BLD-Energy code compliance | 5/8/2017 | 5/9/2017 | 5/9/2017 | A | PASS |
Tony Young
|
|
|
Brad Phone #: ###-####
|
BLD-Energy code compliance | 5/5/2017 | 5/8/2017 | 5/8/2017 | A | PART |
Tony Young
|
|
|
Brad Phone #: ###-####,, back bedroom walls only.. need to have mech and elec pass on front areas ,, ok to insulate remainder after trades pass,, need seal pack prior to cover
|
BLD-Framing/Rough-in | 5/4/2017 | 5/5/2017 | 5/5/2017 | A | PASS |
Tony Young
|
|
|
Brad Phone #: ###-####,, ok to insulate
|
BLD-Framing/Rough-in | 5/3/2017 | 5/4/2017 | 5/4/2017 | A | FAIL |
Tony Young
|
|
|
Brad Phone #: ###-####,, still need trades passed,, no cover allowed
|
BLD-Framing/Rough-in | 5/3/2017 | 5/3/2017 | 5/3/2017 | P | FAIL |
Tony Young
|
|
|
Brad Phone #: ###-####,, need trades 1st
|
BLD-Framing/Rough-in | 5/2/2017 | 5/3/2017 | 5/3/2017 | A | FAIL |
Tony Young
|
|
|
Brad Phone #: ###-####,, need trades
|
BLD-Framing/Rough-in | 5/1/2017 | 5/2/2017 | 5/2/2017 | P | NR |
Tony Young
|
|
|
Brad Phone #: ###-####,, need trades
|
BLD-Framing/Rough-in | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | CANC |
Tony Young
|
|
|
Brad Phone #: ###-####
|
BLD-Framing/Rough-in | 5/1/2017 | 5/1/2017 | 5/1/2017 | P | NR |
Tony Young
|
|
|
Brad Phone #: ###-####,, need trades
|
PubWorks Subgrade Approval | 4/18/2017 | 4/18/2017 | 4/18/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
|
BLD-Footing | 4/14/2017 | 4/17/2017 | 4/17/2017 | A | PASS |
Brandon Shaw
|
|
|
Bradly Phone #: ###-#### Needs soil report, via email (Tony/Brandon) or left with permit.
|
BLD-Footing | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | PART |
Tony Young
|
|
|
Bradly Phone #: ###-####,, need soils approval 1st,, then ok,, drain any water from rain if applicable
|
Permit Ready to Issue | | | 3/21/2017 | | DONE |
|
|
|
All Met
|
Telephone call | | | 3/21/2017 | | DONE |
|
|
|
Spoke with Bradley informing him his permit is ready and the fee amount due for issuance
|
Issue PAID IN FULL permit | | | 3/21/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/16/2017 | 3/16/2017 | 3/20/2017 | P | PASS |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 3/20/2017 | | 3/20/2017 | | CANC |
Tisha Gallop
|
|
|
per e-mail from Andy Long no esc permit is required.
|
Inspection Record Card- Bld | | | 3/20/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/20/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/16/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 3/10/2017 | 3/10/2017 | 3/10/2017 | A | FAIL |
Tisha Gallop
|
|
|
need cross section, engineered foundation plan, detail and calcs sealed by engineer, need esc waiver or e-mail from Andy to say if waiver approved or no esc permit needed at all.
|
Routing Walk-In (Zoning) | 3/10/2017 | 3/10/2017 | 3/10/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (PW Hillside) | 3/10/2017 | 3/10/2017 | 3/10/2017 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
1st review completed | | | 3/10/2017 | | FAIL |
|
|
|
|
Application received | | 3/10/2017 | | | |
|
|
|
|