Letter of compliance/Occupancy | | | 12/14/2018 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 12/14/2018 | | DONE |
|
|
|
Per completed final inspections
|
Letter of compliance/Occupancy | | | 12/14/2018 | | DONE |
|
|
|
|
BLD-Final | 8/21/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Dave Hannah
|
|
|
Aaron Phone #: ###-####
|
FIRE-Final Inspection | 8/21/2017 | 8/22/2017 | 8/22/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, previously noted items have been repaired, fire extinguishers are in common area's with current inspection tags. Final life fire safety inspection for area of work passed/complete.
|
BLD-Final | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | NR |
Mike Jordan
|
|
|
Aaron Phone #: ###-####. Still needs fire/life/safety reinspection. Contacted Aaron to let him know.
|
BLD-Final | 8/16/2017 | 8/17/2017 | 8/17/2017 | P | NR |
Dave Hannah
|
|
|
Sean Phone #: ###-#### need fire final first
|
FIRE-Final Inspection | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | CANC |
Jim Page
|
|
|
Duplicate inspection request, this request is cancelled.
|
FIRE-Final Inspection | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | FAIL |
Jim Page
|
|
|
Exit signs/emergency lighting need to be installed per city approved plans in area of work. Exit discharge egress lighting needs to be installed on south exterior exit in area of work.
|
FIRE-Final Inspection | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | CANC |
Troy Cobbley
|
|
|
No inspection performed. I need the project related fire alarm permit inspected/finaled prior to a life safety inspection.
Sharm Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/4/2017 | 8/7/2017 | 8/8/2017 | A | PART |
Brandon Shaw
|
|
|
Ceiling grid ok, need fire approval
|
BLD-Framing/Rough-in | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | PASS |
Jim Storey
|
|
|
Shawn Phone #: ###-#### beam at bar ok
|
BLD-Final | 5/11/2017 | 5/11/2017 | 5/11/2017 | A | NR |
Dave Hannah
|
|
|
|
BLD-Final | 5/10/2017 | 5/10/2017 | 5/11/2017 | P | NR |
Dave Hannah
|
|
|
|
Inspection Record Card- Bld | | | 5/3/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/3/2017 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 3/21/2017 | 3/21/2017 | 4/13/2017 | | DONE |
Julie Romig
|
|
|
1st Review Completed. Due 3/4/ Level II Arid Club Remodel
|
Routing - PLAN CHECK | 4/8/2017 | | 4/13/2017 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/13/2017 | | DONE |
|
|
|
Needs; GC Form & Revised Cert of Value
|
Routing - FIRE | 4/8/2017 | 4/8/2017 | 4/12/2017 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Route to Impact Fee Review | 3/31/2017 | 4/3/2017 | 4/3/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 3/31/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 3/21/2017 | | 3/31/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 3/21/2017 | 3/21/2017 | 3/23/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Addressing | 3/21/2017 | | 3/21/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/21/2017 | | 3/21/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 3/21/2017 | | 3/21/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00032
|
Intake Approval | | | 3/21/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Julie approved pre screen
fees verified
|
Intake Approval | | | 3/17/2017 | | FAIL |
Julie Romig
|
|
|
Pre-screen #1: 16 drawing sheets uploaded as 1 PDF file - upload individual sheets with correct naming convention; Remove "Not for Construction" on Electrical plans; missing Design Review letter (DRH17-00032)
|
Application received | | | 3/10/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 10 2017 11:11AM
|
Routing Off Site - STRUCTURAL | 3/21/2017 | | | | PASS |
|
|
|
Pass per ePlanReview (AHJ Engineers)
|