9/20/20179/20/20179/20/2017PPART
DetailsTony Young
Rusty Phone #: ###-####,, front
BLD-Foundation9/14/20179/15/20179/15/2017APART
DetailsDave Hannah
Rusty Phone #: ###-#### high wall ok to pour
BLD-Footing9/11/20179/12/20179/12/2017APART
DetailsTony Young
Mike Phone #: ###-####,, ok,, work in progress
BLD-Footing9/11/20179/11/20179/12/2017PPEND
DetailsTony Young
Mike Phone #: ###-####
PubWorks Subgrade Approval9/12/20179/12/20179/12/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing9/8/20179/11/20179/11/2017ANR
DetailsTony Young
Mike Phone #: ###-####
BLD-Footing9/7/20179/8/20179/11/2017PNR
DetailsTony Young
Mike Phone #: ###-####,, need soils approval
Issue PAID IN FULL permit  9/7/2017 DONE
Inspection Record Card- Bld  9/7/2017 DONE
(F) Reprint permit  9/7/2017 DONE
Inspection Record Card- Bld  9/7/2017 DONE
OVERRIDE  9/6/2017  
Plan assigned to (BJM)6/22/20176/22/20179/6/2017 DONE
DetailsBrian McGowan
1st review complte - FAIL- 7/11 sfd Level 2 ePlan
Routing - PLAN CHECK9/6/2017 9/6/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  9/6/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  9/6/2017 DONE
No sewer connection, will have to work with central district health. Spoke to Rachael
Routing PW Grading-Hillside8/25/2017 8/25/2017 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing PW Grading-Hillside8/22/2017 8/22/2017 FAIL
DetailsMelissa Jannusch
See changemark in ePlan
Please add retaining wall heights and separation distance.

1st review completed  7/25/2017 FAIL
DetailsBrian McGowan
Drading Plan does not match home design, tall wall engineering reqd, wall bracing does not meet prescriptive, WUI issues
Routing - PLAN CHECK6/22/2017 7/25/2017 FAIL
DetailsBrian McGowan
Routing - FIRE7/6/20177/6/20177/6/2017 PASS
DetailsKatie Marron
Residence to be fully fire sprinklered. Revised report and supporting documentation attached to case.
Route to Impact Fee Review6/22/20176/25/20176/29/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Grading-Hillside6/22/2017 6/28/2017 PASS
DetailsJason C. Taylor
Project approved under GRD17-00029.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - MECHANICAL6/22/2017 6/26/2017 PASS
DetailsTroy James
Routing - FIRE6/22/20176/22/20176/23/2017 FAIL
DetailsScott Arellano
Report attached to case and emailed to applicant.
Routing - Addressing6/22/2017 6/23/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/22/2017 6/23/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment6/22/2017 6/23/2017 PASS
DetailsAndy J. Long
ESC plan approved with GRD. Only 1 ESC permit for GRD and BLD
Routing - PLANNING6/22/2017 6/22/2017 PASS
DetailsLeon Letson
Plans ACCEPTED BY PLAN TECH  6/22/2017 DONE
Intake Approval  6/22/2017 PASS
Recd Pcfee & Taken To Pln CK  6/22/2017 DONE
Intake Approval  6/20/2017 FAIL
Missing Res Check, Manual and asked to have drawings uploaded individually and lable correctly
Application received  3/9/2017 DONE
Application submitted via PDS Online on Mar 9 2017 3:34PM